SeaVint

2.6.2 VOC Management Plan

Rotational 1OilAsked to: Master, Chief Officer, Chief EngineerWhere: Cargo Control RoomOnly if it applies to the ship

On crude oil tankers, do the Master and officers know the VOC Management Plan, and have its measures to reduce VOC emissions been applied and recorded as required?

In one lineVOC plan known; pressure kept up, venting minimised and recorded, measures included in the cargo plan.

How to answer

  • Explain the purpose of the VOC plan and who on board is responsible for it
  • Describe the actions: controlled loading rates, keeping tank pressure high but below the PV valve setting, minimising venting, careful COW
  • Show how these measures are written into the cargo/loading plan
  • Show the records of tank pressure and any venting during the last voyage

What the inspector looks for

  • Knowledge of the VOC Management Plan required by MARPOL Annex VI for crude oil tankers
  • Practical measures during loading, voyage and COW (pressure control, loading rates, avoiding venting)
  • Records of tank pressures, venting and VOC-related actions
  • Whether the cargo plan includes the VOC requirements

Have ready to show

  • VOC Management Plan
  • Cargo plan showing VOC measures
  • Inert gas/tank pressure records
  • Deck log and cargo log entries on venting

Avoid

  • Officers unaware of the plan or their duties under it
  • Unnecessary venting with no record
  • VOC measures not reflected in the cargo plan

Practise in the interview trainer All questions

An independent guide written by seafarers for seafarers. It is not affiliated with or endorsed by OCIMF and does not reproduce the SIRE 2.0 Question Library: questions are put in our own words. The official library and guidance are published by OCIMF (ocimf.org). Always follow your company's SMS.