2.8.2 Last Port State Control Inspection
Rotational 1ChemicalLNGLPGOilAsked to: Master, Chief Officer, Chief EngineerWhere: Documentation, Pre-board
Are records of the latest Port State Control inspection on board, and have any deficiencies been rectified and closed out through the company's defect or non-conformity system?
In one lineLast PSC report on board; every deficiency rectified with evidence and closed in the company system.
How to answer
- State the date and port of the last PSC inspection and the result
- Walk the inspector through each deficiency: cause, corrective action, evidence and office closure
- Explain how the deficiency was entered in the company NC/defect system
- Mention how the crew was briefed to prevent repeat findings
What the inspector looks for
- The last PSC report and any deficiencies with their action codes
- Evidence of rectification and closure for each deficiency
- Whether deficiencies were entered into the company defect/NC system with root cause
- Lessons shared with the fleet or crew
Have ready to show
- Latest PSC inspection report
- Rectification evidence (photos, job records, service reports)
- Company NC/defect closure records
- Pre-PSC checklists used
Avoid
- PSC deficiencies left open past their deadline
- Deficiencies closed without evidence or root cause
- No PSC report available on board
Practise in the interview trainer All questions
An independent guide written by seafarers for seafarers. It is not affiliated with or endorsed by OCIMF and does not reproduce the SIRE 2.0 Question Library: questions are put in our own words. The official library and guidance are published by OCIMF (ocimf.org). Always follow your company's SMS.