11.1.93 Hose coupling arrangement
CoreOilWhere: Bow Loading Area
Does the operator's submitted photograph No. 93 (the bow loading hose coupling) match what the inspector actually sees on board on the day, and is that area free from anything of concern?
In one lineThe hose coupler matches the photo: seals and jaws in good condition, emergency release tested before every loading.
How to answer
- Before the inspection, stand at the same viewpoint as the submitted photo and compare it with the area today
- Explain the coupler and emergency release test routine before each loading
- Show maintenance and seal renewal records
- If the area has changed since the photo (repairs, new coating, equipment replaced), explain the change and show the record
What the inspector looks for
- Whether the submitted photo is a true, current picture of the area
- Coupler jaws, seals and hydraulic actuators in good condition
- Emergency release function and its test records
- Hydraulic leaks or corrosion
- Valve position indicators working
Have ready to show
- The submitted photograph and the same viewpoint on board
- Coupler PMS and test records
- Emergency release test records
- Maker's instructions
Avoid
- A photo that shows a better condition than the area actually has on the day
- Leaking seals or actuators
- Emergency release not tested
Practise in the interview trainer All questions
An independent guide written by seafarers for seafarers. It is not affiliated with or endorsed by OCIMF and does not reproduce the SIRE 2.0 Question Library: questions are put in our own words. The official library and guidance are published by OCIMF (ocimf.org). Always follow your company's SMS.