Overhaul
Dismantling, inspecting, measuring and renewing worn parts of a machine according to the maker's manual.
In 9 languages
| Language | Term |
|---|---|
| English | Overhaul |
| Russian | Ремонт (переборка) |
| Romanian | Revizie generală |
| Polish | Remont (przegląd) |
| Latvian | Kapitālais remonts (pārskatīšana) |
| Filipino | Overhaul |
| Indonesian | Overhaul |
| Chinese | 检修(大修) |
| Croatian | Remont (generalni) |
Find it in the manuals All terms
Related terms
Fire main and emergency fire pumpSea water line to the fire hydrants; the emergency fire pump outside the engine room must give two jets and is tested regularly.Fixed CO₂ fire-extinguishing systemFloods the engine room with CO₂; before release everyone must be out, ventilation stopped and openings closed, after the alarm sounds.Fire detector (smoke, heat, flame)Sensors connected to the fire alarm panel; each one is tested with test gas or heat at the intervals of the maintenance plan.Quick-closing valveValve on a fuel or oil tank outlet that can be closed from outside the engine room in case of fire.Permit to workWritten permission for hazardous work such as hot work, work aloft or electrical work, signed after the precautions are checked.Enclosed space entryTanks, void spaces and boilers may lack oxygen or contain toxic gas; entry only after ventilation, gas testing and a permit, with a standby person.Lockout / tagout (isolation)Before maintenance, power and pressure are isolated, the switch or valve is locked and tagged so nobody can start the equipment.Planned maintenance system (PMS)Schedule of maintenance jobs by running hours or calendar, required by the ISM Code; completed jobs are recorded with findings.