8.3.24 Cargo manifold arrangements
Rotational 2ChemicalOilAsked to: Master, Chief Officer, 2nd / 3rd OfficerWhere: Cargo Manifold
Do the Master and officers know the company procedures for handling cargo and vapour connections at the manifold, and is the manifold arrangement in good condition?
In one lineProper gaskets and full bolting, gauges fitted, drip trays clean, manifold watched continuously; stop at once if leaking.
How to answer
- Explain how connections are made and checked: correct gaskets, every bolt fitted, hoses or arms supported, pressure gauge fitted and valves tested.
- Describe how leaks are detected: continuous manifold watch, visual checks of flanges, gas detection, pressure gauge readings and drip tray checks.
- Explain actions on a leak: stop transfer, close valves, contain spill, inform terminal and Chief Officer.
- Explain how unused connections are blanked fully bolted and drip trays kept empty.
- Show the manifold area and pressure gauge calibration.
What the inspector looks for
- Manifold blanks, gaskets, bolts and pressure gauges outboard of the manifold valves
- Drip trays clean and empty, with drains closed
- Leak monitoring during transfer
- Manifold strainers and their cleaning
- Compliance with industry manifold recommendations (OCIMF)
Have ready to show
- Manifold area, drip trays and blanks
- Pressure gauges with calibration records
- Manifold watch checklist
- Ship/shore safety checklist
- Spill kit at the manifold
Avoid
- Blanks not fully bolted
- Drip trays dirty or containing oil
- No manifold watch during transfer