2.2.2 Internal ISM audit

Rotational 2ChemicalLNGLPGOilAsked to: Master, Chief OfficerWhere: Documentation

Are recent ISM internal audit reports kept on board, have non-conformities been corrected on board, and has the shore office verified and closed that corrective action?

In one lineInternal audit done within 12 months; every NC has root cause, corrective action and office-verified closure.

How to answer

  • State when and where the last internal audit took place and who carried it out
  • Walk the inspector through each non-conformity: finding, root cause, corrective and preventive action, completion date
  • Show the office verification or closure for each item
  • Explain how open items are tracked (NC log or software) and reviewed at safety meetings

What the inspector looks for

  • Date of the last internal ISM audit (the ISM Code requires internal audits at intervals not exceeding 12 months)
  • List of non-conformities and observations raised, with root cause and corrective action
  • Whether corrective actions were completed on time and verified by the office before closure
  • How the Master and Chief Officer track open audit findings

Have ready to show

  • Last internal ISM audit report
  • Non-conformity reports with corrective action and office closure
  • NC tracking log or software screen
  • Safety committee minutes discussing the audit

Avoid

  • Audit interval exceeded
  • Non-conformities closed on board without office verification
  • Corrective action that only fixes the symptom, with no root cause
  • Officers unaware of the findings of the last audit