8.7.1 BLS Emergency Shut Down (ESD) systems

CoreOilAsked to: Master, Chief Officer, 2nd / 3rd OfficerWhere: Bow Loading Area, Bridge, Cargo Control RoomOnly if it applies to the ship

On a shuttle tanker, do the Master and officers understand the purpose and operation of the ship's emergency shutdown systems for offshore loading, and is the equipment working, regularly inspected, tested and maintained?

In one lineKnow ESD levels and what each does, test them before each offshore loading, maintain per PMS.

How to answer

  • Explain the ESD levels on the vessel and what each does to valves, pumps and the bow loading coupler.
  • Describe how and when ESD is tested (before arriving at the field) and show the record.
  • Explain the maintenance plan for valves, hydraulic systems and sensors.
  • Explain who may activate each level and the communication with the terminal.

What the inspector looks for

  • ESD levels (e.g. ESD 1 stop loading, ESD 2 disconnect) and what triggers each
  • Test procedure before each offshore loading and the test records
  • Maintenance plan for ESD components in the PMS
  • Telemetry/green line link with the terminal and how ESD signals are exchanged

Have ready to show

  • ESD test records and pre-arrival checklist
  • ESD cause-and-effect matrix
  • PMS maintenance records
  • BLS manual
  • Terminal requirements

Avoid

  • ESD not tested before loading
  • Crew unclear on ESD levels
  • Maintenance overdue