SIRE 2.0: every question and how to answer it
All 385 questions of the SIRE 2.0 inspection in plain words, with what the inspector checks, how to answer, what to show and what to avoid. Open it on your phone during the inspection: filter by your rank or by the place the inspector is in.
How SIRE 2.0 works, in short
SIRE 2.0 is OCIMF's risk-based tanker inspection programme. The inspector works from a tablet and asks a set of questions chosen for your ship: Core questions (101 of them) are asked in every inspection, Rotational 1 and 2 questions vary between inspections. Every question can be answered on three sides: Human (does the crew know and do it), Process (is there a clear company procedure and is it followed) and Hardware (is the equipment in order). Human and Process answers are graded from “not as expected” to “exceeds expectations”. Questions are put to the ranks who do the work (“tagged ranks”), and the ship's photographs uploaded in advance are compared with what the inspector sees.
The best preparation is the same for every question: know the company procedure for the task, do it the way the procedure says, keep the records, and be able to show it.
Find a question
2. Certification and documentation 19 questions
2.1.1Maintenance of Statutory CertificationAll certificates valid and endorsed, tracked against survey windows, no overdue class items, indexed file ready on the Master's desk.Core2.2.1Superintendent vessel inspection and reportSuperintendent inspects every six months; reports on board; findings tracked and closed in the defect system.Core2.2.2Internal ISM auditInternal audit done within 12 months; every NC has root cause, corrective action and office-verified closure.Rotational 22.2.3Master's Review of the SMSI know the SMS layout and policy; last two Master's Reviews done on time, with real comments and office replies.Rotational 22.3.1Structural concerns and Enhanced Survey FileESP file complete and updated after each survey; Coating Technical File kept; no unreported structural or coating issues.Core2.3.2Structural concerns and Class Survey FileClass survey file complete and current; hold spaces and ballast tanks inspected and recorded; no unreported defects.Core2.3.3Cargo, ballast & void space inspectionEvery tank and void inspected on schedule, reports with ratings and photos, defects reported to the office.Rotational 22.3.4Monitoring cargo, ballast & void spaces for leakage and contaminationVoids and empty tanks sounded routinely, levels trended, ballast surface checked before discharge, all recorded.Rotational 22.3.5Condition Assessment Program (CAP)Enrolled in CAP with class; current rating and certificate on board.Rotational 22.4.1Defect reporting systemEvery defect raised in the company system, classified, risk-assessed if critical, and tracked to closure with the office.Core2.4.2Defect reporting to class, flag etcStatutory or class-related defects reported via the office to class, flag and port; dispensations on board where needed.Core2.5.1Management of ChangeAny change to class or statutory items goes through MoC: risk assessment, approvals, updated documents, crew trained.Rotational 12.6.1Ballast Water Management PlanBWMP understood, treatment system used as approved, every operation correctly entered and signed in the record book.Rotational 22.6.2VOC Management PlanVOC plan known; pressure kept up, venting minimised and recorded, measures included in the cargo plan.Rotational 12.6.3Ship Energy Efficiency Management Plan (SEEMP)SEEMP Parts I-III known; efficiency measures in use; fuel data accurate; CII rating and improvement plan understood.Rotational 12.7.1Availability of SMS content to all crewI know where to find my procedures, can open them quickly and understand them in the working language.Rotational 22.7.2Communication lines with the company and DPAI know my chain of command, the DPA's name and number, and that I can contact the DPA directly.Rotational 22.8.1HVPQ accurately completedHVPQ reviewed before inspection and matches the ship and its certificates; discrepancies reported for correction.Core2.8.2Last Port State Control InspectionLast PSC report on board; every deficiency rectified with evidence and closed in the company system.Rotational 13. Crew management 22 questions
3.1.1Crew qualifications and matrix verificationAll certificates valid and correct for ship type; officer matrix matches the crew on board; officers communicate clearly in English.Rotational 13.1.2Designated working languageWorking language recorded; all procedures and signs in it; I can communicate clearly in it.Rotational 13.1.3Minimum, standard and enhanced manning levelsManning meets the safe manning document and company standard; senior officer reliefs staggered with written handovers.Rotational 23.2.1Static navigational assessmentStatic navigation assessment report on board, matching the questionnaire, with findings closed.Rotational 13.2.2Dynamic navigational assessment by a company representativeCompany sailing navigation assessment report on board; findings known to officers and closed.Rotational 13.2.3Dynamic navigational assessment by a specialist contractorSpecialist contractor's sailing navigation assessment report on board; findings closed and shared.Rotational 13.2.4Unannounced remote navigational assessmentRemote VDR/ECDIS assessment report on board; findings discussed with officers and closed.Rotational 13.2.5Comprehensive cargo audit by a company representativeCompany cargo audit report on board; Chief Officer knows the findings and their closure.Rotational 13.2.6Comprehensive engineering audit by a company representativeCompany engineering audit report on board; findings tracked and closed.Rotational 13.2.7Comprehensive mooring and anchoring audit by a company representativeMooring and anchoring audit report on board; findings closed and practices updated.Rotational 13.2.8Behavioural Competency Assessment ProgrammeBehavioural competency assessments done by approved assessors for navigation, cargo, mooring and engineering, with records.Rotational 23.3.1Shore-based Bridge Team Management trainingShore-based BTM certificate within five years; I apply closed-loop communication and challenge-response.Rotational 23.3.2Formal ship handling trainingFormal ship handling course done before command/type change; I know this ship's handling characteristics.Rotational 23.3.3Cargo operations shore-based simulator courseShore-based cargo simulator course within five years, relevant to this ship type.Rotational 23.3.4Shore-based engine room management simulator courseShore-based ERM simulator course within five years; I apply engine room resource management.Rotational 23.3.5Training for Dynamically Positioned (DP) operatorsDP certificates and logbooks valid; training per IMCA and field rules for every DP role.Rotational 23.3.6LNG or other low-flashpoint fuel training and familiarisationIGF training valid for my duties; familiarised with the fuel system and its emergency actions.Rotational 23.4.1Hours of rest, records and monitoringHours of rest recorded honestly, match the logs; breaches reported and managed; I know the 10/77-hour rule.Core3.4.2Drug and alcohol abuse preventionPolicy known; unannounced tests done on schedule; calibrated breathalyser and trained tester on board.Rotational 23.5.1Familiarisation of crew, visitors and contractorsFamiliarisation completed and signed before duties; visitors briefed; I know my equipment and emergency duties.Core3.5.2Training and instruction LSA and FFAI can operate my LSA/FFA equipment; drills and training recorded regularly as per SOLAS and company plan.Rotational 13.5.3Familiarisation with ECDIS equipment installed on boardGeneric and type-specific ECDIS training plus ship familiarisation recorded; I can demonstrate key functions.Rotational 24. Navigation and communications 37 questions
4.1.1ECDIS set up and operationSafety settings derived from draught and UKC, set by the Master, recorded; alarms active; route checked; back-up ready.Core4.1.2Operation and testing of radar/ARPARadars checked and recorded; sea-stabilised for collision avoidance; know X vs S band; AIS only supplementary.Core4.1.3Operating and testing the steering control systemsI can change steering modes including emergency control; tests and three-monthly drills done and recorded.Rotational 14.1.4Automatic Identification System (AIS)AIS data correct for current voyage; annual test done; AIS is only an aid, never the sole collision avoidance tool.Rotational 14.1.5Bridge Navigational Watch Alarm System (BNWAS)BNWAS on at sea, key with Master; alarm stages known; tested and logged; on stage 2 alarm go straight to the bridge.Rotational 14.1.6Global Navigation Satellite System(s)GNSS correctly configured, cross-checked with radar/visual fixes, and I know how to spot jamming or spoofing.Rotational 24.1.7Echo sounderEcho sounder set to correct offset; I can calculate depth under keel; accuracy checked and recorded.Rotational 24.1.8Speed and distance measuring devicesLog type and speed mode known; accuracy checked against GNSS and recorded; feeds ARPA correctly.Rotational 24.1.9Navigation lights and shapesLights and alarms tested and visually checked, spares on board, shapes ready and I know when to show them.Rotational 24.1.10NAVTEX and SafetyNETCorrect NAVTEX/EGC areas set; warnings reviewed, logged and plotted on the route; expired ones removed.Rotational 24.1.11Preserving data from the VDR/S-VDRI know how to save VDR data after an incident; annual performance test valid; alarms checked.Rotational 24.1.12Magnetic and gyro compassesCompass error checked each watch and recorded; deviation card current; I can switch gyros safely.Rotational 24.1.13VHF/DSC transceiversVHF/DSC tested and logged daily; COLREGs come first; VHF agreements for collision avoidance carry risk.Rotational 24.1.14Daylight signalling lampDaylight lamp tested, battery charged, spares available, recorded.Rotational 24.1.15Sound signalling equipmentWhistle tested and logged; I know manoeuvring and restricted visibility signals under the COLREGs.Rotational 24.2.1Passage planningBerth-to-berth plan: appraisal, no-go areas, abort points, contingencies; approved, signed, followed and monitored.Core4.2.2Under keel clearance (UKC) policyUKC calculated for departure, transit critical points and arrival, all factors included; waivers documented.Core4.2.3Master's Standing Orders and Daily OrdersStanding Orders signed and understood; Night Orders daily; CPA/BCR, passing distance and call-Master rules followed.Rotational 14.2.4Electronic chart managementENCs updated weekly, T&P and AIO reviewed, permits cover the voyage, RNC use controlled.Rotational 24.2.5Paper chart managementPaper charts corrected to latest Notice, recorded in the log, T&P managed and scale suitable.Rotational 14.2.6Testing navigational equipment, main propulsion, steering gear and thrustersPre-departure/arrival checklists complete; steering, engine and thrusters tested before use and recorded.Rotational 14.2.7Nautical publicationsRequired publications current and corrected; electronic ones updated; new editions ordered on time.Rotational 24.3.1Minimum bridge team compositionBridge manning levels set in the plan for each stage and confirmed in the log; engine room mode matches.Core4.3.2Machinery space team compositionEngine room mode and manning set for each stage, communicated with the bridge and recorded.Core4.3.3Integrating a pilot (or similar role) into the bridge teamPilot card exchanged and explained; plan agreed; pilot monitored and challenged if needed.Rotational 14.3.4Bridge distractionsBridge kept free of distractions: no personal devices, no non-essential visitors or tasks during critical phases.Rotational 24.4.1Emergency Position Indicating Radio Beacon (EPIRB)EPIRB tested and maintained, expiry dates valid; manual activation known; false alert cancelled with RCC.Rotational 24.4.2Search and Rescue Transmitters (SARTs)SART mounted high in the craft; shows as dots on X-band radar; tested and battery valid.Rotational 24.4.3Survival craft portable two-way VHF radiosTwo-way VHFs stored at the agreed location, tested on a working channel, emergency batteries sealed and valid.Rotational 24.4.4Sending and receiving distress, urgency and safety messagesDesignated radio operator on the muster list; I can send DSC distress, urgency and safety messages; instructions posted.Rotational 24.4.5Operation and testing of GMDSS stationGMDSS tested daily, weekly and monthly as required; logged; batteries checked; survey and maintenance valid.Rotational 24.4.6Use of radio or mobile telephone equipment during cargo and ballast handlingOnly intrinsically safe radios in cargo areas; no mobile phones on deck; enough radios available and charged.Rotational 24.5.1Annual DP Trial report and supporting exercisesAnnual DP Trials report on board; findings known and closed; DP drills practised on varied scenarios.Rotational 24.5.2DP Position Reference SystemsPRS selected per offtake location, checked before ops, sensor offsets at hand for the DPO.Rotational 14.5.3DP events and incidentsDP events reported and investigated per company procedure; parameters continuously logged and kept.Rotational 14.5.4DP operations manualDP manual on board; I use the checklists, capability plots, consequence analysis and ASOG during operations.Rotational 24.5.5Field Operations ManualsLatest Field Operations Manual and FSOG on board; communication checks recorded; contacts and channels known.Rotational 25. Safety management 88 questions
5.1.1Records of mandatory and company defined emergency drillsAll mandatory and company drills are on a planner, done on time, recorded with lessons learned, and reflected in rest hour records.Core5.1.2Emergency plans & drills for principal fire scenariosI know my fire duty, the first actions for each main fire scenario, and our drills rotate through engine room, cargo area and accommodation.Rotational 15.1.3Pollution prevention drills required by SOPEP or SMPEPStop, contain, report: I know my SOPEP/SMPEP duties, where the spill kit is, and the reporting chain from the plan.Rotational 15.1.4Enclosed space rescue emergency response drillAttendant never enters: raise alarm, keep contact, ready gear; rescue team enters only with BA, tests atmosphere and lifts casualty with the stretcher.Rotational 15.1.5Drills required by the Ship Security Plan (SSP)Security drills every three months (extra after major crew change), annual exercise, varied scenarios, recorded; SSP stays confidential.Rotational 15.1.6Launching the lifeboat(s) and abandon ship drillsMonthly abandon ship drills, boat launched and manoeuvred at least every three months, and I can explain each launching step.Rotational 15.1.7Emergency plan & drills for a cargo vapour or liquid release, Including potential fireAlarm, ESD, stop cargo, water spray/curtain, secure accommodation, control ignition, PPE against cold and toxic exposure.Rotational 15.1.8Emergency plan & drills for collisionAlarm, stop/manoeuvre, close WT doors, muster, sound tanks, assess stability, prevent pollution and fire, report.Rotational 25.1.9Emergency plan & drills for groundingStop engines, alarm, signals, sound around and all tanks, assess stability before refloating, prevent pollution, report.Rotational 25.1.10Emergency plan & drills for loss of propulsionShow NUC, warn traffic, inform VTS and company, plot drift from wind and current, prepare anchors and towing early.Rotational 25.1.11Emergency plan & drills for failure of electrical powerEmergency generator starts automatically, transitional power bridges the gap; we find the cause, restore main power and essential services in sequence.Rotational 25.1.12Steering gear failure emergency drillEmergency steering drill every three months; I can change to local control, communicate with the bridge and follow helm orders.Rotational 25.1.13Emergency plan & drills for emergency towingETB on the bridge; aft gear deployable without power; I can explain rigging fore and aft and the safety precautions.Rotational 25.1.14Man overboard emergency drillShout, throw lifebuoy, MOB button, alarm, turn; rescue boat launched and recovered safely; I know my role.Rotational 25.1.15Emergency response plan & drills for recovery of persons from the waterOur plan names the gear and positions; I know my role, we lift horizontally where possible and treat for hypothermia.Rotational 25.1.16Emergency plans & drills for floodingAlarm, find and isolate the source, pump out (emergency bilge suction if needed), sound all spaces, assess stability, report.Rotational 25.1.17Emergency plans and drills for LNG bunker operationsESD, stop transfer, close valves, water curtain on, alarm and inform supplier; cryogenic PPE on; we drill it.Rotational 25.1.18Cargo leak into double hull spacesDetect by gas/sounding, stop and isolate, monitor, inert and transfer cargo; never discharge contaminated ballast; equipment ready and listed.Rotational 25.1.19OBO Forward space emergency pumping arrangementsI can explain and operate the forward space dewatering sequence; valves are marked, alarms work and the system is tested.Rotational 25.2.1Emergency fire pumpI can start the emergency fire pump locally and remotely; it is tested regularly and delivers pressure on deck.Core5.2.2Fire dampers & ventilation stopsI know where the dampers and remote fan stops are, how to close them, how they're tested, and their positions during cargo work.Rotational 15.2.3Fixed fire detection and fire alarm systemI can read the panel; all detectors are tested in rotation; isolations are authorised and logged; every alarm is checked at once.Rotational 15.2.4Machinery space fixed carbon dioxide fire extinguishing systemHead count, close openings, stop fans and fuel, open cabinet for alarm, release with both controls; CO2 room clear and serviced.Rotational 15.2.5Machinery space fixed high-expansion foam fire extinguishing systemI know the foam tank, control station and spaces covered; release after head count and closing openings; foam analysed in date.Rotational 15.2.6Machinery space fixed pressure water-spraying fire extinguishing systemI know the supply tank, the sections and how to start the pump and open a section; it is tested and instructions are posted.Rotational 15.2.7Fire pumps, fire main, fire main isolating valves and fire hydrantsFire pumps start locally and remotely; isolating valves and drains are known and marked; hydrants and main are in good order.Rotational 15.2.8Galley fixed and portable fire extinguishing systems & fire preventionKill the power and fans, smother with blanket or release the hood system; never water on oil; filters and ducts kept grease-free.Rotational 15.2.9Water-spray system on deckThe water spray cools and protects domes, manifolds and accommodation front; I know the valves and drains; it's tested and nozzles cleared.Rotational 15.2.10Cargo handling equipment space(s) fixed fire extinguishing systemCO2 protects the compressor/motor rooms; stop machinery, head count, close up, release from the posted station; serviced and checked.Rotational 15.2.11Fixed dry chemical powder fire extinguishing systemPressurise with nitrogen, open the outlet, aim at the base of the fire; purge lines after use; propellant and powder checked.Rotational 25.2.12Paint locker fixed fire-extinguishing systemI know the system, the outside release and how to use it; locker is tidy, ventilated and flammables stored safely.Rotational 25.2.13Machinery space fixed water-based or equivalent local application fire-fighting systemMist covers engine fuel areas, purifiers and boiler; automatic during UMS, manual when manned as configured; tested regularly.Rotational 25.2.14Cargo, ballast and stripping pump temperature sensing devicesSensors warn of hot bearings, glands and casings; set per maker; tested and recorded; on alarm stop the pump and investigate.Rotational 25.2.15Deck foam system, including portable applicatorsStart the fire pump, open foam valve, use monitors/applicators from upwind, apply gently; foam analysed in date.Rotational 25.2.16Fire doorsFire doors keep fire zones intact; they close and latch on their own, are tested, and are never wedged open.Rotational 25.3.1Firefighter’s outfits including self-contained breathing apparatus (SCBA)I can don and check an SCBA, know its pressure and endurance, recharge cylinders safely; sets are checked monthly and serviced annually.Rotational 15.3.2Fire hoses, nozzles and international shore connectionHoses and dual-purpose nozzles at every hydrant; ISC complete with bolts and gasket; hoses tested regularly.Rotational 25.3.3Portable fire extinguishersPin, aim at the base, squeeze, sweep; right type for each risk; checked onboard, serviced annually, spares carried.Rotational 25.3.4Emergency Escape Breathing Devices (EEBDs)EEBDs are for escape only, about ten minutes of air; I know where they are on my escape route; they're checked regularly.Rotational 25.3.5Wheeled (mobile) fire extinguishersWheel it in, run the hose out fully, activate and hit the base of the fire; units placed by high-risk areas and serviced.Rotational 25.4.1Davit-launched lifeboats, release mechanisms and launching appliancesWeekly and monthly checks, annual and five-yearly service done; I can explain hook release, reset checks and launching safely.Core5.4.2Free-fall lifeboat, its release systems and its launching applianceAll strapped, hatch closed, engine running, then hydraulic release; simulated launch only with restraints checked; serviced and inspected.Core5.4.3Dedicated rescue boat and launching applianceI can start the rescue boat, engage drive, slew and lower without main power; boat launched regularly and serviced.Core5.4.4Rocket parachute flares and line throwing appliancesTwelve flares on the bridge and a complete line-thrower, all in date and inspected; I can explain how to fire both safely.Rotational 25.4.5Liferafts, hydrostatic releases and liferaft launching appliancesRaft and HRU in date, painter via the weak link; float-free and manual launch both understood.Rotational 25.4.6Lifebuoys, and associated lights, smoke floats and lifelinesLifebuoys as per safety plan, free to throw, marked; lights, smoke signals and lines in date and checked.Rotational 25.4.7Immersion suitsMy suit is at a marked location, the right size, checked, and I can put it on within two minutes.Rotational 25.4.8Lifejackets and personal flotation devices (PFDs)Lifejacket in my cabin and at stations; working PFDs worn as the company requires; all inspected and inflatables serviced.Rotational 25.4.9Emergency lightingEmergency lighting runs from the emergency switchboard with battery back-up; it's tested to the PMS and every failed light is fixed.Rotational 25.5.1Enclosed space entry proceduresNo permit, no entry: ventilate, test (O2 21%, HC ≤1% LFL, toxics <50% OEL), rescue gear ready, attendant never leaves.Core5.5.2Hot work procedureOutside the workshop: permit, RA, gas test, isolations, fire watch, approval; stop if conditions change.Rotational 15.5.3Working at heightPermit and RA, harness clipped to a strong point, helmet, area below cleared, standby person; stop if weather or motion worsens.Rotational 25.5.4Working over the sidePermit, lifejacket plus harness and independent lifeline, standby person with lifebuoy, ship stopped and weather suitable.Rotational 25.5.5Working on electrical equipment and systemsPermit, isolate, lock and tag, prove dead; live work only when unavoidable and approved; HV and hazardous areas under special permit.Rotational 25.5.6Control of hazardous energyIdentify every energy source, isolate, lock and tag, prove zero energy, record it, and remove only when authorised.Rotational 25.6.1Portable and personal gas measurement instrumentsRight meter for each gas, bump test before use, span calibration with in-date gas, shore service on time; catalytic LEL not in inert atmosphere.Core5.6.2Testing the atmosphere in double-hull and double bottom spaces for flammable gasMonitor ballast and void spaces at the company interval with fixed or portable equipment, purge lines, record and act on any rise.Rotational 15.6.3Fixed gas detection systems required by the IGC CodeI know the monitored spaces, panel and set points; the system is calibrated with the right span gas and no point is left isolated.Rotational 15.6.4Fixed gas detection system required by the IGF CodeDetectors cover all gas fuel spaces and ducts; I know the alarm and shutdown points; tested, calibrated and bypasses controlled.Rotational 15.6.5Cargo pump room fixed gas detection systemPump room gas detection runs continuously with alarms in CCR and bridge; calibrated, set correctly and checked before every entry.Rotational 25.6.6Oxygen sensors in inert gas system spacesO2 sensors in the IG space warn of leaks; alarm set and tested; on alarm evacuate and do not enter without BA.Rotational 25.7.1Incident investigation reports for defined incidentsEvery incident reported; those above the threshold investigated with root causes and actions; lessons shared and actions closed.Core5.7.2Incident and near-miss reporting procedureReport it to the supervisor and in the company system; it's investigated, tracked to closure and the lesson shared; no blame for reporting.Rotational 15.7.3Shipboard safety meetingsSafety meetings held on schedule; minutes sent ashore; office replies on file; every concern tracked to closure.Rotational 15.7.4Work planning procedureDaily work planning meetings cover tasks, hazards, permits, PPE and rest; recorded and updated when plans change.Rotational 15.7.5Stop Work AuthorityAnyone can stop unsafe work, without blame; we make safe, discuss, fix and restart only when it's safe.Rotational 25.7.6Risk assessments for new, non-routine, unplanned or specified tasksIdentify hazards, rate risk, add controls, check residual risk, approve, brief the team and review generic RAs before every use.Rotational 25.7.7Safety Data SheetsSDS for every cargo, fuel, chemical and paint; I know hazards, PPE, first aid and spill actions from it.Rotational 25.7.8Simultaneous Operations (SIMOPS) procedureSIMOPS matrix tells us what can run together; extra controls agreed, terminal informed, stop if conditions change.Rotational 25.8.1Safety inspection of the main deck and mooring areasDeck and mooring areas are inspected on schedule; findings like worn lines, leaks or trip hazards are recorded, reported and fixed.Core5.8.2Safety inspection of the machinery spaceMachinery spaces inspected on schedule; leaks, hot surfaces, missing guards and housekeeping issues found, reported and fixed.Core5.8.3Safety inspections of the cargo pumproomPump room inspected per checklist; ventilation, gas detection, bilge alarm, glands and leaks checked, and every entry controlled.Core5.8.4Cargo machinery rooms safety inspectionsCompressor and motor rooms inspected per checklist; ventilation, air locks, shaft seals, gas detection and leaks checked and recorded.Core5.8.5Safety inspection of the forecastle spacesForecastle inspected per checklist; stores secured, enclosed spaces controlled, windlass and hydraulics checked.Core5.8.6Safety inspections of the accommodation spacesAccommodation inspected per checklist; electrical, fire, hygiene and escape hazards found, recorded and corrected.Rotational 15.8.7Ballast and/or bunker pumproom safety inspectionBallast/bunker pump room inspected per checklist; ventilation, gas checks, leaks and bilges controlled and recorded.Rotational 25.9.1Lifting and rigging equipment procedures, maintenance and inspectionEvery item in the register, marked with ID and SWL, certified and inspected; check before use and quarantine anything damaged.Rotational 15.9.2Spare parts for a single cargo hose handling craneRA identifies critical crane parts; minimum spares listed and on board; PMS inventory matches.Rotational 25.10.1Pilot boarding arrangementsCertified ladder, secured to strong points at the right height, officer in attendance with radio, lifebuoy and light ready.Rotational 15.10.2Accommodation laddersInspect, lower under control, angle within limits, net and lifebuoy rigged; annual exam and five-yearly test on record.Rotational 25.10.3Safe access to the vessel while alongside a terminal/berthAccess rigged and secured, net and lifebuoy in place, adjusted for tide and draft, watched at all times.Rotational 25.10.4Personnel transfer by craneTransfer only with RA and approval; certified basket and crane, lifejackets, communications and a contingency plan.Rotational 25.10.5Helicopter operationsICS guide and company checklist followed: area cleared and marked, venting stopped, fire and rescue parties ready, comms agreed.Rotational 25.10.6Helicopter facilitiesHelicopter team trained and drilled; deck area marked and lit; firefighting and crash kit ready; ICS guide followed.Rotational 25.10.7Escape routesI can lead you out from my workplace by the marked route; doors open from inside, routes clear and lit.Rotational 15.11.1Cargo and bunker sample managementBunker samples kept 12 months, cargo samples in a ventilated locker in the cargo area, logged, and disposed ashore.Rotational 25.12.1Respiratory protective equipmentSupplied-air only (SCBA/airline) for cargo work; filter respirators are not used; escape sets ready for toxic cargoes.Rotational 25.12.2Decontamination showers and eyewash stationsShowers and eyewash by the manifold, marked, tested and freeze-protected; flush at least 15 minutes.Rotational 26. Pollution prevention 16 questions
6.1.1Cargo Record BookRecord every Annex II cargo operation promptly with the correct code; officer signs each entry, Master each page; entries match cargo documents.Rotational 26.1.2Oil Record Book Part IIEach cargo, ballast, cleaning and slop operation is entered with the correct code, cross-checks with the ODME and ullage records, and is signed.Rotational 26.1.3Oil Record Book Part IEvery machinery space oil operation is recorded with the right code, tank names match the IOPP Supplement, and quantities balance with soundings and receipts.Rotational 26.1.4Garbage Record BookGarbage is segregated by category as per the GMP, every disposal is logged with position and quantity, and hazardous items are landed ashore.Rotational 26.1.5Ozone Depleting Substances Record BookEvery recharge, repair, leak and landing of ODS is logged in kg, and the equipment list matches the IAPP Supplement.Rotational 16.1.6MARPOL Annex VI NOx Compliance and Record KeepingEach engine has its EIAPP certificate, Technical File and parameter records up to date, and Tier III operation and failures are recorded and reported.Rotational 16.2.1Flooding or accidental leakage of cargo pumproom bilgesPumproom bilges can be pumped to the slop tank using remote-operated controls from outside the space, and the bilge alarms are tested and recorded.Rotational 26.2.2Cargo system overboard and sea suction valvesCargo-system sea and overboard valves closed, sealed and logged before transfer; the space between double valves regularly checked for leaks.Rotational 26.2.3Bunker pipeline system pressure testingBunker lines are pressure tested to the company's stated pressure and interval, and the date, pressure, duration and result are recorded.Rotational 26.3.1Ballast water management system (BWMS)Operate the BWMS per the manual, record every operation and alarm, and report failures to the company and port State before discharging ballast.Rotational 16.4.1Main deck oil or chemical spill clean up equipmentStop, alarm, contain with scupper plugs; clean up with the spill kit in PPE suited to the SDS; drum waste for shore disposal.Rotational 26.4.2Disposal of oily water in the forecastle and other internal spacesOily or polluted water from forward and internal bilges is pumped to a slop or waste tank or into drums, never overboard, and recorded.Rotational 26.5.1Emergency arrangements to pump out the machinery space bilgesMarked emergency bilge suction ready on the largest sea water pump; oily discharge only to save ship or life, then record and report.Rotational 26.5.2Incinerator operationTrained engineers only, interlocks working, no prohibited items such as batteries or PVC, no burning in port, every burn and ash logged.Rotational 16.6.1Oil filtering equipmentCalibrated 15 ppm alarm and three-way valve tested; overboard valve and flanges sealed; any defect or tampering stopped, recorded, reported.Rotational 16.6.2Oil discharge monitoring and control system (ODME)Flush and test the ODME, discharge only within MARPOL limits, stop at once on alarm or sighted oil, keep records three years.Rotational 17. Maritime security 6 questions
7.1.1Security threat and risk assessment during passage planningEach leg of the passage plan has a security risk assessment with high-risk areas, reporting points and the measures to be taken.Rotational 17.2.1Vessel hardeningHardening follows the VHP before high-risk areas, with recorded checklists, physical barriers, a ready citadel and crew who know their roles.Rotational 27.2.2Controlling access to the vesselCheck ID and purpose, log and badge every visitor, brief them on safety, and step up searches and controls with the security level.Rotational 17.3.1Ship security reporting and communicationsSSAS is a covert alert ashore, tested with prior notice; know your regional reporting centre and the CSO's 24-hour number.Rotational 27.4.1Ship Security Officer (SSO)SSO holds a VI/5 certificate, knows the SSP and contacts, keeps last-ten-port-call and drill records; crew know the alarm response.Rotational 27.5.1Cyber security risk managementKeep an IT/OT register, approve and log external access, scan all USB media, train the crew, know critical system back-ups.Rotational 18. Cargo and ballast systems 91 questions
8.1.1Inert gas system usage on oil tankersTanks always inert: IG supplied at 5% O2 or less, tank O2 at 8% or less, positive pressure maintained; stop discharge if IG fails.Core8.1.2Crude Oil Washing operations (COW)Plan COW per the approved manual, confirm tank O2 at 8% or less with IG running, watch pressure and leaks, record in Oil Record Book.Rotational 18.1.3Cargo tank isolation from venting systemIsolation only with authority, locked, recorded, and each isolated tank still protected by its own P/V valve.Rotational 28.1.4Oil cargo tank cleaning proceduresWritten tank cleaning plan approved by the Master, atmosphere controlled and monitored throughout, slops and washings correctly recorded.Rotational 28.2.1Chemical tanker inert gas system usageUse the IBC Code and Certificate of Fitness to decide inerting/padding, verify O2 and pressure, record it, and stop discharge if IG fails.Core8.2.2Carriage of inhibited chemical cargoesNo inhibitor certificate, no loading; check inhibitor lifetime against the voyage, monitor temperature, respect oxygen and heat limits.Core8.2.3Procedures and Arrangements ManualEvery cargo checked against the Certificate of Fitness, IBC Code and latest MEPC.2 circular; P&A Manual stripping and prewash rules applied.Rotational 18.2.4Chemical tank cleaning proceduresPlan from SDS and P&A Manual, brief the whole team, monitor flammable and toxic vapour, record washings correctly.Rotational 28.2.5Chemical cargo compatibility chartsCheck every cargo pair on the compatibility chart, segregate tanks, lines and vents, and document the check in the approved stowage plan.Rotational 28.2.6Escape sets required by IBC CodeEscape set for every person on board, with eye and breathing protection suitable for all certified cargoes, checked and in date.Rotational 28.2.7Safety equipment required by the IBC CodeIBC safety sets complete and ready: SCBAs charged and tested, showers and eyewash working, antidotes and resuscitator available.Rotational 28.2.8Protective equipment required by the IBC CodeSelect PPE from the SDS and resistance charts, inspect before use, don in the right order, store outside the accommodation.Rotational 28.3.1Inert gas generatorStart, vent until O2 is 5% or less, then supply; test alarms and trips per PMS; stop discharge and isolate if the generator fails.Core8.3.2Nitrogen generator inert gas systemNitrogen purity verified before use; ventilate the room; remember nitrogen leaks suffocate and the exhaust is oxygen-enriched.Core8.3.3Flue gas inert gas systemKnow the path uptake to deck main, test alarms before each use, deliver only at 5% O2 or less, stop discharge if IG fails.Core8.3.4Cargo tank high level and overfill alarmsAlarms tested before loading, set points known and recorded, never isolated without Master's authority and alternative monitoring.Core8.3.5Gauging and sampling static accumulator cargo in non-inerted tanksNon-inert tank with static accumulator: no conductive equipment during loading and for 30 minutes after, unless via sounding pipe; always bonded.Core8.3.6Loading static accumulator cargo into non-inerted tanksStart slowly at about 1 m/s at the inlet until covered, avoid splash and water, then wait 30 minutes before gauging.Core8.3.7IGS oxygen analyserCalibrate zero and span before each use, verify with a portable meter, log it; if the analyser fails, IG quality is unknown so stop supply.Rotational 18.3.8Oil and Chemical Tanker ESD and/or cargo pump emergency stop controlsKnow where every pump emergency stop is, what trips the pumps automatically, test them per procedure, inform CCR and terminal after use.Rotational 18.3.9Pressure testing and inspection of cargo, inert gas and vapour pipelinesCargo, vapour and IG lines tested at the company interval and pressure, inspected visually, and every test and repair recorded.Rotational 18.3.10Vapour collection systemVapour manifold identified, alarms tested, pressure limits agreed with the terminal, loading rate managed to keep tank pressure in range.Rotational 18.3.11Oil and chemical tank cleaning in non-inert tanksState the method (undefined or too lean), follow its restrictions, bond all machines and hoses, monitor gas and stop if limits are exceeded.Rotational 18.3.12Portable ullage/temperature/interface (UTI) measurement and sampling equipmentCertified, calibrated UTI; pre-use checks done; bond first, then connect to the vapour lock; disconnect in reverse.Rotational 18.3.13Secondary venting systemsKnow the primary and secondary venting means, their settings in correct order, and set the line-up for each operation under control.Rotational 18.3.14Cargo tank venting systemsLift-check P/V valves before every operation, keep screens and drains clear, overhaul per PMS and record set pressures.Rotational 18.3.15Deepwell pump cofferdam purgingPurge cofferdams at set intervals with the right medium and pressure, record leakage per pump, wear proper PPE, report rising leakage.Rotational 28.3.16Inert gas system non-return devicesDeck seal and non-return valve stop gas backflow; check water level and alarm, inspect and overhaul per PMS.Rotational 28.3.17Manifold reducers and spool piecesMarked, tested steel reducers; correct gaskets; every bolt fitted and tight; supported properly; records available.Rotational 28.3.18Inert gas system pressure/vacuum-breaking (P/V) device(s)P/V breaker is the back-up for P/V valves; keep the liquid level and antifreeze correct and record checks.Rotational 28.3.19Indicators and alarms for the inert gas systemKnow every IGS alarm and set point, test and calibrate them per PMS, and switch to backup monitoring and restrict operations if one fails.Rotational 28.3.20Connections and interconnections to/with the inert gas system pipingKnow the emergency IG connections for double hulls and forepeak, the external supply point, and keep IG/cargo line interconnections positively isolated.Rotational 28.3.21Cargo heating systemPlan heating within cargo, coating and adjacent-cargo limits, test coils before loading, monitor and record temperatures.Rotational 28.3.22Cargo doping and additivesDope only with written instructions and company approval, never blend at sea, follow SDS precautions and record the quantities.Rotational 28.3.23Cargo tank temperature monitoring systemsDemonstrate the system, compare fixed sensors with a calibrated portable UTI, record the results and report faulty sensors.Rotational 28.3.24Cargo manifold arrangementsProper gaskets and full bolting, gauges fitted, drip trays clean, manifold watched continuously; stop at once if leaking.Rotational 28.3.25Receiving nitrogen from shoreAgree nitrogen pressure and rate with the terminal, watch tank pressures, keep people away from vents.Rotational 28.4.1Carriage of inhibited cargoesInhibitor certificate on board, lifetime covers voyage, keep oxygen very low, monitor for polymerisation.Rotational 28.4.2Cargo samplingClosed sampling in pressure-rated containers with face shield and cold gloves, after a briefing on the cargo hazards.Rotational 28.4.3Segregating incompatible cargoes and refrigerantsCheck cargo-to-cargo and cargo-to-refrigerant compatibility, segregate lines and plant, and document it in the plan.Rotational 28.4.4Carriage of propylene oxide (PO) and/or ethylene oxide (EO)Clean tanks, acceptable previous cargo, keep nitrogen pad and O2 low, dedicated hoses, monitor temperature.Rotational 28.4.5Escape sets as required by the IGC CodeOne self-contained escape set per person, eye and breathing protection, in date and charged.Rotational 28.4.6Cargo tank insulationInspect insulation at every hold entry and at dry-dock, watch for cold spots and moisture, report and record defects.Rotational 28.4.7Vent outlet protection screens or flame screensCorrect screen type for the cargo, intact and clear, inspected per PMS with spares on board.Rotational 28.5.1Custody transfer measurement system (CTMS)CTMS calibrated and certified, gauges compared before every transfer, discrepancies reported and recorded.Rotational 28.5.2Gas Combustion Unit (GCU)GCU controls tank pressure by burning excess boil-off; test trips, know manual mode and alternatives, vent only as last resort.Rotational 28.5.3LNG gas fuel supply systemGas detectors calibrated, duct ventilation working, master gas valve tested, fuel lines purged with nitrogen before maintenance.Rotational 28.5.4Cold spots and cofferdam temperature monitoring and heating equipmentMonitor hull temperatures, keep cofferdam heating and standby running, report any cold spot to company and class at once.Rotational 28.6.1Cargo tank overfill alarmsIndependent alarms tested before loading, set to filling limits, overrides only with Master's permission and logged.Core8.6.2Cargo transfer Emergency Shut Down (ESD)ESD closes valves and stops pumps; valves close within 30 seconds; test with shore before transfer; inhibit only on Master's written authority.Core8.6.3Cargo tank relief valvesChange relief settings only with approval, reset alarms to match, log it, test per PMS, keep enough relief capacity if one valve is out.Rotational 18.6.4Cargo System Operation ManualShip-specific Cargo System Operation Manual kept in the CCR; know its contents and use it for every operation.Rotational 18.6.5Maintaining the atmosphere in the interbarrier spaces and/or hold spacesKeep the required inert or dry atmosphere, monitor gas, pressure and dew point, record trends and investigate any rise.Rotational 18.6.6Cargo system alarm managementKnow cargo alarm set points, investigate every alarm, inhibit only with Master's authority and log it.Rotational 18.6.7Inert gas systemDeliver IG or nitrogen only within O2 and dew point limits, test alarms, ventilate the plant room, respect asphyxiation risk.Rotational 28.6.8Gas vessel cargo manifoldsWatch for frost and gas, monitor strainer differential, purge with nitrogen before disconnecting, protect the hull from cold spills.Rotational 28.6.9Manifold reducers, spool pieces and other portable pipeworkLow-temperature-rated, marked and tested pieces, fitted with the right gaskets and every bolt.Rotational 28.6.10Emergency discharge operationsKnow the emergency discharge methods on board, keep the emergency pump gear ready, follow the manual's pressure limits.Rotational 28.6.11Cargo and vapour pipeline insulation and expansion arrangementsInspect pipe insulation and expansion supports regularly, look for ice and seized supports, report and repair defects.Rotational 28.6.12IGC safety, rescue and recovery equipmentIGC safety sets complete, SCBAs charged and tested, stretcher and oxygen resuscitator ready, drills held.Rotational 28.6.13Protective equipment required by the IGC CodeChoose PPE from the SDS, inspect it, don the full set correctly, store it outside the accommodation.Rotational 28.6.14Reliquefaction plantKnow the plant, test trips and alarms, purge non-condensables to the vent mast, maintain per PMS.Rotational 28.6.15Cargo heaters, vaporisers and condensersEstablish heating medium flow before cargo, monitor outlet temperatures, watch for tube leaks, maintain per PMS.Rotational 28.6.16Filling Limits (FL) and Loading Limits (LL)Loading limit is derived from the filling limit and density ratio at reference temperature; use the approved tables in every plan.Rotational 28.6.17Vent mast fire suppression systemKnow where and how to release the vent mast suppression, when to use it, and keep bottles checked and serviced.Rotational 28.6.18Water or liquid cargo leakage into a hold or insulation spaceTest level alarms, sound and monitor gas and dew point, remove water quickly, find the source and report.Rotational 28.6.19Submerged motor electric cargo pumpsMegger before use, cool pump and confirm level before starting, test trips, respect the start limit, stop and investigate on low level.Rotational 28.6.20Liquid line, hold, insulation and inter-barrier space relief valvesKnow every line, hold and insulation space relief valve and its setting, test per PMS, never leave liquid trapped between closed valves.Rotational 28.6.21Inerting, gas freeing and gassing up operationsDry and inert to the set limits before gassing up, cool down at the manual's rate, never load below the certified minimum temperature.Rotational 28.7.1BLS Emergency Shut Down (ESD) systemsKnow ESD levels and what each does, test them before each offshore loading, maintain per PMS.Core8.7.2Checks when approaching an offshore terminalComplete the arrival and DP checklists, test BLS, ESD and telemetry, confirm weather is within limits before approach.Rotational 18.7.3Control and monitoring of the Bow Loading System (BLS)Green line means all loading conditions safe; know its inputs and stop loading if it is lost.Rotational 18.7.4Bow Loading System (BLS) operation, inspection, testing and maintenanceTest BLS alarms and indicators before each loading, maintain coupler and hydraulics per PMS, keep the area clean and leak-free.Rotational 18.7.5Deluge system in the bow loading system (BLS) areaKnow what the BLS deluge covers and how to activate it, flow-test it per PMS and keep nozzles clear.Rotational 28.7.6Fixed foam fire extinguishing system in the bow loading system (BLS) areaKnow the BLS foam system coverage and start-up, test the foam concentrate, maintain it per PMS.Rotational 28.7.7DP Equipment condition and maintenanceAll DP equipment in the PMS and maintained, defects assessed against capability, trials current.Rotational 28.7.8DP FMEALatest FMEA on board including modifications; know worst-case failure, thruster fail-safe modes and closed bus risks.Rotational 28.7.9Gas and fire detection systems in the bow loading system (BLS) areaKnow BLS gas and fire detector locations and alarm actions, calibrate and test them per PMS, stop loading on alarm.Rotational 28.8.1Cargo hold hatch coversInspect seals and cleats, test tightness, keep tank pressure within the range for effective hatch sealing.Core8.8.2Changing between wet and dry cargoesUse ship-specific checklists, gas-free and certify before dry cargo, isolate lines, record each stage.Rotational 28.99.1Cargo and ballast transfer planning and executionWritten plan with stability and stress at each stage, agreed with terminal, signed by all officers, followed and re-approved on changes.Core8.99.2Ship/Shore Safety Checklist (SSSCL)Complete the relevant SSSCL parts honestly, keep agreements, do and sign the repeat checks at the agreed interval.Core8.99.3Cargo operations team compositionFollow company supervision levels, Chief Officer present at critical stages, rest hours kept, SIMOPS assessed and approved.Rotational 18.99.4Cargo and ballast valve testingTest valves before operations, compare remote and local indication, know how to operate valves with the hand pump.Rotational 18.99.5Fixed cargo tank level gauging systemCompare fixed gauges with portable UTI regularly, know alarm settings, report defects and use extra manual gauging until fixed.Rotational 18.99.6Stability and loading instrument(s)Test the loading instrument with approved test conditions at the set interval, record it, and know how to check damage stability.Rotational 28.99.7Loading limitationsKnow the ship's restrictions, build them into every plan, and check stability at each intermediate stage, not just the end.Rotational 28.99.8Cargo Transfer hosesRight hose for the cargo and pressure, inspected before use, tested and recorded, stored supported and capped, retired on criteria.Rotational 28.99.9Cargo and ballast system controls, indicators, mimics and displaysCompare remote indicators with local readings regularly, calibrate per PMS, keep mimic and pipeline diagrams current and legible.Rotational 28.99.10Cargo system bonding arrangementsInspect bonding straps, test resistance at the set interval, replace damaged straps and refit after any pipe work.Rotational 28.99.11Independent verification of cargo piping systems line upIndependent second-person check of every valve, drain, sample point and blank against the plan before starting and after each change.Rotational 29. Mooring and anchoring 14 questions
9.1.1Testing and correct operation of the mooring winch brakesBrakes are tested yearly, after maintenance and after slippage, set to 60% of SDMBL, applied correctly, and lines are reeled in the correct direction.Core9.1.2Was the vessel satisfactorily mooredCheck the terminal plan against the MSMP before berthing, moor to an agreed configuration, no mixed lines per direction, tend evenly.Rotational 19.1.3Line Management Plan (LMP) implementationThe LMP tracks every line, tail and shackle by location and certificate, with recorded inspections, rotation and retirement criteria.Rotational 19.1.4Mooring lines, tails and mooring shacklesEvery line, tail, shackle and spare is certified, matched to the SDMBL as MEG4 requires, and in good condition.Rotational 29.2.1Emergency towing procedure and equipmentKnow the ship-specific Emergency Towing Booklet; the forward and aft gear is maintained and ready to deploy without main power; drills are recorded.Rotational 29.3.1Anchoring operationsPlan within the windlass limits, walk back in deep water, keep the brake tested and adjusted, keep a proper anchor watch, and record it all.Rotational 19.4.1Mooring team supervision and compositionEach mooring and anchoring station has the required officer and team as the procedure sets, with manning, briefings and rest hours recorded.Rotational 29.4.2Dangers of working with and around mooring linesToolbox talk before every mooring; treat the whole deck as snap-back danger; never step over tensioned lines; declutch drums, pins fitted.Rotational 29.5.1STS operations checklistsUse and sign the industry STS guide checklists at each stage, record the whole operation, notify the coastal state, and keep the records three years.Core9.5.2STS Joint Plan of Operation (JPO)Have an accurate, operation-specific JPO on board, brief everyone on it, and stop the operation when its limits are exceeded.Rotational 19.5.3STS Operations PlanThe ship-specific STS Operations Plan is kept on the bridge and in the CCR, and all crew know its content and their own role.Rotational 29.6.1Vapour hose securing arrangement for buoy mooringsVapour manifold clearly identified, with saddle, strong points and a crane able to hold the buoy vapour hose off the flange.Rotational 19.6.2SPM mooring arrangementsKnow the SPM hook-up sequence and your role, keep clear of rope and chain, and ensure the HVPQ matches the fitted stoppers.Rotational 29.7.1Shuttle tanker bow mooring systemKeep the chafe chain locked in the stopper, know the manual brake release and line cutter, and test the bow system before every offshore call.Rotational 210. Machinery spaces 32 questions
10.1.1Chief Engineer's standing and daily ordersSigned, ship-specific Standing Orders plus daily orders; every engineer has signed and can quote when to call the Chief Engineer.Rotational 110.1.2Testing main propulsion, steering gear, thrusters & power generation plantWe test steering, main engine, thrusters and generators before departure and arrival using checklists; entries in both logs match and I can steer locally.Rotational 110.1.3Periodic rounds of machinery space for non-UMS vesselsRounds are made every watch per the SMS; we check temperatures, pressures, leaks, bilges and fire risks, log readings and report anything abnormal.Rotational 110.1.4Periodic machinery space rounds during both manned and unmanned (UMS) periodsBefore UMS we complete the checklist, select the duty engineer and inform the bridge; alarms during UMS are attended, logged and explained.Rotational 210.1.5Local control of propulsion machineryI can switch to engine-side control, start, reverse and change speed following the emergency telegraph; local control is tested and recorded in the PMS.Rotational 210.2.1Emergency generatorStarts automatically on blackout and connects in 45 s; I can start it manually by both means; weekly and on-load tests are recorded.Core10.2.2Battery emergency source of powerBatteries are checked and logged per the PMS, kept charged and clean, and tested in blackout simulations to prove they carry emergency loads.Core10.2.3Exhaust gas cleaning system (EGCS)We run and calibrate the scrubber per its approved manuals; if it fails we switch to compliant fuel, record it and notify the authorities.Rotational 110.2.4seawater pipelinesSeawater lines are inspected under the PMS; any defect is reported and repaired properly, and we keep no unreported temporary repairs.Rotational 210.2.5Bilge monitoring devicesI test the bilge alarms in my area by physically operating the float, confirm the alarm at bridge/ECR/CCR and record it in the PMS.Rotational 210.2.6Emergency compressed air machinery starting systemThe emergency compressor and receiver are tested under the PMS; I can charge the receiver and start a generator from dead ship.Rotational 210.3.1Switchboard deck insulationApproved insulating mats cover the deck front and rear of every switchboard; they are kept clean, undamaged and checked during inspections.Rotational 210.3.2Electrical distribution system switchboard earth monitoringOur insulation monitors are set per maker for each voltage; earth faults are logged, traced by isolating circuits and cleared promptly.Rotational 210.3.3Entry into the machinery space during UMSInform the bridge, switch on the dead man alarm and reset it within the interval; inform the bridge again when leaving. It is tested regularly.Rotational 210.3.4Engineers' alarmActivated from the ECR to summon all engineers urgently; tested regularly so it is heard in every cabin, and each test is recorded.Rotational 210.3.5Machinery alarmAlarms go to the ECR, bridge and duty engineer, escalating if not acknowledged; we test them under the PMS and control every inhibited alarm.Rotational 210.3.6Watertight doorsWatertight doors are kept closed at sea, tested and inspected regularly, and I can operate them remotely and locally, including with the hand pump.Rotational 210.3.7Gas welding and cutting equipmentArrestors fitted and hoses checked; spare oxygen and acetylene stored apart, secured, on deck or in a ventilated store outside ER and accommodation.Rotational 210.3.8Electric welding equipmentDry PPE, insulated holder, return clamp close to the job, hot work permit and fire watch; precautions are posted at the welding machine.Rotational 210.4.1Planned maintenance system (PMS)Every job, part used and running hour goes into the PMS; overdue or deferred jobs need office approval; critical spares stay above minimum.Rotational 110.4.2Lube oil and hydraulic oil analysis programOil samples are taken on schedule from all main systems; every report is reviewed, trended and abnormal results are acted on and recorded.Rotational 210.5.1Conventional bunkering operationsEvery bunkering has a signed plan and checklist; I know my duty, the tank limits and how to stop the transfer on any leak.Rotational 110.5.2Bunker fuel oil sampling and analysisSamples are drip-taken at our manifold throughout delivery, sealed and logged; MARPOL sample kept 12 months and analysis results acted on before use.Rotational 210.5.3Fuel change over proceduresWe calculate start time so the system is flushed before the ECA; date, time, position and tank volumes are logged per MARPOL Annex VI.Rotational 210.6.1LNG fuel tank water-spray systemThe water spray cools and protects the LNG fuel tank; I can start the pumps, set and drain the valves; tests are recorded.Rotational 210.6.2LNG gas fuel bunkering ESD systemPress the ESD for any leak, fire, gas alarm or unsafe situation; it is tested with the supplier before every bunkering and closing times recorded.Rotational 110.6.3LNG (or other low-flashpoint fuel) bunkering proceduresSigned plan and checklist every time; ESD tested, connection purged and leak tested, tank pressure monitored, safety zone enforced.Rotational 110.6.4LNG fuel bunkering control station and manifoldThe LNG bunker station has working drip trays, water curtain, gas detection, ESD and fire-fighting equipment, all tested before bunkering and recorded.Rotational 210.7.1Remote controls for fuel and lube oil system valvesThe pump stops and QCV controls are outside the engine room; they cut fuel and lube oil in a fire, are labelled and tested regularly.Rotational 110.7.2Fire prevention in machinery spaces - hot surfaces and oil sprayHot surfaces are insulated, HP fuel pipes are jacketed with leak alarms, flanges have spray protection, and leaks are fixed and cleaned immediately.Rotational 110.7.3Main engine crank case monitoringOMD tested with the maker's kit and logged; on alarm: slow down, inform bridge, stop safely, keep clear until the crankcase cools.Rotational 210.7.4Hydraulic power packs fire protection measuresOur hydraulic power packs are shielded, covered by detection and fire protection, checked for leaks every round and their alarms are tested.Rotational 211. General appearance and condition (photographs) 54 questions
11.1.1Bow area from dead aheadThe bow looks as in the photo: markings legible, anchors secured, coating maintained and any damage reported.Core11.1.2Hull forward end starboard sideThe starboard forward hull matches the photo: markings clear, coating maintained, any damage reported and assessed.Core11.1.3Hull forward end port sideThe port forward hull matches the photo: markings clear, coating maintained, any damage reported and assessed.Core11.1.4Hull aft end starboard sideThe starboard aft hull matches the photo: markings clear, coating maintained, any damage reported and assessed.Core11.1.5Hull aft end port sideThe port aft hull matches the photo: markings clear, coating maintained, any damage reported and assessed.Core11.1.6Transom from right asternThe transom matches the photo: name legible, coating maintained, fittings and lights intact, any damage reported.Core11.1.7Forecastle port side looking towards fairleadsThe port forecastle matches the photo: fairleads and rollers free and smooth, bitts sound, deck coated and tidy.Core11.1.8Forecastle starboard side looking towards fairleadsThe starboard forecastle matches the photo: fairleads and rollers free and smooth, bitts sound, deck coated and tidy.Core11.1.9Port or starboard windlassThe windlass matches the photo: no leaks, brake and linings in good order, stopper secured and maintenance recorded.Core11.1.10Forward main deck showing condition of deck (and external framing)The forward main deck matches the photo: coating maintained, framing sound, walkways and fittings in good order.Core11.1.11Forward main deck showing condition of PiperackThe forward pipe rack matches the photo: pipes and supports coated and sound, no temporary repairs, lines tested and recorded.Core11.1.12One mooring winch including the brake setting arrangementThe winch matches the photo: brake linings and setting marks in good order, brake tested on schedule, no leaks.Core11.1.13One hose crane with an overall viewThe hose crane matches the photo: structure sound, SWL marked, certificates valid and no hydraulic leaks.Core11.1.14One hose crane hoisting winch, stowed wire and limit switchesThe hoist wire is greased and undamaged, spooled correctly, with a certificate; limit switches are tested and work.Core11.1.15Starboard manifold looking from aft to forwardThe starboard manifold matches the photo: blanks fully bolted, drip tray clean, gauges calibrated and coating maintained.Core11.1.16Starboard manifold looking forward to aftThe starboard manifold matches the photo: blanks fully bolted, drip tray clean, gauges calibrated and coating maintained.Core11.1.17Aft main deck showing condition of deck (and external framing)The aft main deck matches the photo: coating maintained, framing sound, walkways and fittings in good order.Core11.1.18Aft main deck showing condition of PiperackThe aft pipe rack matches the photo: pipes and supports coated and sound, no temporary repairs, lines tested and recorded.Core11.1.19Poop deck looking from midships to starboard including fairleadsThe poop deck matches the photo: fairleads and rollers free, deck coated, mooring area tidy and equipment maintained.Core11.1.20Aft emergency towing equipment storage arrangementThe aft emergency towing gear is stowed and protected as in the photo, inspected regularly and backed by the ship's towing procedure.Core11.1.21Aft emergency towing equipment deployment systemThe aft towing gear deploys as described in the ship's procedure; route clear, release free and drills recorded.Core11.1.22Lifeboat and davitThe lifeboat and davit match the photo: condition sound, falls in date, release gear serviced and drills recorded.Core11.1.23The emergency generator or accumulator batteriesThe emergency generator/battery room matches the photo: clean, ventilated, ready to run and tested on schedule.Core11.1.24Engine room general view showing top of main engineThe engine room top matches the photo: clean, no leaks, hot surfaces insulated and no loose items.Core11.1.25One generator engineThe generator matches the photo: clean, leak-free, insulated, gauges working and maintenance current.Core11.1.26The oil filtering equipmentThe separator and 15 ppm meter match the photo, with no bypass possible; calibration, alarm test and ORB entries are in order.Core11.1.27The incineratorThe incinerator matches the photo: clean, safe, instructions posted and use correctly recorded in the record books.Core11.1.28One boiler from the frontThe boiler front matches the photo: clean, no leaks, gauge glasses clear and safety devices tested and recorded.Core11.1.29One boiler from the top showing control equipmentThe boiler top matches the photo: controls and safety valves in good order, no leaks and tests recorded.Core11.1.30Purifier room general viewThe purifier room matches the photo: clean, leak-free, fire protection working and door closing properly.Core11.1.31Main engine side showing local control stationThe main engine local control station matches the photo: working indicators and telegraph, instructions posted and tests recorded.Core11.1.32Steering gear room general view showing accessThe steering gear room matches the photo: clean, access clear, instructions posted and emergency steering drills recorded.Core11.1.33Main steering gearThe steering gear matches the photo: no leaks, oil levels correct, greased, and tested before every departure.Core11.1.40IG system pressure/vacuum-breaking (P/V) deviceThe P/V breaker matches the photo: correct liquid level, clean outlet and inspected regularly as part of the IG system.Core11.1.41IG system first non-return device (deck seal or double block and bleed arrangement)The deck water seal (or DBB valves) matches the photo: level and alarms working, no corrosion, inspected regularly.Core11.1.42One main cargo pump and, if in pump room, including bilgesThe cargo pump matches the photo: no leaks, temperature sensors working and pump room bilges clean and dry.Core11.1.50A cargo tank liquid dome including load and discharge valveThe liquid dome matches the photo: valves and insulation in good order, ESD tested and no leaks or corrosion.Core11.1.51Electric motors for deepwell pumpsThe deepwell pump motors match the photo: sound casings, sealed glands, greased bearings and insulation tests recorded.Core11.1.52Compressor / motor roomThe compressor and motor rooms match the photo: clean, seals and air locks working, gas detection and ventilation tested.Core11.1.60A cargo tank liquid dome including load and discharge valveThe liquid dome matches the photo: valves and insulation in good order, ESD tested and no leaks or corrosion.Core11.1.61Electric motors for deepwell pumpsThe deepwell pump motors match the photo: sound casings, sealed glands, greased bearings and insulation tests recorded.Core11.1.62Compressor room internal viewThe compressor room matches the photo: clean, no leaks, ventilation and gas detection working and tested.Core11.1.70A cargo tank liquid dome including load and discharge valveThe liquid dome matches the photo: valves and insulation in good order, ESD tested and no leaks or corrosion.Core11.1.71A cargo tank vapour dome including cargo system relief valvesThe vapour dome matches the photo: relief valves in date and set correctly, insulation intact, no corrosion.Core11.1.72Compressor house internal viewThe compressor house matches the photo: clean, no leaks, ventilation and gas detection working and tested.Core11.1.80A cargo tank liquid dome including load and discharge valveThe liquid dome matches the photo: valves and insulation in good order, ESD tested and no leaks or corrosion.Core11.1.81General view of one moss sphereThe Moss sphere cover matches the photo: coating maintained, seals intact and inspections recorded.Core11.1.82Compressor house internal viewThe compressor house matches the photo: clean, no leaks, ventilation and gas detection working and tested.Core11.1.90Bow mooring arrangement from forward looking aft showing chain stopperThe bow chain stopper matches the photo: locking mechanism working, no leaks and tests recorded.Core11.1.91Bow mooring arrangement from aft looking forward showing winchThe bow loading winch matches the photo: brake tested, no leaks and messenger lines in good condition.Core11.1.92General view of hose connection areaThe hose connection area matches the photo: clean, drip tray drained, gas detection and fire-fighting ready.Core11.1.93Hose coupling arrangementThe hose coupler matches the photo: seals and jaws in good condition, emergency release tested before every loading.Core11.1.94General view forward bow thruster roomThe bow thruster room matches the photo: clean, dry bilges, no leaks and alarms tested.Core11.1.95Forward bow thruster room showing one azimuth thrusterThe azimuth thruster matches the photo: no leaks, oil levels correct and tested before DP or bow loading operations.Core12. Ice operations 6 questions
12.1.1Polar Code trainingMaster and Chief Officer hold advanced polar training and watch officers basic training, matched to the ice conditions in the voyage plan.Rotational 212.2.1Life-saving and fire-fighting systems and equipment in sub-zero temperaturesDrain deck fire and foam lines, keep lifeboat engines heated and batteries charged, protect hoses and extinguishers, and de-ice LSA regularly.Rotational 212.3.1Engine room machinery and systems in sub-zero temperaturesRecirculate warm water to sea chests, keep fuel above its pour point, heat emergency machinery spaces and manage ventilation.Rotational 112.4.1Cargo and ballast systems in sub-zero temperaturesKeep ballast, vents, P/V valves and deck seal ice-free, drain deck lines and water spray, and record the cold-weather checks.Rotational 212.5.1Deck machinery and mooring equipment in sub-zero temperaturesHeat the hydraulics, run the winches regularly, keep brakes and drums free of ice, and protect mooring lines.Rotational 212.6.1Navigating in areas affected by icePlan with current ice information, stay within the ice class and POLARIS limits, reduce speed, double the lookout, and follow icebreaker instructions.Rotational 1An independent guide written by seafarers for seafarers. It is not affiliated with or endorsed by OCIMF and does not reproduce the SIRE 2.0 Question Library: questions are put in our own words. The official library and guidance are published by OCIMF (ocimf.org). Always follow your company's SMS.