8.7.2 Checks when approaching an offshore terminal
Rotational 1OilAsked to: Master, Chief Officer, 2nd / 3rd OfficerWhere: Bow Loading Area, Bridge, Cargo Control Room, Engine Control RoomOnly if it applies to the ship
Do the Master and officers know the company procedures and arrival checklists for the checks and actions needed when approaching an offshore terminal before DP and/or bow loading, and were they followed?
In one lineComplete the arrival and DP checklists, test BLS, ESD and telemetry, confirm weather is within limits before approach.
How to answer
- Explain the checklist used and when it is started.
- Describe the DP checks: power configuration, thrusters, references, sensors and DP trials.
- Explain the BLS checks: coupler, hose handling, ESD and telemetry tests.
- Explain weather limits and the decision to proceed.
- Show the completed checklists.
What the inspector looks for
- Company and field-specific arrival checklists completed and signed
- DP system checks, trials and capability for the expected weather
- Communication tests with the terminal
- BLS, ESD, telemetry and green line checks
- Weather limits and operating criteria
Have ready to show
- Arrival checklists
- DP checklists and trial records
- Terminal operating manual
- ESD and telemetry test records
- Weather forecast and limits
Avoid
- Checklist not completed
- DP trials not done
- Weather limits ignored
← 8.7.1 BLS Emergency Shut Down (ESD) systems8.7.3 Control and monitoring of the Bow Loading System (BLS) →