8.7.3 Control and monitoring of the Bow Loading System (BLS)

Rotational 1OilAsked to: Master, Chief Officer, 2nd / 3rd OfficerWhere: Bow Loading Area, Bridge, Cargo Control RoomOnly if it applies to the ship

Do the Master and officers know the equipment used to control and monitor the bow loading system, and is it working and regularly inspected, tested and maintained?

In one lineGreen line means all loading conditions safe; know its inputs and stop loading if it is lost.

How to answer

  • Explain the telemetry and green line and what conditions must be satisfied.
  • List the input sensors to the green line.
  • Describe actions if the green line is lost: stop loading as per procedure, investigate, communicate with the terminal.
  • Explain key findings of the FMEA for the BLS.
  • Show test and maintenance records.

What the inspector looks for

  • Green line function: telemetry link showing all conditions safe for loading
  • Inputs to the green line (sensors, ESD status, coupler status, positioning)
  • Actions on green line failure
  • Knowledge of the FMEA for the BLS and cargo loading system

Have ready to show

  • BLS control and monitoring manual
  • FMEA report
  • Telemetry test records
  • PMS maintenance records

Avoid

  • Officers unaware of green line inputs
  • No action plan for green line failure
  • FMEA not on board

Practise in the interview trainer All questions