SeaVint

8.99.10 Cargo system bonding arrangements

Rotational 2ChemicalLNGLPGOilAsked to: Master, Chief Officer, 2nd / 3rd OfficerWhere: Main Deck

Do the Master and officers know the company procedures for inspecting and maintaining the bonding (earthing straps) on independent cargo tanks, the cargo process plant and cargo lines, and are these arrangements in good condition?

In one lineInspect bonding straps, test resistance at the set interval, replace damaged straps and refit after any pipe work.

How to answer

  • Explain why bonding is needed: to prevent static charge build-up and sparks on insulated sections.
  • Describe the ship's arrangements, e.g. straps on independent tanks and on pipeline sections that are not bonded through their flanges.
  • Explain inspection and resistance testing: interval, instrument and acceptance limit in the company procedure.
  • Explain how damaged straps are reported and replaced, and that straps are reinstated after any pipe work.
  • Show the records.

What the inspector looks for

  • Bonding straps between independent tanks and hull, across pipe flanges, expansion pieces and process plant
  • Inspection and electrical resistance checks, with results recorded
  • Corroded, painted-over, broken or missing straps
  • Ship-specific arrangements and which joints need straps

Have ready to show

  • Bonding inspection and resistance test records
  • PMS entries
  • Bonding arrangement drawings
  • Defect and repair records

Avoid

  • Missing, broken or painted-over straps
  • No inspection or resistance test records
  • Straps not refitted after maintenance

Practise in the interview trainer All questions

An independent guide written by seafarers for seafarers. It is not affiliated with or endorsed by OCIMF and does not reproduce the SIRE 2.0 Question Library: questions are put in our own words. The official library and guidance are published by OCIMF (ocimf.org). Always follow your company's SMS.