8.1.1 Inert gas system usage on oil tankers Core

Do the Master and officers know the company rules for running the inert gas system on an oil tanker, and is the IGS actually used as ISGOTT recommends, keeping every cargo tank inerted unless a tank has to be made gas-free for someone to enter it?

In one lineTanks always inert: IG supplied at 5% O2 or less, tank O2 at 8% or less, positive pressure maintained; stop discharge if IG fails.

How to answer
  • Explain the limits you work to: IG delivered to tanks at 5% oxygen or less, tank atmosphere kept at 8% or less, and a positive pressure in the tanks at all times.
  • Walk the inspector through starting the IGS for discharge: pre-start checks, analyser calibration, venting to atmosphere until oxygen is in range, then opening the deck main valve and starting cargo pumps.
  • Describe IGS failure during discharge: stop cargo pumps and ballast operations as needed, close the deck isolating valve, prevent air ingress, investigate, and only resume with IG restored or with an approved external IG supply.
  • Explain how you top up at sea when pressure drops and how you record it.
  • State that tanks are only taken out of inert condition for entry, after purging below the hydrocarbon target and then ventilating with fresh air under the company gas-freeing procedure.
Have ready
  • IG pressure and oxygen recorder charts or IAS trend printouts
  • IGS operating log and topping-up records
  • Cargo log and deck log entries for inerting and purging
  • Company SMS procedure for inert gas operations and IGS manufacturer manual
  • Fixed and portable oxygen analyser calibration records
  • Tank atmosphere check records (O2 and hydrocarbon) before and after operations
  • IGS failure contingency instructions posted in the CCR

8.1.2 Crude Oil Washing operations (COW) Rotational 1

Do the Master and officers know the company procedures and the MARPOL requirements for planning, preparing, carrying out and recording crude oil washing, and is the COW equipment in good order and used as the procedures require on every COW operation?

In one linePlan COW per the approved manual, confirm tank O2 at 8% or less with IG running, watch pressure and leaks, record in Oil Record Book.

How to answer
  • Explain how the COW plan is prepared: which tanks are washed for MARPOL ballast requirements and sludge control, sequence, machine programmes and stripping.
  • Walk the inspector through the pre-COW checks: COW line pressure test, oxygen at 8% or less in each tank before washing, IGS operating, communications and terminal agreement.
  • Describe monitoring during washing: COW line pressure, machine rotation indicators, tank oxygen and pressure, leak watch on deck, and stopping if oxygen rises above the limit.
  • Explain that washing medium is crude oil only, never water while the atmosphere is uncertain, and that the slop tank used to supply COW is de-watered first.
  • Show where COW is recorded in the Oil Record Book and the company COW record.
Have ready
  • COW Operations and Equipment Manual (approved by the flag/class)
  • COW plan and pre-COW checklist for the last discharge
  • Oil Record Book Part II
  • COW line pressure test records
  • COW machine maintenance records in the PMS
  • IG oxygen and pressure records during COW
  • Training records of officers in charge of COW

8.1.3 Cargo tank isolation from venting system Rotational 2

Where individual cargo tanks can be separated from the common vent line, do the Master and officers know the company procedure for doing this under SOLAS, and is that procedure followed in practice?

In one lineIsolation only with authority, locked, recorded, and each isolated tank still protected by its own P/V valve.

How to answer
  • Explain the vessel's arrangement: which valves or blanks separate each tank from the common vent/IG main and how they are locked.
  • Describe the approval chain: isolation only with the Chief Officer's or Master's authority, keys kept under control of the responsible officer.
  • Explain that before isolating, you confirm the tank's own P/V valve is in good order and that no cargo or ballast movement will take place in that tank.
  • Show how isolation and reinstatement are logged and communicated at cargo handovers.
  • Explain the danger: an isolated tank with blocked P/V protection can be over- or under-pressurised during temperature changes.
Have ready
  • Company SMS procedure for tank isolation
  • Venting and IG system diagram
  • Lock and key register for isolation valves
  • Cargo log entries showing isolation and restoration
  • P/V valve maintenance and check records

8.1.4 Oil cargo tank cleaning procedures Rotational 2

Do the Master and deck officers know the company procedure for planning and recording cargo tank cleaning after volatile oil cargoes, and was it followed on recent tank cleaning operations?

In one lineWritten tank cleaning plan approved by the Master, atmosphere controlled and monitored throughout, slops and washings correctly recorded.

How to answer
  • Explain how the plan is built: previous cargo, next cargo requirements, inert or non-inert washing, machine programme, wash water temperature and duration.
  • Walk the inspector through the atmosphere control: in inerted tanks oxygen kept at 8% or less with positive pressure; washing stopped if limits are exceeded.
  • Describe the safety measures: bonded portable machines, closed sounding and sampling points, no free-fall of wash water, watch for leaks.
  • Explain slop management: decanting, transfer to slop tank and correct recording in the Oil Record Book.
  • Show the completed checklist and how the Master reviewed and approved the plan.
Have ready
  • Tank cleaning plan and pre-cleaning checklist
  • Tank cleaning risk assessment
  • Atmosphere check records (O2, HC) during and after washing
  • Oil Record Book Part II entries for tank washing and slops
  • Gas-freeing records and entry permits
  • Company SMS tank cleaning procedure and ISGOTT on board

8.2.1 Chemical tanker inert gas system usage Core

On a chemical tanker, do the Master and officers know the company procedures for operating the inert gas system, and has the IGS been used in line with those procedures, industry guidance, SOLAS and the IBC Code?

In one lineUse the IBC Code and Certificate of Fitness to decide inerting/padding, verify O2 and pressure, record it, and stop discharge if IG fails.

How to answer
  • Explain how you check the IBC Code requirements (special requirements, column for environmental control) for each cargo to decide on inerting, padding or drying.
  • Describe the IG source on board, its purity limits, and how you verify oxygen before and during supply.
  • Explain IGS failure actions: stop discharge from tanks needing inert atmosphere, close supply valves, inform terminal, and arrange alternative supply such as shore nitrogen.
  • Explain how padding pressure is maintained and recorded during the voyage.
  • Mention that some inhibitors need dissolved oxygen, so those cargoes are not fully inerted unless the shipper confirms.
Have ready
  • Certificate of Fitness and IBC Code product entries for the cargo on board
  • Company SMS procedure for IGS/nitrogen operations
  • Tank oxygen and pressure records
  • IGS or nitrogen generator log
  • Oxygen analyser calibration records
  • Inhibitor certificate where relevant

8.2.2 Carriage of inhibited chemical cargoes Core

Do the Master and officers know the company procedures for carrying cargoes that must be inhibited, and have these procedures been followed?

In one lineNo inhibitor certificate, no loading; check inhibitor lifetime against the voyage, monitor temperature, respect oxygen and heat limits.

How to answer
  • Explain that you do not load an inhibited cargo without the inhibitor certificate (name and amount of inhibitor, date added, expected lifetime, temperature limits, oxygen needs, and actions if the voyage runs longer).
  • Explain how you check that the inhibitor lifetime exceeds the planned voyage with margin, and who you contact if delays occur.
  • Describe monitoring on passage: cargo temperature, heat sources from adjacent tanks, signs of polymerisation such as rising temperature.
  • Explain whether the inhibitor needs oxygen and how that affects inerting or padding decisions.
  • Describe emergency actions per the company procedure and shipper's instructions if temperature rises.
Have ready
  • Inhibitor certificate (certificate of protection) for each inhibited cargo
  • Cargo SDS
  • Cargo temperature records
  • Stowage plan showing adjacent tank contents and heating
  • Company SMS procedure for inhibited cargoes
  • IBC Code entry for the product

8.2.3 Procedures and Arrangements Manual Rotational 1

Do the Master and officers know what the P&A Manual, the NLS Certificate of Fitness, the IBC Code and the current MEPC.2 circular contain, and can the officers who plan and run cargo operations easily get to this information?

In one lineEvery cargo checked against the Certificate of Fitness, IBC Code and latest MEPC.2 circular; P&A Manual stripping and prewash rules applied.

How to answer
  • Explain what the P&A Manual covers: ship's arrangements for stripping, prewash and discharge requirements by pollution category, and the stripping test residues for each tank.
  • State the stripping residue values for your tanks from the P&A Manual and how they relate to the MARPOL Annex II limits.
  • Explain how you check before accepting a cargo: name on the Certificate of Fitness list, tank types allowed, IBC Code chapter 17 entry, and MEPC.2 circular if the product is newly assessed.
  • Describe how the information is used in the cargo plan (tank selection, prewash, Cargo Record Book entries).
  • Show the location of these documents in the CCR.
Have ready
  • Procedures and Arrangements Manual
  • NLS Certificate of Fitness (with its list of permitted products)
  • IBC Code (current edition with amendments)
  • Latest MEPC.2/Circular
  • Cargo Record Book
  • Cargo stowage plan referencing these documents

8.2.4 Chemical tank cleaning procedures Rotational 2

Do the Master and deck officers know the company procedure for planning and recording tank cleaning after volatile or toxic chemical cargoes, and was it followed, including briefing everyone involved on their duties?

In one linePlan from SDS and P&A Manual, brief the whole team, monitor flammable and toxic vapour, record washings correctly.

How to answer
  • Explain how the plan is made: previous cargo SDS, cleaning guide method, water temperature limits, chemicals used, and the prewash requirement from the P&A Manual.
  • Describe vapour hazards and controls: gas detection for flammable and toxic vapour, keeping vapour away from accommodation intakes, PPE level chosen for the product.
  • Explain your own role in the operation if you are a rating: hose and machine handling, watch at the tank, communication, emergency stop.
  • Explain how washings are handled (to slop tank or shore reception) and recorded in the Cargo Record Book.
  • Show the briefing record signed by the team.
Have ready
  • Tank cleaning plan and checklist
  • Cargo SDS and tank cleaning guide
  • Risk assessment and toolbox talk record
  • Gas detection records (flammable and toxic)
  • Cargo Record Book and prewash certificates/surveyor endorsements
  • P&A Manual

8.2.5 Chemical cargo compatibility charts Rotational 2

Do the Master and deck officers know the company procedure for identifying incompatible chemical cargoes and keeping them apart when planning stowage, and was it followed?

In one lineCheck every cargo pair on the compatibility chart, segregate tanks, lines and vents, and document the check in the approved stowage plan.

How to answer
  • Explain the chart you use (e.g. a cargo compatibility chart based on reactive groups) and walk through reading it for two cargoes on board.
  • Describe what segregation means in practice: no common boundaries where required, separate piping, pumps and venting, and no shared heating systems for incompatible cargoes.
  • Explain how you also check compatibility with tank coating, previous cargo residues and cleaning agents.
  • Show how the final stowage plan is checked by the Chief Officer and approved by the Master.
  • Mention you consult the shipper or company when the chart gives no clear answer.
Have ready
  • Cargo compatibility chart
  • Approved stowage plan
  • Cargo SDS
  • Coating resistance list
  • Certificate of Fitness and P&A Manual
  • Company SMS cargo planning procedure

8.2.6 Escape sets required by IBC Code Rotational 2

Does the chemical tanker carry enough IBC Code emergency escape sets for every person on board, and do these sets give proper protection for breathing and for the eyes?

In one lineEscape set for every person on board, with eye and breathing protection suitable for all certified cargoes, checked and in date.

How to answer
  • Explain how many escape sets are on board and where they are kept, and confirm this covers everyone on board.
  • Describe the type fitted and why it is suitable for your certified cargoes (eye and respiratory protection, minimum 15 minutes of air for self-contained sets).
  • Demonstrate how to don an escape set quickly.
  • Explain the checks you do: cylinder pressure, hood/seal condition, service dates, and drills where they are used.
  • If you are a rating, show the set in your cabin and at your workplace.
Have ready
  • Escape sets (show one in a cabin and at the CCR)
  • Inventory list of escape sets with locations
  • Service and pressure check records
  • Certificate of Fitness (cargo list to justify the set type)
  • Drill records including use of escape sets

8.2.7 Safety equipment required by the IBC Code Rotational 2

Do the Master and officers know the company procedures for the IBC Code safety equipment, such as the SCBA sets and rescue gear, and is this equipment in good condition and ready to use straight away?

In one lineIBC safety sets complete and ready: SCBAs charged and tested, showers and eyewash working, antidotes and resuscitator available.

How to answer
  • Explain where the IBC safety equipment sets are stowed, what each set contains and who checks them.
  • Describe the SCBA checks: cylinder pressure, mask seal, low-pressure warning whistle test, and the service intervals.
  • Show the decontamination shower and eyewash, and explain how they are tested and kept from freezing.
  • Explain where medical first aid guidance and antidotes for the cargo are found (e.g. MFAG and SDS) and the location of the oxygen resuscitator.
  • Describe how the equipment is used in an emergency drill for a cargo exposure casualty.
Have ready
  • Safety equipment lockers and SCBA sets
  • SCBA inspection and service records, air quality test of compressor
  • Decontamination shower and eyewash test records
  • Medical oxygen resuscitator and antidotes list
  • MFAG and cargo SDS
  • Drill records

8.2.8 Protective equipment required by the IBC Code Rotational 2

Do the Master and officers know the company procedures for IBC Code protective equipment, and is the equipment in good condition and right for the chemicals being handled?

In one lineSelect PPE from the SDS and resistance charts, inspect before use, don in the right order, store outside the accommodation.

How to answer
  • Explain how you choose PPE for the cargo: check the SDS and the suit/glove manufacturer's resistance chart for the specific product.
  • Demonstrate donning the full set in the correct order and how the team checks each other before going to the manifold.
  • Explain where the equipment is kept, and that used items are cleaned and stored outside the accommodation.
  • Describe inspecting suits and gloves for damage and replacing them after contamination or expiry.
  • State the PPE level required for typical tasks: connecting hoses, sampling, tank cleaning.
Have ready
  • Protective equipment store/locker
  • Chemical resistance charts for suits and gloves
  • Cargo SDS
  • PPE matrix for cargo tasks in the company SMS
  • PPE inspection and issue records

8.3.1 Inert gas generator Core

Do the Master and officers understand what the inert gas generator is for, how it works and how it is tested, and has it been run and maintained according to the maker's instructions and company procedures?

In one lineStart, vent until O2 is 5% or less, then supply; test alarms and trips per PMS; stop discharge and isolate if the generator fails.

How to answer
  • Walk the inspector through starting the IG generator: fuel and cooling water lined up, purge, ignition, venting to atmosphere until oxygen is 5% or less, then supplying the main.
  • List the alarms and trips and explain how and when they are tested, with records.
  • Explain who operates it (deck/engine roles) and the communication between CCR and engine room.
  • Describe failure actions: stop cargo discharge, close the deck isolating valve, prevent air ingress, inform terminal, and use external supply if approved.
  • Show the maintenance done on the burner, scrubber and blowers per the PMS.
Have ready
  • IG generator manufacturer manual and operating instructions
  • Alarm and trip test records
  • PMS maintenance history for the IG generator
  • Oxygen and pressure recorder charts
  • Analyser calibration records
  • Company SMS IGS procedure

8.3.2 Nitrogen generator inert gas system Core

Can the Master and officers explain what the nitrogen generator does, how to run it and how it is tested, and is there evidence it has been operated and maintained to the maker's manual and company procedures?

In one lineNitrogen purity verified before use; ventilate the room; remember nitrogen leaks suffocate and the exhaust is oxygen-enriched.

How to answer
  • Explain how the generator works: compressed air filtered, separated into nitrogen and oxygen-enriched exhaust, nitrogen purity checked before delivery.
  • Explain the purity limit and how off-spec nitrogen is automatically vented.
  • Describe the hazards: nitrogen leaks create an oxygen-deficient atmosphere; the exhaust is oxygen-enriched and is a fire risk, so it must vent to a safe location.
  • Explain the room precautions: ventilation running, oxygen monitor, warning notices, entry procedure.
  • Show filter and membrane maintenance and analyser calibration records.
Have ready
  • Nitrogen generator manual and operating instructions
  • Nitrogen purity records and analyser calibration
  • PMS records for compressors, filters and membranes
  • Room oxygen depletion monitor and its test record
  • Warning signs at the room entrance

8.3.3 Flue gas inert gas system Core

Can the Master and officers explain what the boiler flue gas IG plant does, how to run it and how it is tested, and has it been operated and maintained as the maker and the company require?

In one lineKnow the path uptake to deck main, test alarms before each use, deliver only at 5% O2 or less, stop discharge if IG fails.

How to answer
  • Walk the inspector through the system from boiler uptake to deck main and explain each component.
  • Explain how you start it: scrubber water on, blowers started, recirculate or vent until oxygen is 5% or less, then deliver to the deck.
  • List the alarms/trips and how they are tested before cargo operations, and show the records.
  • Explain coordination with the engine room to keep boiler combustion steady and oxygen low.
  • Describe what you do if the plant fails: stop cargo pumps, close the deck isolating valve, keep tanks above atmospheric pressure, and arrange alternative IG supply.
Have ready
  • Flue gas IGS manual and system diagram
  • Pre-operation alarm test checklist
  • Oxygen and pressure recorder
  • PMS records for scrubber, blowers and uptake valves
  • Company SMS IGS procedure
  • Analyser calibration log

8.3.4 Cargo tank high level and overfill alarms Core

Do the Master and officers know how the company wants the cargo tank high-level alarms and the separate overfill (high-high) alarms maintained, tested and set, and are these alarms fully working at the correct settings?

In one lineAlarms tested before loading, set points known and recorded, never isolated without Master's authority and alternative monitoring.

How to answer
  • State the set points and show where they are recorded.
  • Explain how alarms are tested: test function or physical float/sensor test per the maker, before loading, with results logged.
  • Explain that isolation is only allowed for defined cases such as testing or a confirmed defective sensor, with Master's authorisation, a defect report and alternative monitoring (e.g. frequent manual ullages).
  • Describe what happens on alarm: stop loading into that tank, check the level, adjust the line-up.
  • Show the defect record and repair plan if any alarm is out of order.
Have ready
  • High-level/overfill alarm test records
  • Alarm set point list
  • PMS maintenance history
  • Override/isolation log with Master's authorisation
  • Maker's manual for the alarm system
  • Pre-loading checklist

8.3.5 Gauging and sampling static accumulator cargo in non-inerted tanks Core

Do the Master, deck officers and ratings know and follow the company rules for gauging (dipping or ullaging) and sampling low-conductivity flammable cargoes that build up static, when the tanks are not inerted?

In one lineNon-inert tank with static accumulator: no conductive equipment during loading and for 30 minutes after, unless via sounding pipe; always bonded.

How to answer
  • Explain what a static accumulator is (low conductivity, such as many clean products) and that charge builds up during loading and takes time to relax.
  • State that conductive dipping, ullaging or sampling equipment is not introduced during loading and for 30 minutes after loading stops, except through a sounding pipe that reaches near the tank bottom.
  • Explain that the equipment is bonded to the ship before it is opened to the tank and stays bonded until removed.
  • Explain the use of natural fibre or approved cords, not synthetic rope, for lowering sample bottles.
  • If you are a rating, show the bonding clip on the UTI tape and how you connect it.
Have ready
  • Company SMS procedure for gauging/sampling static accumulators
  • ISGOTT on board
  • Portable UTI tape with bonding cable
  • Sampling equipment and approved cord
  • Cargo SDS showing conductivity/static accumulator status
  • Toolbox talk record

8.3.6 Loading static accumulator cargo into non-inerted tanks Core

Do the Master and deck officers know and follow the company rules for loading low-conductivity flammable cargoes that build up static charge into tanks without an inert atmosphere?

In one lineStart slowly at about 1 m/s at the inlet until covered, avoid splash and water, then wait 30 minutes before gauging.

How to answer
  • Explain why the initial rate is limited: high velocity and splashing generate static charge in low-conductivity cargo.
  • State the restriction you apply: about 1 m/s at the tank inlet until the inlet is covered (per ISGOTT/company guidance), then the agreed maximum rate.
  • Explain that you avoid introducing air or water into the cargo, and that lines and tanks are drained of water beforehand.
  • Describe the 30-minute relaxation time before introducing conductive gauging/sampling equipment.
  • Show how the reduced rate is written into the loading plan and agreed with the terminal.
Have ready
  • Loading plan with initial and maximum rates
  • Ship/shore safety checklist and agreed rates
  • Cargo SDS (conductivity)
  • Company SMS procedure for static accumulators
  • Cargo log showing rate changes

8.3.7 IGS oxygen analyser Rotational 1

Can the Master and officers explain what the fixed oxygen analyser of the IGS is for, how to use it and how to calibrate it, and has it been used, maintained and calibrated as the maker and the company require?

In one lineCalibrate zero and span before each use, verify with a portable meter, log it; if the analyser fails, IG quality is unknown so stop supply.

How to answer
  • Explain how you calibrate: zero with nitrogen or the specified zero gas, span with fresh air (20.9%) or certified span gas, as the maker specifies, before each operation.
  • Explain the frequency in the company procedure and show the log.
  • Describe checking the analyser against a calibrated portable instrument at the sampling point.
  • Describe failure actions: inform the Master, treat IG quality as unverified, stop supply to tanks until oxygen can be reliably measured, and follow the company contingency (e.g. continuous portable readings if permitted).
  • Show the PMS entries for sample filter and sensor replacement.
Have ready
  • Fixed O2 analyser calibration log
  • Calibration gas cylinders with valid certificates
  • Portable O2 analyser and its calibration record
  • Maker's manual
  • PMS maintenance history
  • Company SMS procedure for analyser failure

8.3.8 Oil and Chemical Tanker ESD and/or cargo pump emergency stop controls Rotational 1

Do the Master, officers and ratings know the cargo emergency shutdown system, where fitted, and the cargo pump emergency stops, and is there evidence these have been tested as the company requires?

In one lineKnow where every pump emergency stop is, what trips the pumps automatically, test them per procedure, inform CCR and terminal after use.

How to answer
  • Point out every emergency stop location and explain which pumps each one stops.
  • List the alarms and conditions that stop cargo pumps automatically on this vessel.
  • Explain how and when the stops are tested (e.g. before cargo operations or per PMS) and show the record.
  • Explain when you would use an emergency stop: leak, fire, overflow, hose failure, terminal request, loss of control.
  • Describe actions after activation: inform CCR and terminal, close manifold valves as needed, investigate before restart with Chief Officer's approval.
Have ready
  • ESD and cargo pump emergency stop test records
  • Pump trip and alarm test records
  • Cargo system diagram with emergency stop locations
  • Pre-arrival/pre-cargo checklist
  • PMS records for pump safety devices

8.3.9 Pressure testing and inspection of cargo, inert gas and vapour pipelines Rotational 1

Do the Master and officers know the company procedures for inspecting and pressure testing cargo, vapour and inert gas lines, and are records of this work available?

In one lineCargo, vapour and IG lines tested at the company interval and pressure, inspected visually, and every test and repair recorded.

How to answer
  • Explain the test interval and test pressure specified in the company procedure and how they relate to the line's maximum working pressure.
  • Walk the inspector through a test: isolate, fill, pressurise, hold, inspect joints and record.
  • Describe routine visual inspections of lines on deck and in the pumproom for corrosion, pinholes, support condition and bonding straps.
  • Explain how defects are reported and repaired and that clamps or temporary repairs are not used without approval.
  • Show the most recent records for cargo, vapour and IG lines.
Have ready
  • Pipeline pressure test records
  • Pipeline inspection checklists
  • PMS entries for pipelines
  • Defect reports and repair records
  • Cargo and IG piping diagrams

8.3.10 Vapour collection system Rotational 1

Do the Master and officers know the company procedures for inspecting, testing and running the vapour collection/return system, and is the equipment in good order?

In one lineVapour manifold identified, alarms tested, pressure limits agreed with the terminal, loading rate managed to keep tank pressure in range.

How to answer
  • Explain how the vapour return is set up: vapour manifold identified and marked, hose connected and bonded, and pressures agreed with the terminal.
  • Explain the high/low pressure alarm set points and how they relate to P/V valve settings.
  • Describe how you monitor tank pressure throughout and adjust the loading rate so vapour flow stays within the system capacity.
  • Explain the tests done before operations: alarm tests, pressure sensor checks, vapour line drain and condition.
  • Describe actions on high pressure: reduce rate or stop loading and inform the terminal.
Have ready
  • Vapour collection system manual and diagram
  • Pressure alarm test records
  • Ship/shore safety checklist entries for vapour return
  • Pipeline pressure test record including vapour line
  • Tank pressure records during loading

8.3.11 Oil and chemical tank cleaning in non-inert tanks Rotational 1

Do the Master, deck officers and ratings know and follow the company procedures for washing tanks that are not inerted after volatile cargoes?

In one lineState the method (undefined or too lean), follow its restrictions, bond all machines and hoses, monitor gas and stop if limits are exceeded.

How to answer
  • Explain which method you used: washing in an undefined atmosphere with the ISGOTT restrictions, or keeping the atmosphere too lean (below the company's % LFL limit) with continuous monitoring.
  • List the restrictions you followed, such as limits on machines per tank, no recirculated or chemical-dosed wash water unless permitted, no free-fall or sounding rods during washing.
  • Explain bonding: hoses and portable machines bonded and continuity checked before the machine enters the tank.
  • Describe gas monitoring and when you stop washing.
  • If you are a rating, describe your duties at the tank and how you communicate with the officer of the watch.
Have ready
  • Tank cleaning plan and non-inert washing checklist
  • Gas readings log during washing
  • Hose continuity test records
  • Risk assessment and toolbox talk
  • Company SMS procedure and ISGOTT

8.3.12 Portable ullage/temperature/interface (UTI) measurement and sampling equipment Rotational 1

Do the Master and officers know the company procedures for using portable ullage, temperature and interface (UTI) gauges and sampling equipment, and is this equipment in good order and used as required?

In one lineCertified, calibrated UTI; pre-use checks done; bond first, then connect to the vapour lock; disconnect in reverse.

How to answer
  • Explain the equipment on board and its intrinsic safety rating, and that only certified equipment is used.
  • Explain the pressure rating of the vapour lock and sampling equipment and that it exceeds the tank operating pressure.
  • Walk through the pre-use checks: tape and probe inspection, battery, function test in air and water, bonding cable intact.
  • Demonstrate connecting the bonding cable first, then attaching to the vapour lock valve, and disconnecting in the reverse order.
  • Explain how the equipment is cleaned after use and stored, and how calibration or comparison checks are recorded.
Have ready
  • Portable UTI tapes and sampling equipment
  • Intrinsic safety certificates
  • Calibration/verification certificates
  • Vapour lock valves and their maintenance record
  • Company SMS procedure for closed gauging

8.3.13 Secondary venting systems Rotational 1

Do the Master and officers know the company procedures for running the main and secondary venting arrangements of the cargo tanks as SOLAS requires, and are these systems set up correctly?

In one lineKnow the primary and secondary venting means, their settings in correct order, and set the line-up for each operation under control.

How to answer
  • Explain the venting arrangement fitted and what serves as the secondary means on this vessel.
  • State the pressure and vacuum settings of the P/V valves, the P/V breaker and the high/low pressure alarms, and show that they are in the right order.
  • Explain how the vent line is set for each operation, including mast riser valve and bypass use with the Chief Officer's approval.
  • Describe what you do if pressure approaches alarm levels: reduce rate, check line-up, open mast riser if appropriate, stop operations.
  • Show the pre-operation checklist confirming the venting line-up.
Have ready
  • Venting system diagram
  • P/V valve and P/V breaker settings list
  • Tank pressure alarm set points and test records
  • Pre-operation checklist
  • Company SMS venting procedure

8.3.14 Cargo tank venting systems Rotational 1

Do the Master and officers know the company procedures for operating, inspecting, testing and maintaining the cargo tank venting system, and is the system in good condition?

In one lineLift-check P/V valves before every operation, keep screens and drains clear, overhaul per PMS and record set pressures.

How to answer
  • Explain the routine checks before each cargo operation: manual lift check of P/V valves, condition of flame screens, drains clear.
  • Explain the overhaul and test interval in the PMS and show the latest records with set pressures.
  • Describe how you deal with sticking valves, cargo residues or polymerising cargoes in vents.
  • Explain precautions in freezing conditions.
  • Show where any defect is reported and how operations are restricted until fixed.
Have ready
  • PMS records for P/V valves and high-velocity vents
  • Test certificates/bench test results with set pressures
  • Pre-operation venting checklist
  • Venting system diagram
  • Defect reports

8.3.15 Deepwell pump cofferdam purging Rotational 2

Do the Master and officers know the company procedures for checking leakage into deepwell pump cofferdams, and have the cofferdams been purged regularly so any excessive leakage is found?

In one linePurge cofferdams at set intervals with the right medium and pressure, record leakage per pump, wear proper PPE, report rising leakage.

How to answer
  • Explain the purging procedure: connect the purging medium at the specified pressure, open the purge exhaust and observe what comes out.
  • State the purging medium used for your recent cargoes and the maximum pressure from the maker's manual.
  • Explain how you record and judge the leakage, and what amount triggers action (per maker guidance).
  • Describe precautions: PPE suitable for the cargo, position yourself upwind, collect leakage in a container, gas detection if toxic.
  • Describe actions on excessive leakage: report to Chief Officer, increase monitoring, plan seal repair, inform the company.
Have ready
  • Cofferdam purging log
  • Pump maker manual purging instructions
  • PMS records for pump seals
  • Cargo SDS and PPE matrix
  • Company SMS procedure

8.3.16 Inert gas system non-return devices Rotational 2

Can the Master and officers explain the job of the IG system's non-return devices (deck seal and non-return valve), how they work, how they are tested and maintained, and are these devices in good condition?

In one lineDeck seal and non-return valve stop gas backflow; check water level and alarm, inspect and overhaul per PMS.

How to answer
  • Explain that the non-return devices stop hydrocarbon gas and cargo from flowing back to the IG plant and machinery spaces.
  • Describe the deck seal type fitted and how water is supplied, how the level is checked and how the low-level alarm is tested.
  • Explain the maintenance: opening up and inspecting the deck seal for corrosion, float and demister condition, and overhaul of the non-return valve per PMS.
  • Describe cold weather measures to prevent freezing.
  • Show the latest inspection records.
Have ready
  • Deck seal and non-return valve PMS records
  • Deck seal level alarm test records
  • IGS diagram
  • Maker's manual
  • Inspection reports with photos if available

8.3.17 Manifold reducers and spool pieces Rotational 2

Do the Master and officers know the company procedures for using, inspecting and testing manifold reducers, spool pieces and other loose pipework, and are these in good order and correctly fitted when used?

In one lineMarked, tested steel reducers; correct gaskets; every bolt fitted and tight; supported properly; records available.

How to answer
  • Explain that reducers and spool pieces are steel, rated for the duty and marked with an identification for the test records.
  • Describe the inspection and test regime (e.g. visual before use, pressure test at the company interval) and show the records.
  • Explain correct fitting: right gasket for the cargo, every bolt hole used, bolts of correct grade and length, tightened evenly.
  • Explain that short-distance pieces are not used unsupported and that manifold loads are kept within limits.
  • Show the store where reducers are kept blanked and clean.
Have ready
  • Reducer and spool piece register with test dates
  • Pressure test records
  • Gasket selection chart
  • Manifold arrangement drawing
  • Company SMS manifold procedure

8.3.18 Inert gas system pressure/vacuum-breaking (P/V) device(s) Rotational 2

Can the Master and officers explain what the P/V breaker on the IG main is for, how it works and how it is tested and maintained, and is it in good condition?

In one lineP/V breaker is the back-up for P/V valves; keep the liquid level and antifreeze correct and record checks.

How to answer
  • Explain the purpose: a back-up protection that opens at a pressure or vacuum beyond the P/V valve settings.
  • Describe how you verify the liquid level, using the sight glass or dipstick, and check the antifreeze concentration where applicable.
  • State the set pressure and vacuum and how they compare with P/V valve and alarm settings.
  • Explain the maintenance done per PMS: draining, cleaning, refilling and checking for corrosion.
  • Describe actions if it has operated: investigate the cause, refill and inspect before resuming.
Have ready
  • P/V breaker maintenance and level check records
  • Maker's manual with filling instructions
  • Settings list for P/V valves, P/V breaker and alarms
  • IGS diagram

8.3.19 Indicators and alarms for the inert gas system Rotational 2

Can the Master and officers explain each IGS indicator and alarm, how it works and how it is tested, and have these been run, maintained and calibrated as the maker and the company require?

In one lineKnow every IGS alarm and set point, test and calibrate them per PMS, and switch to backup monitoring and restrict operations if one fails.

How to answer
  • Explain each indicator and alarm and its set point.
  • Describe how and when alarms are tested and show the records.
  • Explain how instruments are calibrated or compared (pressure gauges against a test gauge, analyser with calibration gas).
  • Describe failure actions: report to the Master, use portable instruments or local gauges for monitoring, restrict operations as the company procedure requires, and arrange repair.
  • Show the recorder charts or electronic trends.
Have ready
  • IGS alarm test records
  • Alarm set point list
  • Calibration records for analysers and pressure transmitters
  • Recorder charts or IAS trends
  • Defect reports
  • Company SMS IGS procedure

8.3.20 Connections and interconnections to/with the inert gas system piping Rotational 2

Do the Master and officers understand the connections to the IG system used for normal and emergency inert gas operations, and are these arrangements in good condition and clearly marked for their purpose?

In one lineKnow the emergency IG connections for double hulls and forepeak, the external supply point, and keep IG/cargo line interconnections positively isolated.

How to answer
  • Point out the connections and explain what each is for.
  • Explain how inert gas would be supplied to a double-hull space or the forepeak in an emergency (for example a portable hose or spool from the IG main) and when this would be needed, such as a hydrocarbon leak into a ballast tank.
  • Explain where an external IG supply would be connected if the ship's IGS fails.
  • Describe how the IG main is connected to cargo lines and how it is positively isolated afterwards (blanks, spool removed or double valves with drain).
  • Show that the pieces are stored nearby, labelled and in good condition.
Have ready
  • IGS and cargo piping diagrams showing interconnections
  • Emergency spool pieces and hoses
  • Labels at connections
  • Company SMS emergency IG procedure
  • Inspection records

8.3.21 Cargo heating system Rotational 2

Do the Master and officers know the company procedure for heating cargo, and is the heating system in good order, tested and used as the procedure requires?

In one linePlan heating within cargo, coating and adjacent-cargo limits, test coils before loading, monitor and record temperatures.

How to answer
  • Explain how the heating plan is made: required temperatures, start time, adjacent heat-sensitive cargoes, coating and IBC limits.
  • Describe the coil pressure test before loading and the check of the observation tank for cargo traces.
  • Explain how temperatures are monitored, recorded and controlled during the voyage.
  • Describe actions on a coil leak: isolate, blank, inform the company, prevent contamination of the boiler system.
  • Show the cargo heating log and the instructions you followed.
Have ready
  • Cargo heating instructions and heating plan
  • Heating coil pressure test records
  • Cargo temperature log
  • Observation tank inspection records
  • Coating resistance and temperature limits
  • Company SMS cargo heating procedure

8.3.22 Cargo doping and additives Rotational 2

Do the Master and officers know the company procedures for adding dopes or additives to cargo on board, and have those procedures been followed?

In one lineDope only with written instructions and company approval, never blend at sea, follow SDS precautions and record the quantities.

How to answer
  • Explain that doping is done only with written instructions and company approval, usually in port and under the terminal's knowledge.
  • State that blending or production processes at sea are prohibited by SOLAS.
  • Describe the risk assessment and handling: SDS reviewed, PPE, closed method of addition, bonding, spill precautions.
  • Explain how the quantity added and the tanks dosed are recorded and reported.
  • Show the records of the last doping operation if any.
Have ready
  • Charterer/shipper doping instructions
  • Company approval and risk assessment
  • Additive SDS
  • Cargo log and documentation of quantities
  • Company SMS doping procedure

8.3.23 Cargo tank temperature monitoring systems Rotational 2

Do the Master and officers know the company procedures for maintaining, testing and calibrating cargo temperature monitoring equipment, and is it in good condition?

In one lineDemonstrate the system, compare fixed sensors with a calibrated portable UTI, record the results and report faulty sensors.

How to answer
  • Demonstrate the fixed temperature monitoring display and explain the alarm settings.
  • Explain how you check accuracy: compare with calibrated portable UTI readings at the same level and record differences.
  • Explain the calibration interval and who performs it.
  • Describe actions if a sensor is faulty: report, use portable readings, inform charterer if heating or limits are affected.
  • Show the comparison and calibration records.
Have ready
  • Temperature monitoring system display
  • Comparison records fixed vs portable
  • Calibration certificates
  • PMS entries
  • Defect reports

8.3.24 Cargo manifold arrangements Rotational 2

Do the Master and officers know the company procedures for handling cargo and vapour connections at the manifold, and is the manifold arrangement in good condition?

In one lineProper gaskets and full bolting, gauges fitted, drip trays clean, manifold watched continuously; stop at once if leaking.

How to answer
  • Explain how connections are made and checked: correct gaskets, every bolt fitted, hoses or arms supported, pressure gauge fitted and valves tested.
  • Describe how leaks are detected: continuous manifold watch, visual checks of flanges, gas detection, pressure gauge readings and drip tray checks.
  • Explain actions on a leak: stop transfer, close valves, contain spill, inform terminal and Chief Officer.
  • Explain how unused connections are blanked fully bolted and drip trays kept empty.
  • Show the manifold area and pressure gauge calibration.
Have ready
  • Manifold area, drip trays and blanks
  • Pressure gauges with calibration records
  • Manifold watch checklist
  • Ship/shore safety checklist
  • Spill kit at the manifold

8.3.25 Receiving nitrogen from shore Rotational 2

Do the Master and deck officers know the company procedures for taking nitrogen from shore for inerting, purging or padding cargo tanks, or for blowing cargo lines clear?

In one lineAgree nitrogen pressure and rate with the terminal, watch tank pressures, keep people away from vents.

How to answer
  • Explain that nitrogen supply rate and pressure are agreed with the terminal before starting, considering P/V valve capacity.
  • Describe monitoring of tank and line pressures during receipt and stopping if pressure approaches the alarm settings.
  • Explain line clearing precautions: receiving tank lined up and vented, rate controlled, watch for slugs of cargo.
  • Describe personnel safety: nitrogen is an asphyxiant; no one near open vents, warning notices posted, enclosed space precautions.
  • Show the checklist and records for the operation.
Have ready
  • Company SMS procedure for receiving nitrogen
  • Ship/shore safety checklist and agreed rates/pressures
  • Tank pressure records
  • Nitrogen receipt documentation
  • Warning signs

8.4.1 Carriage of inhibited cargoes Rotational 2

On an LPG carrier, do the Master and officers know the company procedures for carrying cargoes that need an inhibitor, such as butadiene, and have they been followed?

In one lineInhibitor certificate on board, lifetime covers voyage, keep oxygen very low, monitor for polymerisation.

How to answer
  • Explain that inhibited cargo is not loaded without the inhibitor certificate and that lifetime is checked against voyage length.
  • Describe oxygen control: tanks and reliquefaction plant inerted before loading and oxygen in vapour kept below the shipper/company limit.
  • Explain how you watch for polymerisation: cargo temperature trends, compressor performance, filter and condenser checks.
  • Explain actions if the voyage is delayed beyond inhibitor lifetime: contact shipper and company for instructions.
  • Show the records of the last inhibited cargo carried.
Have ready
  • Inhibitor certificate
  • Cargo SDS
  • Oxygen readings of tank atmosphere before loading
  • Cargo temperature and pressure log
  • Company SMS procedure for inhibited cargoes
  • IGC Code

8.4.2 Cargo sampling Rotational 2

Do the Master and officers know the company procedures for taking cargo samples on a gas carrier?

In one lineClosed sampling in pressure-rated containers with face shield and cold gloves, after a briefing on the cargo hazards.

How to answer
  • Explain the sampling procedure: closed system, pressure-rated cylinders, slow opening of valves, two people present.
  • Describe the hazards: cold burns, liquid flashing to vapour, toxicity (e.g. ammonia, VCM), flammability.
  • State the PPE you wear and why.
  • Explain how sample points are vented, purged and capped after use.
  • Show the cargo information and briefing records.
Have ready
  • Sampling equipment and sample cylinders
  • Cargo SDS and cargo information
  • PPE locker
  • Toolbox talk record
  • Company SMS sampling procedure

8.4.3 Segregating incompatible cargoes and refrigerants Rotational 2

During stowage planning, do the Master and officers follow the company procedure to find cargoes that must not mix with each other or with the reliquefaction refrigerant, and to keep them apart?

In one lineCheck cargo-to-cargo and cargo-to-refrigerant compatibility, segregate lines and plant, and document it in the plan.

How to answer
  • Explain how you use the compatibility chart for cargo pairs and for cargo against the refrigerant used in the reliquefaction plant.
  • Describe the physical segregation needed: separate piping and plant, blanks or removable spools, separate vent risers if required.
  • Explain material checks such as no copper alloy in ammonia service.
  • Show the stowage plan and the documented compatibility check approved by the Master.
Have ready
  • Cargo/refrigerant compatibility chart
  • Stowage plan with compatibility check
  • Cargo system operation manual
  • Certificate of Fitness
  • Company SMS cargo planning procedure

8.4.4 Carriage of propylene oxide (PO) and/or ethylene oxide (EO) Rotational 2

Do the Master and officers know the company procedures for safely carrying propylene oxide, ethylene oxide and their mixtures, where the ship carries them?

In one lineClean tanks, acceptable previous cargo, keep nitrogen pad and O2 low, dedicated hoses, monitor temperature.

How to answer
  • Explain that these cargoes are reactive and can polymerise or decompose, so tanks must be thoroughly clean and the previous cargo acceptable.
  • Describe padding: nitrogen pad maintained throughout, oxygen in vapour kept below the IGC limit.
  • Explain material and equipment restrictions, including hoses dedicated to the service.
  • Describe temperature monitoring and the emergency actions for rising temperature, including water spray.
  • Show the company procedure and records.
Have ready
  • Company SMS procedure for PO/EO
  • IGC Code chapter 17
  • Tank inspection and cleaning certificate before loading
  • Nitrogen padding and oxygen records
  • Cargo temperature log
  • Hose register (dedicated hoses)

8.4.5 Escape sets as required by the IGC Code Rotational 2

Does the gas carrier have enough IGC Code emergency escape sets for everyone on board, and do the sets protect both breathing and eyes?

In one lineOne self-contained escape set per person, eye and breathing protection, in date and charged.

How to answer
  • State how many escape sets are on board, where they are, and confirm one for everyone.
  • Explain why the type is suitable: self-contained air supply with hood for at least 15 minutes, giving eye and breathing protection.
  • Demonstrate donning the set.
  • Explain the checks and service schedule.
Have ready
  • Escape sets in cabins and work areas
  • Escape set inventory list
  • Pressure check and service records
  • Drill records

8.4.6 Cargo tank insulation Rotational 2

Do the Master and officers know the company procedures for inspecting and maintaining cargo tank insulation, and do reports show the insulation is in good condition?

In one lineInspect insulation at every hold entry and at dry-dock, watch for cold spots and moisture, report and record defects.

How to answer
  • Explain how insulation is inspected: visual checks during hold space entries, detailed survey at dry-dock, and watching for cold spots, frost or abnormal boil-off on passage.
  • Describe how defects are recorded, photographed and reported to the company.
  • Explain why damaged insulation matters: more boil-off, cold spots on hull steel, moisture getting into the insulation.
  • Explain how the hold atmosphere is kept dry to protect the insulation.
  • Show the latest inspection reports and any open defects.
Have ready
  • Hold space inspection records
  • Insulation inspection reports with photos
  • Defect reports and repair history
  • Hold atmosphere and dew point log
  • Company SMS hold space inspection procedure

8.4.7 Vent outlet protection screens or flame screens Rotational 2

Are the cargo containment vent outlets fitted with the protection screen or flame screen that the carried cargo requires, and are those screens in good condition?

In one lineCorrect screen type for the cargo, intact and clear, inspected per PMS with spares on board.

How to answer
  • Explain which cargoes on your Certificate of Fitness need flame screens at the vent outlets and which only need protection screens against foreign objects.
  • Describe how and how often the screens are inspected and replaced, and who does it.
  • Explain precautions in cold weather and after mast fires or venting, when screens can be blocked or damaged.
  • Show the inspection record and spare screens.
Have ready
  • Vent mast outlet screens (photographs if access is restricted)
  • Certificate of Fitness cargo list
  • IGC Code product requirements
  • PMS inspection records
  • Spare screens in store

8.5.1 Custody transfer measurement system (CTMS) Rotational 2

On an LNG carrier, do the Master and officers know how the company wants the CTMS operated, tested and calibrated, and is the system in good condition?

In one lineCTMS calibrated and certified, gauges compared before every transfer, discrepancies reported and recorded.

How to answer
  • Explain how the CTMS calculates volume: level corrected for trim, list and temperature, then converted using the certified tank tables.
  • Describe the checks you make before each custody transfer: system self-test, comparison of primary and secondary level gauges, temperature sensor plausibility, trim and list inputs correct.
  • Explain the periodic calibration done by approved specialists and show the certificates.
  • Describe what you do if readings disagree beyond tolerance: report, use the secondary gauge as agreed, inform charterer, terminal and surveyor, and raise a defect.
  • Show a recent custody transfer report and how it was signed.
Have ready
  • CTMS calibration certificates
  • Certified tank gauge and correction tables
  • Primary/secondary gauge comparison records
  • Custody transfer reports (opening and closing)
  • CTMS maker's manual
  • Defect reports

8.5.2 Gas Combustion Unit (GCU) Rotational 2

Where a gas combustion unit is fitted, do the Master and officers know the company procedures for operating, inspecting, maintaining and testing it?

In one lineGCU controls tank pressure by burning excess boil-off; test trips, know manual mode and alternatives, vent only as last resort.

How to answer
  • Explain when the GCU is used and how it fits into tank pressure control alongside engines and any reliquefaction.
  • Walk the inspector through the start sequence and the automatic pressure control mode.
  • Explain how alarms and trips are tested and show the records.
  • Describe actions if it fails in automatic: find the trip cause, try manual mode only if the manual allows and the fault is cleared, use other boil-off consumers, monitor tank pressure closely, and treat venting to the mast as the last resort.
  • Explain the coordination between CCR, bridge and engine room.
Have ready
  • GCU maker's manual and operating instructions
  • Alarm and trip test records
  • PMS maintenance history
  • Tank pressure trend records
  • Company SMS boil-off management procedure

8.5.3 LNG gas fuel supply system Rotational 2

Do the Master and officers know the company procedures for inspecting, maintaining and testing the safety features of the LNG fuel gas supply system, and are these in good condition?

In one lineGas detectors calibrated, duct ventilation working, master gas valve tested, fuel lines purged with nitrogen before maintenance.

How to answer
  • Explain the safety concept: gas contained in double pipes or ducts, continuous ventilation, gas detection, automatic shut-off by the master gas fuel valve.
  • Describe how gas detectors are tested and calibrated with span gas at the PMS intervals.
  • Explain how the master gas valve closes automatically and how it can be operated manually, and how this is tested.
  • Walk the inspector through inerting and gas-freeing the fuel gas piping in the machinery spaces with nitrogen before work, with readings recorded.
  • Show the latest test records.
Have ready
  • Gas detection calibration and test records
  • Master gas fuel valve test records
  • Fuel gas system diagram
  • Duct ventilation alarm tests
  • PMS records
  • Purging/gas-freeing procedure and records

8.5.4 Cold spots and cofferdam temperature monitoring and heating equipment Rotational 2

Do the Master and officers know the company procedures for keeping hull steel safe from very low cargo temperatures, and are the hull temperature monitoring and cofferdam heating systems, where fitted, in good condition?

In one lineMonitor hull temperatures, keep cofferdam heating and standby running, report any cold spot to company and class at once.

How to answer
  • Explain why hull steel must stay above the temperature its grade is designed for and how the monitoring system shows this.
  • Describe the cofferdam heating system: heaters, circulation pumps, standby units and how they are tested.
  • Describe cold spot actions: confirm with portable instruments, increase heating locally, increase monitoring, report to the Master, company and class, and follow the Cargo System Operation Manual.
  • Explain heating failure actions: start the standby unit, monitor temperatures more often, report and repair.
  • Show temperature records.
Have ready
  • Hull and cofferdam temperature records
  • Cofferdam heating system log
  • Alarm test records
  • Cargo System Operation Manual
  • Defect reports

8.6.1 Cargo tank overfill alarms Core

Do the Master and officers know the company procedures for maintaining, testing and setting the independent high-level and overfill alarms of gas carrier cargo tanks, and are these alarms working and properly set?

In one lineIndependent alarms tested before loading, set to filling limits, overrides only with Master's permission and logged.

How to answer
  • State the set points and show how they relate to the filling limits.
  • Explain how alarms are tested before loading and recorded.
  • Explain that overrides are only for specific cases such as testing, with Master's permission, and recorded.
  • Describe actions on alarm: stop loading, check levels, investigate.
Have ready
  • Alarm test records
  • Set point list
  • Override log
  • Cargo system operation manual
  • PMS records

8.6.2 Cargo transfer Emergency Shut Down (ESD) Core

Do the Master, officers and ratings who take part in cargo work understand how the cargo transfer ESD system works, and is the equipment kept working, inspected, tested and maintained at regular intervals?

In one lineESD closes valves and stops pumps; valves close within 30 seconds; test with shore before transfer; inhibit only on Master's written authority.

How to answer
  • Explain what the ESD system shuts down and what automatically triggers it (e.g. tank high-high level, fire detection/fusible links, loss of control power, signal from shore).
  • Point out the manual activation points around the deck and CCR.
  • State the measured closing times of the manifold ESD valves and explain how the agreed loading rate is checked against them to avoid pressure surge.
  • Describe the pre-transfer ESD test with the terminal, normally done warm before cargo arrives and recorded on the checklist.
  • Explain that ESD may be inhibited only for testing or a defined operation under the Master's written authority, with the inhibit logged and removed afterwards.
Have ready
  • ESD test records and pre-transfer test checklist
  • ESD valve closing time records
  • ESD cause-and-effect matrix in the Cargo System Operation Manual
  • Ship/shore link connectors and test record
  • Inhibit/override log
  • PMS records for ESD valves and actuators

8.6.3 Cargo tank relief valves Rotational 1

Do the Master and officers know the company procedures for inspecting, maintaining and testing the cargo tank relief valves and for changing their settings?

In one lineChange relief settings only with approval, reset alarms to match, log it, test per PMS, keep enough relief capacity if one valve is out.

How to answer
  • Explain the relief valves fitted (usually pilot-operated, at least two per tank) and their current set pressure.
  • Walk the inspector through changing the set pressure: Master's approval, change pilots or settings as per the manual, adjust the high-pressure alarm to match, record in the cargo log.
  • Explain inspection and testing: routine checks of pilot sensing lines and drains, bench testing and overhaul at the intervals in the PMS/class rules.
  • Describe malfunction actions: control tank pressure by reliquefaction or other means, isolate the faulty valve only as the manual permits so the required relief capacity remains, report to the company.
  • If an automated venting system is fitted, explain its set points and how it is tested.
Have ready
  • Relief valve set pressure change log
  • Relief valve test/overhaul certificates
  • Cargo System Operation Manual section on relief valves
  • Tank pressure alarm set point list
  • PMS records
  • Certificate of Fitness (MARVS)

8.6.4 Cargo System Operation Manual Rotational 1

Is there a Cargo System Operation Manual written for this specific ship on board, and do the Master and officers know what is in it?

In one lineShip-specific Cargo System Operation Manual kept in the CCR; know its contents and use it for every operation.

How to answer
  • Show the manual in the CCR and explain its main chapters.
  • Give examples of how you use it: cool-down rates, pressure limits, compressor line-ups, set points, emergency procedures.
  • Find a specific item on request, for example relief valve settings or tank cool-down rate.
  • Explain how changes to the ship or plant are reflected in the manual.
Have ready
  • Cargo System Operation Manual
  • Revision record
  • Cargo plans that refer to the manual
  • Company SMS cargo procedures

8.6.5 Maintaining the atmosphere in the interbarrier spaces and/or hold spaces Rotational 1

Do the Master and officers know the company procedures for checking that the cargo containment system is tight and for keeping the atmosphere in interbarrier and hold spaces safe, and have records been kept?

In one lineKeep the required inert or dry atmosphere, monitor gas, pressure and dew point, record trends and investigate any rise.

How to answer
  • Explain the containment type and the atmosphere you maintain in the hold or interbarrier spaces.
  • Describe the gas detection system, the alarm levels and how you check it is working.
  • Explain how pressure and dew point are controlled and recorded.
  • Describe actions if gas readings rise: verify readings, increase monitoring, check for leaks, report to the Master and company, follow the Cargo System Operation Manual.
Have ready
  • Hold/interbarrier space atmosphere log
  • Gas detection records and calibration
  • Dew point records
  • Insulation space pressure records
  • Cargo System Operation Manual

8.6.6 Cargo system alarm management Rotational 1

Do the Master and officers know the company procedures for managing and responding to cargo system alarms, and have these procedures been followed?

In one lineKnow cargo alarm set points, investigate every alarm, inhibit only with Master's authority and log it.

How to answer
  • Explain the main cargo alarms and their set points, and show the list.
  • Describe how alarms are acknowledged, investigated and recorded.
  • Explain that alarms are inhibited or overridden only with Master's authority, logged, and with an alternative control in place.
  • Show how standing alarms are minimised and defects reported.
Have ready
  • Alarm set point list
  • Alarm override/inhibit log
  • Alarm test records
  • Defect reports
  • Company SMS alarm management procedure

8.6.7 Inert gas system Rotational 2

Do the Master and officers know the company procedures for operating, inspecting, testing and maintaining the gas carrier's inert gas or nitrogen generating plant and its associated equipment, and is it in good condition?

In one lineDeliver IG or nitrogen only within O2 and dew point limits, test alarms, ventilate the plant room, respect asphyxiation risk.

How to answer
  • Explain what the plant is used for on board and the oxygen and dew point limits you work to.
  • Describe starting, checking purity and delivering only when within limits.
  • Explain alarm/trip tests and analyser and dew point meter calibration.
  • Describe the dangers of nitrogen leaks and oxygen-enriched exhaust and the room precautions (ventilation, oxygen monitor, signs).
  • Show maintenance records.
Have ready
  • IG/nitrogen plant manual
  • Alarm test and calibration records
  • Oxygen and dew point records
  • PMS records
  • Room oxygen monitor and warning signs

8.6.8 Gas vessel cargo manifolds Rotational 2

On a gas carrier, do the Master and officers know the company procedures for handling cargo and vapour connections at the manifold, and is the manifold arrangement in good condition?

In one lineWatch for frost and gas, monitor strainer differential, purge with nitrogen before disconnecting, protect the hull from cold spills.

How to answer
  • Explain the hazards of cold cargo at the manifold and the protection used: water curtain on the hull where fitted, stainless drip trays, PPE.
  • Describe leak detection: frosting, gas detectors, visual watch; on a leak stop transfer (ESD if needed), contain and inform the terminal.
  • Explain how the strainer differential pressure is monitored and when the strainer is cleaned.
  • Walk through disconnection: drain liquid to tank or shore, purge with nitrogen until the hydrocarbon content is within the agreed limit, then disconnect.
  • Explain the manifold drip tray drain and how it is opened remotely if cargo spills into the tray.
Have ready
  • Manifold area, strainers and pressure gauges
  • Cargo System Operation Manual manifold section
  • Purging and disconnection checklist
  • Water curtain and drip tray drain arrangement
  • Ship/shore safety checklist

8.6.9 Manifold reducers, spool pieces and other portable pipework Rotational 2

On a gas carrier, do the Master and officers know the company procedures for using, inspecting and testing manifold reducers, spool pieces and other loose pipework, and are these items in good condition and fitted correctly when used?

In one lineLow-temperature-rated, marked and tested pieces, fitted with the right gaskets and every bolt.

How to answer
  • Explain the materials and ratings of reducers and spools for the cargoes carried.
  • Describe the inspection and test regime and show the records.
  • Explain correct fitting with suitable gaskets and all bolts tightened.
  • Show how they are stored, blanked and protected when not in use.
Have ready
  • Reducer and spool register
  • Pressure test records
  • Gasket selection chart
  • Manifold drawing
  • Company SMS manifold procedure

8.6.10 Emergency discharge operations Rotational 2

Do the Master and officers know the company procedures for emergency discharge of cargo, for example if the main cargo pumps fail, and is any extra equipment needed for this in good condition?

In one lineKnow the emergency discharge methods on board, keep the emergency pump gear ready, follow the manual's pressure limits.

How to answer
  • Explain the emergency discharge methods available on your ship.
  • Walk through the procedure: tank pressurisation with cargo vapour or the use of the emergency pump, including line-up and limits.
  • Explain the safety precautions such as purging the pump well with nitrogen and keeping tank pressure within limits.
  • Show the emergency equipment and its maintenance records.
Have ready
  • Cargo System Operation Manual emergency discharge section
  • Emergency pump and handling gear
  • Maintenance and test records
  • Company SMS procedure

8.6.11 Cargo and vapour pipeline insulation and expansion arrangements Rotational 2

Do the Master and officers know the company procedures for regularly inspecting and maintaining insulation and expansion arrangements on cargo and vapour lines, and are these arrangements in good condition?

In one lineInspect pipe insulation and expansion supports regularly, look for ice and seized supports, report and repair defects.

How to answer
  • Explain how insulation and expansion arrangements are inspected and recorded.
  • Describe defects you look for: damaged cladding, wet insulation, ice spots, seized supports, cracked bellows.
  • Explain how defects are reported and repaired.
  • Show the latest records.
Have ready
  • Pipeline inspection records
  • PMS entries
  • Defect reports
  • Piping diagrams showing expansion arrangements

8.6.12 IGC safety, rescue and recovery equipment Rotational 2

Do the Master and officers know the company procedures for the safety, rescue and recovery equipment required by the IGC Code, including SCBAs, and is it ready for immediate use?

In one lineIGC safety sets complete, SCBAs charged and tested, stretcher and oxygen resuscitator ready, drills held.

How to answer
  • Explain where the IGC safety equipment sets are kept and what each set contains.
  • Describe SCBA checks and service schedule.
  • Show the rescue stretcher and oxygen resuscitator and explain their use.
  • Explain where to find first aid guidance and antidotes for the cargo.
  • Describe the drill scenario used to practise a rescue.
Have ready
  • Safety equipment lockers and SCBAs
  • SCBA inspection and service records
  • Rescue stretcher
  • Oxygen resuscitator
  • MFAG and cargo SDS
  • Drill records

8.6.13 Protective equipment required by the IGC Code Rotational 2

Do the Master and officers know the company procedures for IGC Code protective equipment, and is it in good condition and suitable for the cargoes handled?

In one lineChoose PPE from the SDS, inspect it, don the full set correctly, store it outside the accommodation.

How to answer
  • Explain how PPE is selected from the cargo SDS and the Certificate of Fitness cargo list.
  • Demonstrate donning the full set and checking a colleague.
  • Explain storage and inspection, and replacement after damage or contamination.
  • Describe PPE for specific tasks: connecting arms, sampling, draining and purging.
Have ready
  • Protective equipment store
  • Cargo SDS
  • PPE matrix for cargo tasks
  • Inspection records

8.6.14 Reliquefaction plant Rotational 2

Where a reliquefaction plant is fitted, do the Master and officers know the company procedures for running and maintaining it safely, and is it in good condition?

In one lineKnow the plant, test trips and alarms, purge non-condensables to the vent mast, maintain per PMS.

How to answer
  • Explain the type of plant and how it is started, run and stopped.
  • List the trips and alarms and explain how they are tested.
  • Explain how non-condensable gases are purged safely to the vent mast.
  • Describe the precautions for cargo-specific issues, e.g. polymerisation in compressors with inhibited cargoes.
  • Show maintenance and test records.
Have ready
  • Reliquefaction plant manual
  • Trip and alarm test records
  • PMS records
  • Plant operating log
  • Cargo System Operation Manual

8.6.15 Cargo heaters, vaporisers and condensers Rotational 2

Do the Master and officers know the company procedures for safely operating and maintaining cargo heaters, vaporisers and condensers, and is this equipment in good condition?

In one lineEstablish heating medium flow before cargo, monitor outlet temperatures, watch for tube leaks, maintain per PMS.

How to answer
  • Explain how each unit is operated and the precautions against freezing: establish heating medium flow before introducing cargo, and keep it running.
  • Describe how you monitor heating medium flow and outlet temperature.
  • Explain how leaks are detected and the actions taken.
  • Show maintenance and test records.
Have ready
  • Equipment manuals
  • Operating log
  • PMS records
  • Cargo System Operation Manual

8.6.16 Filling Limits (FL) and Loading Limits (LL) Rotational 2

Do the Master and officers know the filling limits and loading limits for each cargo tank, and is this information readily at hand where cargo operations are controlled?

In one lineLoading limit is derived from the filling limit and density ratio at reference temperature; use the approved tables in every plan.

How to answer
  • Explain the difference: the filling limit is the maximum tank volume at the reference temperature (normally 98% under the IGC Code unless a higher limit is approved); the loading limit is the volume you may load at the loading temperature.
  • Explain that the reference temperature corresponds to the cargo vapour pressure at the relief valve set pressure, so the loading limit depends on that setting.
  • Show how the loading limit was calculated and applied in the last loading plan.
  • Show the approved tables in the CCR.
Have ready
  • Approved FL/LL tables
  • Loading plan
  • Cargo System Operation Manual
  • Certificate of Fitness

8.6.17 Vent mast fire suppression system Rotational 2

Where fitted, do the Master and officers know the company procedures for operating, inspecting, testing and maintaining the fire extinguishing system on the vent mast, and is it in good condition?

In one lineKnow where and how to release the vent mast suppression, when to use it, and keep bottles checked and serviced.

How to answer
  • Explain the system: a smothering gas injected into the vent riser to extinguish a fire at the outlet.
  • Show the activation points and describe the steps to release it.
  • Explain when you would use it, for example a fire at the mast head during venting or a lightning strike, and what you do with cargo operations at the same time.
  • Describe inspection and testing: bottle content checks, valve and pipe condition, periodic service by an approved company.
  • Show the records.
Have ready
  • Vent mast fire suppression bottles and release station
  • Test and inspection records
  • Bottle weight/pressure records
  • Maker's manual
  • Service certificates

8.6.18 Water or liquid cargo leakage into a hold or insulation space Rotational 2

Do the Master and officers know the company procedures for detecting water entering hold or insulation spaces, and for removing any water or liquid cargo that collects there?

In one lineTest level alarms, sound and monitor gas and dew point, remove water quickly, find the source and report.

How to answer
  • Explain how leakage is detected: level alarms, regular soundings, gas detection and dew point monitoring.
  • Describe how water is removed from hold spaces and how leaked liquid cargo would be handled under the Cargo System Operation Manual, including keeping people out and controlling the atmosphere.
  • Explain how the source is investigated (ballast tank leak, condensation, pipe penetrations) and reported to the company.
  • Describe how level alarms are tested and how often.
  • Show the records.
Have ready
  • Hold/insulation space level alarm test records
  • Sounding and atmosphere logs
  • Cargo System Operation Manual
  • Company SMS procedure
  • Defect reports

8.6.19 Submerged motor electric cargo pumps Rotational 2

Where fitted, do the Master and officers know the company procedures for operating submerged electric motor cargo pumps and testing their safety devices and alarms, and have these procedures been followed?

In one lineMegger before use, cool pump and confirm level before starting, test trips, respect the start limit, stop and investigate on low level.

How to answer
  • List the protections fitted and explain how they are tested before discharge.
  • Describe the insulation resistance check before use and the minimum value you accept.
  • Explain the start rules: pump well liquid level and pump cooled down before start, and no more starts per hour than the maker allows.
  • Describe actions on low-level alarm and shutdown: reduce rate, prepare stripping, stop the pump, avoid repeated restarts.
  • Show the pump log and test records.
Have ready
  • Pump maker's manual
  • Insulation resistance records
  • Trip and alarm test records
  • Pump start and running log
  • Cargo System Operation Manual

8.6.20 Liquid line, hold, insulation and inter-barrier space relief valves Rotational 2

Do the Master and officers know the company procedures for inspecting, maintaining, testing and setting the relief valves on liquid lines, hold spaces, insulation spaces and interbarrier spaces?

In one lineKnow every line, hold and insulation space relief valve and its setting, test per PMS, never leave liquid trapped between closed valves.

How to answer
  • Explain where these relief valves are and their purpose, for example liquid line relief valves protecting against expansion of liquid trapped between closed valves.
  • Describe the test and overhaul regime and show the records with set pressures.
  • Explain how you avoid trapping liquid: draining lines after operations and following valve sequences in the manual.
  • Describe malfunction actions: isolate the section if safe, keep lines drained, report and repair; for hold or insulation space valves, keep pressure under control by other means.
  • Show the relief valve list.
Have ready
  • Relief valve list with set pressures
  • Test and overhaul records
  • PMS records
  • Cargo System Operation Manual
  • Defect reports

8.6.21 Inerting, gas freeing and gassing up operations Rotational 2

Do the Master and officers know the company guidance on controlling tank atmosphere when inerting, gas-freeing and gassing up, the thermal stress risks of cooling tanks down, and the lowest cargo temperature the tanks may handle?

In one lineDry and inert to the set limits before gassing up, cool down at the manual's rate, never load below the certified minimum temperature.

How to answer
  • Explain the sequence from warm, aerated tanks: drying, inerting, gassing-up, cool-down; and in reverse for gas-freeing: warm-up, inerting, aeration.
  • State the oxygen, dew point and hydrocarbon limits you work to and where they come from (manual or company procedure).
  • Explain the cool-down rate limits and why: uneven cooling causes thermal stresses in tank and supports.
  • State the minimum temperature on the Certificate of Fitness and explain that cargo colder than this must not be loaded.
  • Show the records from the last operation.
Have ready
  • Cargo System Operation Manual
  • Certificate of Fitness
  • Atmosphere records (O2, dew point, HC)
  • Cool-down temperature records
  • Company SMS procedure

8.7.1 BLS Emergency Shut Down (ESD) systems Core

On a shuttle tanker, do the Master and officers understand the purpose and operation of the ship's emergency shutdown systems for offshore loading, and is the equipment working, regularly inspected, tested and maintained?

In one lineKnow ESD levels and what each does, test them before each offshore loading, maintain per PMS.

How to answer
  • Explain the ESD levels on the vessel and what each does to valves, pumps and the bow loading coupler.
  • Describe how and when ESD is tested (before arriving at the field) and show the record.
  • Explain the maintenance plan for valves, hydraulic systems and sensors.
  • Explain who may activate each level and the communication with the terminal.
Have ready
  • ESD test records and pre-arrival checklist
  • ESD cause-and-effect matrix
  • PMS maintenance records
  • BLS manual
  • Terminal requirements

8.7.2 Checks when approaching an offshore terminal Rotational 1

Do the Master and officers know the company procedures and arrival checklists for the checks and actions needed when approaching an offshore terminal before DP and/or bow loading, and were they followed?

In one lineComplete the arrival and DP checklists, test BLS, ESD and telemetry, confirm weather is within limits before approach.

How to answer
  • Explain the checklist used and when it is started.
  • Describe the DP checks: power configuration, thrusters, references, sensors and DP trials.
  • Explain the BLS checks: coupler, hose handling, ESD and telemetry tests.
  • Explain weather limits and the decision to proceed.
  • Show the completed checklists.
Have ready
  • Arrival checklists
  • DP checklists and trial records
  • Terminal operating manual
  • ESD and telemetry test records
  • Weather forecast and limits

8.7.3 Control and monitoring of the Bow Loading System (BLS) Rotational 1

Do the Master and officers know the equipment used to control and monitor the bow loading system, and is it working and regularly inspected, tested and maintained?

In one lineGreen line means all loading conditions safe; know its inputs and stop loading if it is lost.

How to answer
  • Explain the telemetry and green line and what conditions must be satisfied.
  • List the input sensors to the green line.
  • Describe actions if the green line is lost: stop loading as per procedure, investigate, communicate with the terminal.
  • Explain key findings of the FMEA for the BLS.
  • Show test and maintenance records.
Have ready
  • BLS control and monitoring manual
  • FMEA report
  • Telemetry test records
  • PMS maintenance records

8.7.4 Bow Loading System (BLS) operation, inspection, testing and maintenance Rotational 1

Do the Master and officers know the company procedures for operating, inspecting, testing and maintaining the bow loading system, including its alarms and indicators, and is the BLS area well kept and free of oil?

In one lineTest BLS alarms and indicators before each loading, maintain coupler and hydraulics per PMS, keep the area clean and leak-free.

How to answer
  • Walk the inspector through a hook-up: bow door open, messenger line, chain into stopper, hose pulled in, coupler closed, indicators confirmed, telemetry green.
  • Explain the alarms and indicators tested before each loading and show the record.
  • Describe the maintenance done per PMS: coupler seals, hydraulic oil analysis, hose and pipe inspection, stopper and winch checks.
  • Explain how the area is kept clean and how any leak is contained and recorded.
  • Describe the disconnection sequence and how the coupler is flushed before release.
Have ready
  • BLS operating manual
  • Pre-loading BLS test checklist
  • PMS maintenance history
  • Hydraulic oil analysis results
  • BLS room and drip trays

8.7.5 Deluge system in the bow loading system (BLS) area Rotational 2

Do the Master and officers know where the bow loading area deluge system is, what it protects and how it works, and is it working and regularly inspected, tested and maintained?

In one lineKnow what the BLS deluge covers and how to activate it, flow-test it per PMS and keep nozzles clear.

How to answer
  • Point out where the deluge is and what it covers.
  • Explain how it is activated and from where, and whether it is linked to fire or gas detection.
  • Describe the test schedule (flow test, valve operation) and show the records.
  • Explain how nozzles are checked for blockage and how freezing is prevented in cold climate.
Have ready
  • Deluge system and release valves
  • Fire control plan
  • Deluge test records
  • PMS records
  • Maker's drawings

8.7.6 Fixed foam fire extinguishing system in the bow loading system (BLS) area Rotational 2

Do the Master and officers know where the fixed foam system protecting the bow loading area is, what it covers and how to operate it, and is it working and regularly inspected, tested and maintained?

In one lineKnow the BLS foam system coverage and start-up, test the foam concentrate, maintain it per PMS.

How to answer
  • Explain what the system protects and where its outlets are.
  • Describe how to start it: fire pump, foam valves, proportioner, release.
  • Explain the foam concentrate test (periodic laboratory analysis) and quantity check.
  • Show test and maintenance records.
Have ready
  • Foam system and release station
  • Foam concentrate test certificate
  • PMS records
  • Fire control plan

8.7.7 DP Equipment condition and maintenance Rotational 2

Is every item of DP equipment in good working order, and is all of it covered by the planned maintenance system?

In one lineAll DP equipment in the PMS and maintained, defects assessed against capability, trials current.

How to answer
  • Explain the DP system configuration and redundancy.
  • Show that each DP component is in the PMS with maintenance done on time.
  • Explain how DP defects are reported, risk-assessed and their effect on operating limits.
  • Show the latest annual DP trials and the pre-operation checks.
Have ready
  • PMS DP equipment list and maintenance history
  • Annual DP trials report
  • DP defect list
  • DP operations manual
  • Critical spares list

8.7.8 DP FMEA Rotational 2

Do the Master and officers know the DP FMEA of their ship, is the newest version on board, and have any changes made to the DP system been included in it?

In one lineLatest FMEA on board including modifications; know worst-case failure, thruster fail-safe modes and closed bus risks.

How to answer
  • Explain what the FMEA is and the worst-case failure it identifies.
  • Describe actions for typical failures, such as loss of one switchboard, a thruster or a position reference.
  • State the fail-safe mode of each thruster type on board.
  • Explain the risks of closed bus tie operation and the protection required.
  • Show the latest revision and confirm modifications are included.
Have ready
  • DP FMEA (latest revision)
  • FMEA proving trials report
  • DP operations manual and activity-specific operating guidelines
  • Modification records

8.7.9 Gas and fire detection systems in the bow loading system (BLS) area Rotational 2

Do the Master and officers know where the gas detectors and fire detectors covering the bow loading area are, what they do and how they work, and are they in good order, regularly tested, maintained and calibrated?

In one lineKnow BLS gas and fire detector locations and alarm actions, calibrate and test them per PMS, stop loading on alarm.

How to answer
  • Explain where the detectors are and what they monitor.
  • Describe the alarms and automatic actions, and your response: stop loading, investigate, ESD if needed.
  • Explain how gas detectors are calibrated and fire detectors tested, and show records.
  • Describe what you do if a detector is faulty.
Have ready
  • Gas and fire detection panel
  • Calibration certificates and span gas
  • Test records
  • PMS records
  • Cause-and-effect matrix

8.8.1 Cargo hold hatch covers Core

On an OBO or combination carrier, do the Master and officers know the company procedures for operating, inspecting, maintaining and testing cargo hold hatch covers, and are the covers in good condition?

In one lineInspect seals and cleats, test tightness, keep tank pressure within the range for effective hatch sealing.

How to answer
  • Explain how hatch covers are operated and secured, including cleats and hydraulic systems.
  • Explain how seals are inspected and replaced, and how tightness is tested and recorded.
  • State the tank atmosphere pressure range that keeps the hatch seals effective in wet mode and how it is monitored.
  • Describe action on a leaking seal: report, limit pressure, repair.
Have ready
  • Hatch cover maintenance records
  • Tightness test records
  • PMS
  • Maker's manual
  • IG pressure records

8.8.2 Changing between wet and dry cargoes Rotational 2

On an OBO or combination carrier, do the Master and officers know the company procedures, including ship-specific checklists, for changing between wet (oil) and dry cargo modes, and are there records showing they were followed?

In one lineUse ship-specific checklists, gas-free and certify before dry cargo, isolate lines, record each stage.

How to answer
  • Explain the changeover sequence for wet to dry: cleaning, gas-freeing, gas-free certificate, isolation of lines and IG, hold inspection.
  • Explain dry to wet: cleaning holds, hatch seal checks, line reinstatement, inerting.
  • Show the completed checklists.
  • Explain who signs and approves each stage.
Have ready
  • Changeover checklists
  • Gas-free certificates
  • Tank cleaning records
  • Oil Record Book
  • Company SMS procedure

8.99.1 Cargo and ballast transfer planning and execution Core

Do the Master and every officer involved in cargo transfers know how the company requires cargo and ballast transfers to be planned, and do records show each operation was planned that way and carried out as agreed?

In one lineWritten plan with stability and stress at each stage, agreed with terminal, signed by all officers, followed and re-approved on changes.

How to answer
  • Walk the inspector through the last cargo plan: sequence, rates, ballast, stability and stress at each stage, line-ups, critical points, and contingency.
  • Explain how the plan is agreed with the terminal and communicated to the watch officers and ratings.
  • Explain how deviations are handled: stop, re-plan, re-check stability and stress, Master's approval, everyone informed.
  • Show the hourly records and stress/stability checks that match the plan.
  • Explain the topping-off procedure and extra manning.
Have ready
  • Cargo and ballast plan with signatures
  • Stability and stress printouts for each stage
  • Terminal agreement and ship/shore safety checklist
  • Cargo log and hourly records
  • Ballast water record book
  • Company SMS cargo planning procedure

8.99.2 Ship/Shore Safety Checklist (SSSCL) Core

Do the Master and all officers responsible for cargo, tank washing or ballast operations know the ISGOTT Ship/Shore Safety Checklist requirements, and are the right parts of the checklist in use, with every provision and agreement kept throughout?

In one lineComplete the relevant SSSCL parts honestly, keep agreements, do and sign the repeat checks at the agreed interval.

How to answer
  • Explain the parts of the SSSCL used and when each is completed.
  • State the agreed repeat check interval and show the signed repeat checks.
  • Explain how agreements are kept (rates, emergency stop, communications) and what happens if conditions change.
  • Explain who signs for the ship and that a 'no' answer must be resolved before operations proceed.
Have ready
  • Completed SSSCL
  • Repeat check records
  • Agreed loading/discharge rates
  • Terminal information
  • ISGOTT on board

8.99.3 Cargo operations team composition Rotational 1

Do the Master and officers know the company rules on how much supervision and support cargo and port operations need, and was each operation staffed and supervised by a suitable team as those rules require?

In one lineFollow company supervision levels, Chief Officer present at critical stages, rest hours kept, SIMOPS assessed and approved.

How to answer
  • Explain the company supervision levels and the critical stages when the Chief Officer must be in the CCR.
  • Show the cargo watch schedule and explain how you keep rest hours compliant through long port stays.
  • Explain how SIMOPS are risk-assessed, approved by the Master and coordinated with the terminal.
  • Describe the call-out criteria in the Chief Officer's standing orders.
  • Explain how a new or junior officer is supported until familiar.
Have ready
  • Cargo watch schedule
  • Rest hour records
  • Chief Officer's standing orders for cargo watch
  • SIMOPS risk assessment and permits
  • Familiarisation records
  • Company SMS procedure on cargo supervision

8.99.4 Cargo and ballast valve testing Rotational 1

Do the Master and officers know how the company requires the valves of the cargo and ballast systems to be checked and tested, and are the valves and their remote control system in good working order?

In one lineTest valves before operations, compare remote and local indication, know how to operate valves with the hand pump.

How to answer
  • Explain the valve test done before cargo operations and how results are recorded.
  • Describe how remote indicators are checked against local indicators.
  • Demonstrate operating a valve with the portable or local hand pump, or explain the emergency control mode fitted.
  • Explain how defects are reported and how a valve with a defect is controlled until repaired.
  • Show the records.
Have ready
  • Valve test records
  • Hydraulic remote control system manual
  • Portable/local hand pump and connection points
  • PMS records for valves and actuators
  • Defect reports

8.99.5 Fixed cargo tank level gauging system Rotational 1

Do the Master and officers know the company procedures for operating, maintaining, testing, calibrating and cross-checking the fixed cargo tank gauging system, and is it in good order and fully working?

In one lineCompare fixed gauges with portable UTI regularly, know alarm settings, report defects and use extra manual gauging until fixed.

How to answer
  • Explain how the fixed gauging works (radar, float or pressure type) and show the alarm settings.
  • Describe the routine comparison with portable UTI readings or secondary gauges and the tolerance you accept.
  • Explain the calibration or verification done and show records.
  • Describe actions if a gauge fails: report as a defect, inform terminal and charterer, use portable gauging more often, reduce rates when topping off, follow company restrictions on that tank.
  • Show the defect reports and repair status.
Have ready
  • Gauging system display and alarm settings
  • Comparison records
  • Calibration/verification certificates
  • PMS records
  • Defect reports

8.99.6 Stability and loading instrument(s) Rotational 2

Do the Master and deck officers know the company procedure and the maker's instructions for periodic testing of the loading computer / stability instrument, and are there records showing these tests were done as required?

In one lineTest the loading instrument with approved test conditions at the set interval, record it, and know how to check damage stability.

How to answer
  • Explain how the loading instrument is tested: enter the approved test conditions and compare results with the reference values.
  • State the test interval in the company procedure and show the records.
  • Demonstrate how to check damage stability in the instrument where approved.
  • Explain what you do if results are outside tolerance: stop using it, report, use manual calculations from the stability booklet.
Have ready
  • Loading instrument test records
  • Approved test conditions
  • Loading instrument approval certificate
  • Stability booklet
  • Company SMS procedure

8.99.7 Loading limitations Rotational 2

If the ship has loading restrictions or intact stability concerns at any stage of a voyage or cargo operation, has the company written procedures to manage them, and do the Master and cargo officers know those procedures?

In one lineKnow the ship's restrictions, build them into every plan, and check stability at each intermediate stage, not just the end.

How to answer
  • State whether your ship has any loading or stability restriction and where it is documented.
  • Explain how you build it into the cargo/ballast plan, for example limiting slack tanks or setting a ballast sequence that keeps GM positive at every stage.
  • Show the loading instrument printouts for intermediate stages of the last operation.
  • Explain what you do if a stage goes outside limits: stop, re-plan, inform the Master.
  • If there are no restrictions, say so clearly and explain how you still check intact stability at each stage.
Have ready
  • Stability booklet and loading manual
  • Company procedure on loading restrictions
  • Cargo plans with intermediate stability checks
  • Loading instrument printouts
  • Class or flag notations/restrictions

8.99.8 Cargo Transfer hoses Rotational 2

Do the Master and officers know the company procedures for choosing, inspecting, testing, storing and retiring cargo transfer hoses, and are the hoses in good condition?

In one lineRight hose for the cargo and pressure, inspected before use, tested and recorded, stored supported and capped, retired on criteria.

How to answer
  • Explain how you choose a hose: compatible with the cargo, rated above the maximum working pressure, suitable for temperature, right length and size.
  • Describe the inspection before use and what makes you reject a hose.
  • Explain the periodic tests and show the latest certificates.
  • Explain retirement criteria (age, test failure, damage) and how a retired hose is marked and removed.
  • Show the storage area and the register.
Have ready
  • Hose register
  • Hose test certificates
  • Hose storage area
  • Maker's data for hoses
  • Company SMS hose procedure

8.99.9 Cargo and ballast system controls, indicators, mimics and displays Rotational 2

Do the Master and officers know the company procedures for regularly confirming that cargo and ballast controls and indicators are accurate, and are clear, current pipeline or mimic diagrams posted at each cargo control position and in any pumproom?

In one lineCompare remote indicators with local readings regularly, calibrate per PMS, keep mimic and pipeline diagrams current and legible.

How to answer
  • Explain how often you compare remote readings with local ones and how differences are recorded.
  • Describe calibration of pressure transmitters and gauges per PMS.
  • Show the mimic and pipeline diagrams and confirm they show current valve numbers and arrangements.
  • Explain how you report discrepancies and control the risk until repaired (e.g. local confirmation of valve position).
Have ready
  • Indicator comparison records
  • Calibration records
  • Mimic display and pipeline diagrams in CCR and pumproom
  • PMS records
  • Defect reports

8.99.10 Cargo system bonding arrangements Rotational 2

Do the Master and officers know the company procedures for inspecting and maintaining the bonding (earthing straps) on independent cargo tanks, the cargo process plant and cargo lines, and are these arrangements in good condition?

In one lineInspect bonding straps, test resistance at the set interval, replace damaged straps and refit after any pipe work.

How to answer
  • Explain why bonding is needed: to prevent static charge build-up and sparks on insulated sections.
  • Describe the ship's arrangements, e.g. straps on independent tanks and on pipeline sections that are not bonded through their flanges.
  • Explain inspection and resistance testing: interval, instrument and acceptance limit in the company procedure.
  • Explain how damaged straps are reported and replaced, and that straps are reinstated after any pipe work.
  • Show the records.
Have ready
  • Bonding inspection and resistance test records
  • PMS entries
  • Bonding arrangement drawings
  • Defect and repair records

8.99.11 Independent verification of cargo piping systems line up Rotational 2

Is there a procedure for a second, independent person to check the whole cargo liquid, vapour and vent line system before cargo operations start, so that valves, vacuum breakers, sample points, drains and unused connections are set right and blanked or capped where needed?

In one lineIndependent second-person check of every valve, drain, sample point and blank against the plan before starting and after each change.

How to answer
  • Explain the line-up procedure: officer sets the line-up from the plan, a second person checks every item independently, discrepancies resolved before starting.
  • Describe the checklist items and who signs.
  • Explain that unused connections are blanked and fully bolted, drains and sample points closed and capped, and sea valves verified shut and sealed.
  • Explain that the check is repeated after any line change.
  • Show the signed records for the last operation.
Have ready
  • Line-up checklist
  • Cargo plan
  • Piping diagrams and mimic
  • Sea valve seal records
  • Company SMS procedure

An independent guide written by seafarers for seafarers. It is not affiliated with or endorsed by OCIMF and does not reproduce the SIRE 2.0 Question Library: questions are put in our own words. The official library and guidance are published by OCIMF (ocimf.org). Always follow your company's SMS.