Chapter 2. Certification and documentation
19 questions with how to answer each.
2.1.1 Maintenance of Statutory Certification Core
Do the Master and senior officers know how the company keeps the ship's statutory certificates valid, are all certificates and documents on board current, and is the ship clear of class conditions or significant memoranda?
In one lineAll certificates valid and endorsed, tracked against survey windows, no overdue class items, indexed file ready on the Master's desk.
- Explain the tracking system: certificate list or software with expiry and survey windows, reviewed monthly and shared with the office
- Walk the inspector through the filing system: originals in the Master's file, indexed by an up-to-date certificate list
- State who is responsible on board (normally the Master, often delegated to an officer) and how the office technical department plans surveys
- Be ready to state the next due surveys and any open class items with their due dates and corrective plan
- If something is short-term or extended, explain why and show the authorising document from class or flag
- Original statutory and class certificates in an indexed certificate file
- Certificate and survey status list with expiry and window dates
- Latest class survey status report (printed from the class website)
- Short-term certificates, extensions or exemptions with supporting letters
- Survey reports from the last annual/intermediate/renewal surveys
- Correspondence with class/flag on any open recommendations
2.2.1 Superintendent vessel inspection and report Core
Has a company superintendent visited and inspected the ship roughly every six months, as stated in the pre-inspection questionnaire, and are there reports showing each visit included a structured inspection of the vessel?
In one lineSuperintendent inspects every six months; reports on board; findings tracked and closed in the defect system.
- State the dates of the last two superintendent visits and the port where each took place
- Explain that each visit followed a company inspection checklist covering deck, engine, accommodation, safety and documentation
- Show how findings were entered in the defect or action list and give the status of each
- Mention any items closed with evidence (photos, job records) and those awaiting spares or a shipyard
- Superintendent inspection reports for at least the last two visits
- Action/defect list showing follow-up of findings
- Pre-inspection questionnaire entry for superintendent visits
- Records in the PMS or defect system closing out the findings
2.2.2 Internal ISM audit Rotational 2
Are recent ISM internal audit reports kept on board, have non-conformities been corrected on board, and has the shore office verified and closed that corrective action?
In one lineInternal audit done within 12 months; every NC has root cause, corrective action and office-verified closure.
- State when and where the last internal audit took place and who carried it out
- Walk the inspector through each non-conformity: finding, root cause, corrective and preventive action, completion date
- Show the office verification or closure for each item
- Explain how open items are tracked (NC log or software) and reviewed at safety meetings
- Last internal ISM audit report
- Non-conformity reports with corrective action and office closure
- NC tracking log or software screen
- Safety committee minutes discussing the audit
2.2.3 Master's Review of the SMS Rotational 2
Does the Master know the company's Safety Management System well, and have the Master's reviews of the SMS been carried out as the ISM Code and company procedures require?
In one lineI know the SMS layout and policy; last two Master's Reviews done on time, with real comments and office replies.
- Explain the layout of the SMS: policy, manuals by subject, emergency procedures, forms, and how revisions are controlled
- Summarise the safety and environmental protection policy in your own words
- Give the dates of the last two Master's Reviews and the main points raised in each
- Explain that the review is required by ISM Code element 5 and done at the company-set interval, with input from officers
- Show the office's feedback and what changed as a result
- Last two Master's Review reports with dates
- Office acknowledgement or feedback on the reviews
- SMS manuals index and revision record
- Posted safety and environmental policy
- Management review minutes or circulars that reflect ship feedback
2.3.1 Structural concerns and Enhanced Survey File Core
For oil and chemical tankers: do the Master and Chief Engineer know the company procedure for keeping the Enhanced Survey File in line with class rules, and is there no physical or documented sign of problems with the hull structure or with cargo and ballast tank coatings?
In one lineESP file complete and updated after each survey; Coating Technical File kept; no unreported structural or coating issues.
- Explain that the Enhanced Survey File is kept on board (and duplicated ashore) and updated after each class survey, in line with SOLAS XI-1 and class rules
- Describe what the file contains: survey report file, thickness gauging reports, structural condition evaluation, tank coating condition
- Explain how the Coating Technical File is kept and updated after any coating repair
- Summarise the latest tank inspection results and any areas being monitored (pitting, coating breakdown)
- Show how defects found are reported to the office and class
- Enhanced Survey Programme file (survey report file and supporting documents)
- Thickness measurement reports
- Coating Technical File
- Latest tank inspection reports with photos
- Class status report showing no open structural items
2.3.2 Structural concerns and Class Survey File Core
For gas carriers: do the Master and Chief Engineer know how the company keeps the class survey file, and is the ship free of physical or documented structural concerns with the hull, hold spaces or ballast tank coatings?
In one lineClass survey file complete and current; hold spaces and ballast tanks inspected and recorded; no unreported defects.
- Explain where the survey file is kept and who updates it after class surveys and inspections
- Describe its contents: survey reports, thickness measurements, hold space and ballast tank condition records
- Summarise the latest hold space and ballast tank inspections and any monitored areas
- Explain how any structural or coating defect is reported to the office and class
- Class survey file with latest reports
- Thickness gauging reports
- Hold space and ballast tank inspection reports with photos
- Coating Technical File where applicable
- Class status report
2.3.3 Cargo, ballast & void space inspection Rotational 2
Do the Master and senior officers know the company procedure for inspecting and reporting on cargo tanks, ballast tanks and void spaces, and do records show every inspection was done on schedule with reports completed as the company requires?
In one lineEvery tank and void inspected on schedule, reports with ratings and photos, defects reported to the office.
- Explain the inspection schedule per space type and how it is tracked (PMS or tank inspection matrix)
- Walk the inspector through a recent tank inspection report: structure, coating rating, anodes, pitting, photos
- Explain the reporting criteria: what is reported to the office immediately (cracks, buckling, heavy coating breakdown)
- Mention that entry was done under permit with atmosphere testing and rescue arrangements
- Give the status of any space postponed and the office agreement for it
- Tank inspection schedule/matrix
- Completed tank inspection reports with photos
- PMS records for space inspections
- Enclosed space entry permits for those inspections
- Office correspondence on postponed or defective spaces
2.3.4 Monitoring cargo, ballast & void spaces for leakage and contamination Rotational 2
Do the Master and deck officers know the company procedures for detecting leaks from one space into another (cargo tanks, bunker tanks, ballast tanks, voids and cofferdams), including checking the ballast water surface before discharge, and are there records of these checks?
In one lineVoids and empty tanks sounded routinely, levels trended, ballast surface checked before discharge, all recorded.
- Explain the routine sounding of voids, cofferdams, duct keels and empty ballast tanks and the frequency set by the company
- Describe how cargo and ballast levels are compared over time to spot transfer between spaces
- Explain the ballast surface check: open the tank or use a sample/interface check before deballasting, and stop if contamination is seen
- State what you do if leakage is found: stop operation, inform the Master/Chief Officer, report to the office, record it
- Show the sounding book or log entries that prove the checks were done
- Sounding/ullage records for voids, cofferdams and ballast tanks
- Ballast surface inspection records or pre-discharge checklist
- Ballast operation log and Ballast Water Record Book
- Gas readings in ballast tanks and void spaces
- Cargo and ballast tank level trend records
2.3.5 Condition Assessment Program (CAP) Rotational 2
Has the ship joined a class society's voluntary Condition Assessment Programme (CAP), and is its rating documented?
In one lineEnrolled in CAP with class; current rating and certificate on board.
- State whether the ship is enrolled in CAP and with which class society
- Give the CAP rating and the date of the last assessment
- Explain that CAP is a voluntary programme assessing actual condition beyond minimum class requirements
- Show the CAP certificate or report
- CAP certificate or statement of rating
- CAP assessment report
- Pre-inspection questionnaire entry on CAP
2.4.1 Defect reporting system Core
Do the senior officers know the company procedure for reporting defects in structure, machinery and equipment to the office through the defect reporting system, and is there evidence that every defect has been reported in this way?
In one lineEvery defect raised in the company system, classified, risk-assessed if critical, and tracked to closure with the office.
- Explain the defect reporting workflow: who raises it, how it is classified, how it reaches the office and how it is closed
- Show the current open defect list and explain status and planned rectification for each item
- Explain how defects on critical equipment trigger a risk assessment and temporary measures
- Say how the Master and Chief Engineer review the list (e.g. weekly) before sending to the office
- Defect list/defect reports in the company system
- PMS records linked to defects
- Spare part requisitions for open defects
- Risk assessments for defects on critical equipment
- Office correspondence on defects
2.4.2 Defect reporting to class, flag etc Core
Where there are defects to structure, machinery or equipment, has the operator informed class, flag and/or port authorities as appropriate, and have any necessary short-term certificates, waivers, exemptions or permissions to sail been obtained?
In one lineStatutory or class-related defects reported via the office to class, flag and port; dispensations on board where needed.
- Explain that after office evaluation, defects affecting class or statutory equipment are reported to class and flag, and to the next port where required
- Give a recent example and show the correspondence and the authority's response
- Explain any condition of class or dispensation currently in force and its due date
- State that the Master also reports to the port of arrival when equipment required by SOLAS/MARPOL is defective
- Notifications to class, flag and port authorities
- Dispensations, exemptions, short-term certificates, permits to proceed
- Class status report showing resulting conditions
- Office evaluation of the defect
2.5.1 Management of Change Rotational 1
Has the company's Management of Change procedure been properly applied to changes to structure, machinery and equipment that fall under class rules or statutory survey?
In one lineAny change to class or statutory items goes through MoC: risk assessment, approvals, updated documents, crew trained.
- Explain the MoC steps: proposal, risk assessment, approval by office and class/flag if needed, implementation, familiarisation, review
- Give a recent example (e.g. new equipment fitted, software update, pipe modification) and show its MoC record
- Explain how drawings, plans, PMS and procedures were updated after the change
- Describe how the crew was trained on the change
- MoC forms and risk assessments for recent changes
- Class/flag approval for modifications
- Updated drawings, manuals and PMS entries
- Familiarisation records for the change
2.6.1 Ballast Water Management Plan Rotational 2
Do the Master, deck and engineer officers know the ship's Ballast Water Management Plan, and do records show ballast was handled in line with it?
In one lineBWMP understood, treatment system used as approved, every operation correctly entered and signed in the record book.
- Explain which standard the ship complies with and how (treatment system type or exchange), and who the designated officer is
- Walk the inspector through a recent ballasting and deballasting entry in the Ballast Water Record Book
- Describe how the treatment system is operated and what is done on a system failure or bypass (report, record)
- Mention port-specific requirements and how they are checked before arrival
- Approved Ballast Water Management Plan
- Ballast Water Record Book
- International Ballast Water Management Certificate
- Treatment system logs/data and maintenance records
- Ballast reporting forms sent to port states
2.6.2 VOC Management Plan Rotational 1
On crude oil tankers, do the Master and officers know the VOC Management Plan, and have its measures to reduce VOC emissions been applied and recorded as required?
In one lineVOC plan known; pressure kept up, venting minimised and recorded, measures included in the cargo plan.
- Explain the purpose of the VOC plan and who on board is responsible for it
- Describe the actions: controlled loading rates, keeping tank pressure high but below the PV valve setting, minimising venting, careful COW
- Show how these measures are written into the cargo/loading plan
- Show the records of tank pressure and any venting during the last voyage
- VOC Management Plan
- Cargo plan showing VOC measures
- Inert gas/tank pressure records
- Deck log and cargo log entries on venting
2.6.3 Ship Energy Efficiency Management Plan (SEEMP) Rotational 1
Do the Master and senior officers know what the ship's SEEMP (energy efficiency management plan) contains and requires, and has it been fully put into practice?
In one lineSEEMP Parts I-III known; efficiency measures in use; fuel data accurate; CII rating and improvement plan understood.
- Explain the SEEMP structure under MARPOL Annex VI: Part I efficiency measures, Part II fuel data collection, Part III CII plan
- Give practical examples of measures used on board and how they are monitored
- Explain how fuel consumption and distance are reported (noon reports, voyage reports)
- State the current CII rating and the target, and what the ship does to meet it
- SEEMP (all parts) and its approval/verification
- Fuel consumption and noon/voyage report records
- International Energy Efficiency Certificate
- CII rating statement and Statement of Compliance for fuel data
- Records of hull cleaning and propeller polishing
2.7.1 Availability of SMS content to all crew Rotational 2
Can everyone on board easily access the parts of the SMS that apply to them, in a working language they understand?
In one lineI know where to find my procedures, can open them quickly and understand them in the working language.
- Show where the SMS manuals and relevant procedures are kept (bridge, ECR, CCR, mess rooms, computer terminals)
- Find and open the procedure relevant to your job when asked
- Explain your duties and responsibilities as written in the SMS
- Confirm the SMS language is the ship's working language and that you understand it
- SMS manuals in workplaces and messrooms
- Electronic SMS access on crew computers
- Duties and responsibilities section of the SMS
- Familiarisation records showing SMS was introduced
2.7.2 Communication lines with the company and DPA Rotational 2
Does the SMS set out clear authority levels and reporting lines between the Master, officers, ratings and the company, and does everyone on board understand these as they apply to their own role?
In one lineI know my chain of command, the DPA's name and number, and that I can contact the DPA directly.
- Explain the chain of command for your role and who you report to
- Name the DPA and show where the contact details are posted
- Explain the DPA's role under ISM Code element 4: the direct link between ship and top management on safety and pollution prevention
- Confirm that you can contact the DPA directly and confidentially on any safety concern, including concerns about senior officers
- Posted DPA and company contact details
- SMS section on responsibility and authority
- Organisation chart
- Emergency contact list
2.8.1 HVPQ accurately completed Core
Is the vessel's Harmonised Vessel Particulars Questionnaire (HVPQ) in the SIRE database correctly filled in, reflecting the ship's structure, equipment, management and certificates?
In one lineHVPQ reviewed before inspection and matches the ship and its certificates; discrepancies reported for correction.
- Explain that the company updates the HVPQ and the Master reviews it against the ship before inspection
- Show a copy of the current HVPQ and confirm key data match the certificates
- Report any discrepancy found and the action taken to correct it
- Mention recent changes and when the HVPQ was updated
- Current HVPQ printout
- Certificates for cross-checking (tonnage, class, flag, dimensions)
- Correspondence with office on HVPQ updates
2.8.2 Last Port State Control Inspection Rotational 1
Are records of the latest Port State Control inspection on board, and have any deficiencies been rectified and closed out through the company's defect or non-conformity system?
In one lineLast PSC report on board; every deficiency rectified with evidence and closed in the company system.
- State the date and port of the last PSC inspection and the result
- Walk the inspector through each deficiency: cause, corrective action, evidence and office closure
- Explain how the deficiency was entered in the company NC/defect system
- Mention how the crew was briefed to prevent repeat findings
- Latest PSC inspection report
- Rectification evidence (photos, job records, service reports)
- Company NC/defect closure records
- Pre-PSC checklists used
An independent guide written by seafarers for seafarers. It is not affiliated with or endorsed by OCIMF and does not reproduce the SIRE 2.0 Question Library: questions are put in our own words. The official library and guidance are published by OCIMF (ocimf.org). Always follow your company's SMS.