On a gas carrier, do the Master and officers know the company procedures for using, inspecting and testing manifold reducers, spool pieces and other loose pipework, and are these items in good condition and fitted correctly when used?

In one lineLow-temperature-rated, marked and tested pieces, fitted with the right gaskets and every bolt.

How to answer

  • Explain the materials and ratings of reducers and spools for the cargoes carried.
  • Describe the inspection and test regime and show the records.
  • Explain correct fitting with suitable gaskets and all bolts tightened.
  • Show how they are stored, blanked and protected when not in use.

What the inspector looks for

  • Materials and pressure ratings suitable for low-temperature service
  • Identification marking and test records
  • Correct gaskets and full bolting
  • Insulation and support

Have ready to show

  • Reducer and spool register
  • Pressure test records
  • Gasket selection chart
  • Manifold drawing
  • Company SMS manifold procedure

Avoid

  • Unrated or untested reducers in use
  • Missing bolts or wrong gaskets
  • Damaged pieces left in use