Chapter 10. Machinery spaces
32 questions with how to answer each.
10.1.1 Chief Engineer's standing and daily orders Rotational 1
Has the Chief Engineer issued written Standing Orders, backed up by Daily Orders, that put the company's engine room management requirements into practical terms, and has every engineer officer signed to confirm they have read and understood them?
In one lineSigned, ship-specific Standing Orders plus daily orders; every engineer has signed and can quote when to call the Chief Engineer.
- Explain that the Chief Engineer issues Standing Orders on taking over and that every engineer signs on joining and again when orders are revised
- Name the key contents: watch handover, UMS checks and dead man alarm use, conditions for calling the Chief Engineer, manoeuvring readiness, fuel changeover, bilge/oily water rules, PPE and permits
- Give two or three concrete 'call the Chief' triggers from the orders, e.g. any blackout, abnormal alarm you cannot clear, oil in bilge discharge, pollution risk
- Describe how Daily/Night Orders are used to pass on specific instructions for the coming day or night and that you sign them each time
- State that the orders support, and never override, the company SMS procedures
- Chief Engineer's Standing Orders with signature sheet of all engineer officers
- Daily/Night Order book with recent entries and signatures
- Company SMS engine room management and watchkeeping procedure
- Crew list to cross-check that every engineer on board has signed
- Engine room log book showing orders being followed (e.g. UMS start/end)
10.1.2 Testing main propulsion, steering gear, thrusters & power generation plant Rotational 1
Do the Chief Engineer and engineers know the company routine for testing the main engine, steering gear, thrusters and generators before they are needed and at critical stages of a voyage or operation, and are the related checklists and log entries filled in properly?
In one lineWe test steering, main engine, thrusters and generators before departure and arrival using checklists; entries in both logs match and I can steer locally.
- Walk the inspector through the pre-departure checklist: steering gear full-travel test on each pump, ME ahead/astern on air and fuel, thrusters, second generator on line
- Explain the critical points where checks are repeated: before port entry, pilot boarding, narrow channels, STS or SBM operations, entering ECA
- Describe how you change to local steering: communication with the bridge, select local, operate solenoid push buttons or the trick wheel, watch the rudder angle indicator
- Mention that emergency steering drills are done at least every three months and logged
- Show that the bridge and engine room log entries for the tests match in time
- Pre-departure / pre-arrival engine room checklists
- Steering gear test records and emergency steering drill records
- Engine room and deck log books with test entries
- Steering gear change-over diagram and emergency steering instructions posted in the steering gear room
- Thruster test records (if fitted)
- Company SMS procedure for testing propulsion and power generation
10.1.3 Periodic rounds of machinery space for non-UMS vessels Rotational 1
On a ship whose machinery space is continuously manned (not UMS), do the engineers know the company requirements for regular rounds and monitoring, and do the log book and checklists prove the rounds were actually done?
In one lineRounds are made every watch per the SMS; we check temperatures, pressures, leaks, bilges and fire risks, log readings and report anything abnormal.
- Explain how often rounds are made during your watch and who makes them
- List what you check: pressures and temperatures, leaks of fuel/lube/water, bilge levels, sounding of key tanks, purifiers, steering gear, fire hazards (oily rags, hot surfaces), sea chest and stern tube
- Describe how you record readings in the log and the round checklist and how abnormal values are reported to the Chief Engineer
- Give an example of a recent abnormal finding and what was done about it
- Engine room log book with watch readings
- Machinery space round checklists
- Company SMS procedure for engine room watchkeeping and rounds
- Chief Engineer's Standing Orders covering rounds
- Defect reports raised from rounds
10.1.4 Periodic machinery space rounds during both manned and unmanned (UMS) periods Rotational 2
Where the engine room is operated unattended (UMS) at times, do the engineers know the company requirements for rounds and monitoring both while manned and during UMS periods, and do the logs and checklists show these checks were completed?
In one lineBefore UMS we complete the checklist, select the duty engineer and inform the bridge; alarms during UMS are attended, logged and explained.
- Walk through the UMS checklist: tanks topped up, bilges dry, purifiers running normally, standby pumps on auto, fire hazards removed, doors closed, alarm system tested, duty engineer selected
- Explain that the bridge is informed when UMS starts and ends and that this is logged in both logs
- Describe how you respond to an alarm during UMS: acknowledge, inform bridge, use dead man alarm on entry, investigate, record
- State when UMS is suspended per company procedure (e.g. alarm system defect, restricted waters, bad weather, critical machinery out of order)
- Explain manned-period rounds and the final round before leaving the engine room
- UMS checklists for recent days
- Engine room log with UMS start/end times and alarm records
- Alarm printer/alarm history log
- Deck log entries for UMS hand-over
- Company SMS UMS procedure and Chief Engineer's Standing Orders
- Duty engineer roster
10.1.5 Local control of propulsion machinery Rotational 2
Do the engineers know how to operate, inspect and test the arrangements for controlling the main engine and its essential auxiliaries locally if the remote control system fails?
In one lineI can switch to engine-side control, start, reverse and change speed following the emergency telegraph; local control is tested and recorded in the PMS.
- Explain the changeover sequence from bridge to ECR to local control and what interlocks apply
- Describe how you start, reverse and change speed from the local station, and how you follow the emergency telegraph orders
- Mention local control of auxiliaries: starting generators locally, manual synchronising, local start of standby pumps
- State how often the local control is tested under the PMS and when it was last done
- Show the communication method and confirm you know where the instructions are posted
- Local control station on the main engine with posted instructions
- PMS record of local control tests
- Engine maker's operating instructions
- Emergency telegraph and sound-powered telephone
- Records of emergency/local manoeuvring drills
10.2.1 Emergency generator Core
Can the officers explain how to start the emergency generator and supply the emergency switchboard, and are there records proving it has been tested as the company procedure requires?
In one lineStarts automatically on blackout and connects in 45 s; I can start it manually by both means; weekly and on-load tests are recorded.
- Explain the automatic start: on loss of main switchboard voltage the generator starts and connects to the emergency switchboard (SOLAS allows 45 seconds)
- Describe manual start with the primary and the secondary starting means, and how you put it on the board manually if needed
- Explain how the fuel tank quick closing valve is operated and reset, and how it is tested without starving a running engine
- State the test routine: weekly run, periodic on-load test, and blackout simulation per company procedure, all logged
- Mention fuel capacity for at least 18 hours of operation (cargo ships) and that the tank is kept topped up
- Emergency generator test log / PMS records
- Starting instructions posted in the emergency generator room
- Fuel tank sounding/level gauge and quick closing valve
- Blackout test records
- Emergency switchboard and list of emergency consumers
- Starting batteries and charger condition
10.2.2 Battery emergency source of power Core
Do the engineers know the company routine for inspecting, maintaining and testing the emergency batteries, and are the batteries charged and in good condition?
In one lineBatteries are checked and logged per the PMS, kept charged and clean, and tested in blackout simulations to prove they carry emergency loads.
- Explain the routine: weekly or monthly checks of voltage, electrolyte level and specific gravity (lead-acid), terminals and charger, logged in the PMS
- Describe how the batteries take over emergency lighting and other loads during a blackout and how you simulate this in a test
- Mention safety precautions: ventilation, no smoking/naked lights, PPE for electrolyte, eye wash available
- Explain what you do with a weak cell or failing battery: report, raise a defect, replace from spares
- Battery maintenance log / PMS records
- Battery room or locker and charger
- Hydrometer, multimeter, distilled water and PPE
- Blackout simulation test record
- Warning signs and ventilation
10.2.3 Exhaust gas cleaning system (EGCS) Rotational 1
Where an exhaust gas cleaning system (scrubber) is fitted, do the engineers know the company procedures for running, calibrating and maintaining it, and are the safety and regulatory requirements being met?
In one lineWe run and calibrate the scrubber per its approved manuals; if it fails we switch to compliant fuel, record it and notify the authorities.
- Explain the operating modes fitted (open/closed/hybrid) and when each is used, including ports or areas that prohibit open-loop discharge
- Describe the calibration routine for gas analysers and washwater sensors and where it is recorded
- Explain the failure procedure: if the system cannot keep emissions compliant, change over to compliant fuel, record, and report to the flag and next port state as required under MARPOL Annex VI
- Describe inspection of the overboard valve and washwater pipe, and how leaks would be detected and reported
- Mention safe handling of caustic soda or other chemicals and residue/sludge disposal records
- EGCS technical manual and onboard monitoring manual
- EGC record book / mode change log
- Calibration certificates and records for analysers and sensors
- Continuous monitoring data display/recorder
- Records of malfunctions and notifications to authorities
- Washwater overboard valve and piping
- Chemical storage and PPE, residue discharge records
10.2.4 seawater pipelines Rotational 2
Are the seawater pipes, sea chests and seawater pumps in good condition, with no temporary repairs in place?
In one lineSeawater lines are inspected under the PMS; any defect is reported and repaired properly, and we keep no unreported temporary repairs.
- Explain how seawater system defects are reported: defect report raised in the company system, Chief Engineer informs the office, repair planned
- If a temporary repair exists, show the defect report, the office approval, any class notification and the date planned for permanent repair
- Describe routine inspection of sea chests, strainers and overboard valves under the PMS, including anode renewal and pipe thickness checks where applicable
- Show that spare pipe sections or materials are available for critical lines
- Seawater system pipework, sea chests and pumps in the engine room
- Defect reports and PMS entries for the seawater system
- Company approval for any temporary repair and class notification if required
- Pipe thickness measurement records if carried out
- Spare parts for seawater pumps and valves
10.2.5 Bilge monitoring devices Rotational 2
Do the officers know how the company requires them to test the bilge level alarms and water ingress detectors in the spaces they are responsible for, and do the records show these tests have been carried out as required?
In one lineI test the bilge alarms in my area by physically operating the float, confirm the alarm at bridge/ECR/CCR and record it in the PMS.
- Explain which bilge alarms you test and where they are (e.g. pump room bilge alarms on tankers, forward store and chain locker spaces for deck officers, engine room wells for engineers)
- Describe the physical test: lift the float or fill the bilge well until the alarm sounds, confirm indication at the bridge/ECR/CCR, then reset
- Explain how the result is recorded in the PMS or test log and who signs it
- Describe what you do with a failed sensor: defect report, repair, temporary increased monitoring
- Bilge alarm test records / PMS entries
- Alarm panels on bridge, ECR and CCR
- Bilge wells and float switches in engine room, pump room and forward spaces
- Company procedure for testing bilge alarms
- Defect reports for any faulty sensor
10.2.6 Emergency compressed air machinery starting system Rotational 2
Where an emergency air compressor and emergency air receiver are provided, do the engineers know the company procedures for running, inspecting and testing them, and is the equipment in good condition?
In one lineThe emergency compressor and receiver are tested under the PMS; I can charge the receiver and start a generator from dead ship.
- Explain the purpose: to get the first generator running from a dead-ship condition without help from outside
- Describe starting the emergency compressor (hand-crank or emergency power) and charging the emergency receiver
- Walk through starting a diesel generator from the emergency receiver and restoring main power
- State test frequency and when it was last done, and how the receiver is drained and checked
- Emergency air compressor and its starting arrangement
- Emergency air receiver, pressure gauge and drain
- PMS records of tests and maintenance
- Dead-ship start procedure posted in the engine room
- Safety valve test records
10.3.1 Switchboard deck insulation Rotational 2
Are insulating mats fitted on the deck in front of and behind the electrical switchboards, and are they in good condition?
In one lineApproved insulating mats cover the deck front and rear of every switchboard; they are kept clean, undamaged and checked during inspections.
- Explain that the mats protect people working on live equipment from electric shock
- Describe how you inspect mats during rounds and include them in PMS checks
- Confirm replacement mats are of the correct insulating grade
- Show that the area behind the switchboard is kept clear and locked or restricted as required
- Insulating mats at main and emergency switchboards
- Specification/certificate of insulating mat material if available
- Rear of switchboard area
- PMS or electrical inspection records
10.3.2 Electrical distribution system switchboard earth monitoring Rotational 2
Do the engineers understand what the insulation (earth fault) monitoring devices on the main and secondary distribution systems are for and how they are set, and are the switchboards free from significant earth faults?
In one lineOur insulation monitors are set per maker for each voltage; earth faults are logged, traced by isolating circuits and cleared promptly.
- Explain that ship systems are usually insulated (unearthed) so one earth fault does not trip the supply, but a second fault on another phase can cause a short circuit, so faults must be found quickly
- Describe how the insulation monitor reads and where the alarm set point is taken from (maker's/class settings for each voltage)
- If earth lamps are fitted, explain how to read them: a dim lamp indicates the faulty phase
- Describe tracing an earth fault by isolating circuits one by one with permission and recording the result
- Give the current reading and confirm any fault found is logged and followed up
- Insulation monitoring meters/earth lamps on main and emergency switchboards
- Maker's settings for alarm points
- Earth fault log / engine log entries
- Defect reports for earth faults
- Insulation resistance test records (megger) for motors
10.3.3 Entry into the machinery space during UMS Rotational 2
When the engine room is unmanned (UMS), do the engineers know the company rules for entering it safely, including how the dead man alarm works and is tested, where one is fitted?
In one lineInform the bridge, switch on the dead man alarm and reset it within the interval; inform the bridge again when leaving. It is tested regularly.
- Explain that before entering during UMS you call the bridge, give your name and reason, and switch on the dead man alarm
- State the reset interval used on board (commonly no more than 30 minutes, per company procedure) and what happens if it is not reset: pre-warning, then alarm to bridge and engineers
- Describe what the bridge does if the alarm escalates: call the engineer, raise the general alarm or send a search party per procedure
- Explain that you call the bridge again on leaving and switch the dead man alarm off
- Mention test frequency of the dead man alarm and where it is recorded
- Dead man alarm panel and reset points
- Company procedure for UMS entry
- Dead man alarm test records
- Bridge log or UMS entry log
- Notices at engine room entrance
10.3.4 Engineers' alarm Rotational 2
Do the engineers know how the engineers' alarm works, and is it working properly, tested at regular intervals with each test recorded?
In one lineActivated from the ECR to summon all engineers urgently; tested regularly so it is heard in every cabin, and each test is recorded.
- Explain that the engineers' alarm is required by SOLAS II-1 and is sounded from the engine control room or manoeuvring platform to summon engineers urgently
- Describe when you would use it: fire, flooding, serious machinery failure, or if the watchkeeper is in difficulty
- Explain how you test it: with prior notice, activate and confirm it is heard in every engineer's cabin and mess, then record
- State the test frequency per company procedure and when it was last tested
- Engineers' alarm push button in ECR/engine room
- Alarm bells/sounders in engineers' cabins and mess
- Test records in the PMS or log book
- Company procedure covering the alarm
10.3.5 Machinery alarm Rotational 2
On a ship with an unattended machinery space, do the engineers know how the machinery alarm system and its extensions work, and is it in good order, tested regularly with results recorded?
In one lineAlarms go to the ECR, bridge and duty engineer, escalating if not acknowledged; we test them under the PMS and control every inhibited alarm.
- Explain how an alarm reaches the duty engineer: ECR panel, cabin/mess extension panel, and the bridge, and what happens if it is not acknowledged
- Describe how you select the duty engineer and confirm it with the bridge
- Explain the test routine: alarm system function tests and sensor tests rotated under the PMS
- Describe how inhibited or blocked alarms are controlled: only with Chief Engineer approval, logged and reinstated
- Alarm and monitoring system in the ECR
- Alarm extension panels in cabins and on the bridge
- Alarm test records and PMS
- Alarm history/printer logs
- Record of inhibited alarms
10.3.6 Watertight doors Rotational 2
Do the Master and officers know the company procedures for operating, inspecting and regularly testing the watertight doors, and are the doors in good condition?
In one lineWatertight doors are kept closed at sea, tested and inspected regularly, and I can operate them remotely and locally, including with the hand pump.
- Explain where the watertight doors are and which must be kept closed at sea
- Describe local operation: control lever on both sides, hand pump in case of power failure, and warning alarms or lights while closing
- Describe remote closing from the bridge and the status indication
- State the test and inspection routine (seals, hydraulic oil level, indicators) and where it is recorded
- Mention the danger of being trapped by a closing power-operated door and the safe way to pass through
- Watertight doors and local controls
- Bridge indication panel
- Operating instructions posted at each door
- Test and maintenance records in the PMS
- Hydraulic hand pump and oil level
10.3.7 Gas welding and cutting equipment Rotational 2
Is the oxy-acetylene (gas) welding and cutting gear in good condition, and are spare oxygen and acetylene cylinders stored separately in a well-ventilated place outside the accommodation and engine room?
In one lineArrestors fitted and hoses checked; spare oxygen and acetylene stored apart, secured, on deck or in a ventilated store outside ER and accommodation.
- Show the flashback arrestors and explain they prevent flame travelling back into the hoses and cylinders
- Explain the inspection routine for hoses, regulators and arrestors under the PMS and their replacement intervals
- Explain storage: oxygen and acetylene cylinders stored apart, upright, secured, out of the sun, in a ventilated location outside the engine room and accommodation
- Describe hot work permit, closing cylinder valves after use and venting the hoses
- Gas welding station with regulators, arrestors and hoses
- Cylinder storage location and signage
- PMS records for welding equipment checks
- Hot work permits
- Fire extinguisher at the welding station
10.3.8 Electric welding equipment Rotational 2
Do the engineers and engine ratings know the safety precautions for electric arc welding, are these precautions displayed at the welding location, and is the welding equipment in good condition?
In one lineDry PPE, insulated holder, return clamp close to the job, hot work permit and fire watch; precautions are posted at the welding machine.
- Explain the precautions: dry PPE, insulated holder, return lead clamped as close as possible to the job, never use ship structure or pipes as return path away from the job
- Describe hot work outside the workshop: permit, gas test where required, fire watch, extinguisher, remove combustibles, ventilation
- Explain that the machine is switched off and the electrode removed when not in use
- Describe the inspection of cables and holder before use and how defects are reported
- Welding machine, cables, holder and return clamp
- Posted electric welding safety precautions
- PPE locker with gloves, masks and aprons
- Hot work permits
- PMS inspection records for welding equipment
10.4.1 Planned maintenance system (PMS) Rotational 1
Do the officers responsible know how the company wants the planned maintenance system run and used, and does the system hold an accurate, up-to-date record of the maintenance done on board and of spare parts?
In one lineEvery job, part used and running hour goes into the PMS; overdue or deferred jobs need office approval; critical spares stay above minimum.
- Demonstrate how you close a job in the PMS: work done, running hours, parts used, remarks, and attach readings or photos where required
- Explain how overdue or deferred jobs are handled: request to the office, approval recorded before the due date
- Explain how a defect is raised and linked to an unplanned work order
- Show how spare parts are deducted when used and how critical spares are kept at minimum levels
- Deck officers: show your own deck jobs (LSA/FFA, mooring, cranes) and how you record them
- Planned maintenance system (computer or paper) with job history
- Overdue and deferred job lists with office approvals
- Defect reporting records
- Critical equipment list and critical spare parts inventory
- Company SMS procedure for the PMS and the software user manual
- Running hours records
10.4.2 Lube oil and hydraulic oil analysis program Rotational 2
Is the ship enrolled in a shore laboratory programme that analyses its lubricating and hydraulic oils, and is there a procedure for acting on the results and the trends the analysis shows?
In one lineOil samples are taken on schedule from all main systems; every report is reviewed, trended and abnormal results are acted on and recorded.
- Explain the sampling frequency per company procedure for each machine (e.g. main engine system oil typically every three months) and where the schedule is kept
- Describe how you take a representative sample: running machine, from the designated point, after flushing the line, clean labelled bottle
- Walk the inspector through a recent report and the trend graph and explain the follow-up for any warning
- Describe actions on an abnormal result: re-sample, purify or renew the oil, investigate the source (e.g. cooler leak), report to the office
- Oil analysis reports and trend charts
- Sampling schedule in the PMS
- Records of actions taken on abnormal results
- Sampling kits and labels
- Company procedure for lube oil analysis
10.5.1 Conventional bunkering operations Rotational 1
Are the Master, Chief Engineer and the officers and ratings taking part in bunkering familiar with how the company requires fuel to be loaded, and do the records show that bunkering was planned and carried out as the procedure requires?
In one lineEvery bunkering has a signed plan and checklist; I know my duty, the tank limits and how to stop the transfer on any leak.
- Explain your duty during bunkering (e.g. manifold watch, sounding tanks, controlling valves) and how you communicate with the person in charge
- Walk through the bunker plan: which tanks, ullage limits, line-up, topping-off rate, and when the rate is reduced
- Describe pollution precautions and what you do on an overflow or leak: stop pumping, close valves, raise alarm, start SOPEP response
- Explain the paperwork: pre-transfer checklist, sounding records, Oil Record Book entry and the bunker delivery note
- State that only those briefed on the plan take part and that the plan is signed by them
- Bunker plans and pre-bunkering meeting records for recent operations
- Bunker checklists (pre-transfer and during transfer)
- Sounding/ullage records
- Oil Record Book Part I bunkering entries
- Bunker delivery notes
- Company bunkering procedure
- SOPEP locker and manifold drip trays
10.5.2 Bunker fuel oil sampling and analysis Rotational 2
Do the engineers know the company procedures for sampling and testing bunker fuel, and do records show that samples were taken and kept or sent for analysis as required?
In one lineSamples are drip-taken at our manifold throughout delivery, sealed and logged; MARPOL sample kept 12 months and analysis results acted on before use.
- Explain the sampling method: drip sampler at the ship's manifold, sample taken throughout the delivery, witnessed by supplier and ship
- Describe how the samples are divided, sealed and labelled, and who keeps which sample
- Explain retention: MARPOL sample kept on board at least 12 months; bunker delivery note kept for three years
- Describe what happens when the lab report raises a concern: keep fuel segregated, inform the office, follow lab advice on treatment or debunkering, issue notice of protest if needed
- Mention in-use and on-board sampling points used for sulphur verification
- Fuel sample locker with retained samples
- Sample log/register
- Bunker delivery notes
- Fuel analysis reports
- Company fuel sampling procedure
- Designated sampling points for in-use fuel
10.5.3 Fuel change over procedures Rotational 2
Do the Chief Engineer and senior engineers know both the company and the ship-specific procedures for changing over fuel grades, and do the records show changeovers were done in line with those procedures and MARPOL?
In one lineWe calculate start time so the system is flushed before the ECA; date, time, position and tank volumes are logged per MARPOL Annex VI.
- Explain how you calculate when to start the changeover so the system is fully flushed before the ECA boundary
- Describe the steps: inform bridge, change service tank, control temperature rate of change per engine maker, monitor viscosity, check for leaks
- Explain the records required by MARPOL Annex VI: date, time, ship's position and volume of compliant fuel in each tank, entered in the prescribed log
- Mention cylinder oil selection to match the fuel sulphur content and the risk of fuel incompatibility
- Show that the bridge records match the engine room records
- Fuel changeover procedure and calculation sheet
- Fuel changeover log / engine log entries
- Deck log showing positions
- Bunker delivery notes for compliant fuel
- Fuel analysis reports
- Engine maker's guidance on changeover
10.6.1 LNG fuel tank water-spray system Rotational 2
On a ship that burns LNG as fuel, do the Master and officers know where the fuel tank water-spray system is, what it is for and how to operate it for cooling and fire protection on deck, and is it in good working order and regularly inspected, tested and maintained?
In one lineThe water spray cools and protects the LNG fuel tank; I can start the pumps, set and drain the valves; tests are recorded.
- Explain that the spray system cools the tank and protects it and adjacent structure from heat radiation in a fire, as required by the IGF Code for fuel tanks on open deck
- Describe how you start the pumps locally and remotely and open the section valves
- Point out the isolating and stop valves and explain the drain points used to empty the deck lines and prevent freezing or corrosion
- Describe the test routine, how blocked nozzles are found and cleared, and where it is recorded
- Water spray system piping, nozzles and valves around the LNG fuel tank
- Fire pump/water spray pump start positions
- Fire control plan showing the system
- Test and maintenance records in the PMS
- System operating instructions
10.6.2 LNG gas fuel bunkering ESD system Rotational 1
Do the Chief Engineer and the officers and ratings involved in bunkering LNG or a similar low-flashpoint fuel understand how the ship's bunkering emergency shutdown (ESD) system works, and is it in good order and regularly inspected, tested and maintained?
In one linePress the ESD for any leak, fire, gas alarm or unsafe situation; it is tested with the supplier before every bunkering and closing times recorded.
- Explain when the ESD must be used: any leak, fire, gas detection, uncontrolled movement of the supplier, loss of communication, or any unsafe situation
- Point out ESD push button locations at the bunker station, control station and bridge
- Describe the automatic triggers and what the ESD closes (bunker valves, supplier's pumps via the link)
- Explain the pre-bunkering ESD test with the supplier and how closing times are checked and recorded
- ESD push buttons and bunkering valves
- ESD link connection (pneumatic, electric, fibre-optic)
- ESD test records and valve closure time records
- LNG bunkering procedure and checklist
- Cause and effect matrix for the ESD system
10.6.3 LNG (or other low-flashpoint fuel) bunkering procedures Rotational 1
Are the Chief Engineer and the officers and ratings who take part in bunkering LNG or another low-flashpoint fuel familiar with the company procedures for it, and do the records show these operations were planned and carried out as required?
In one lineSigned plan and checklist every time; ESD tested, connection purged and leak tested, tank pressure monitored, safety zone enforced.
- Explain your duty during LNG bunkering and the PPE required (cryogenic gloves, face shield, protective clothing)
- Walk through the sequence: compatibility check, pre-bunkering meeting, checklist, ESD test, inerting and leak test of the connection, cooldown, transfer, draining and purging
- Describe tank pressure and level monitoring and the maximum filling limit
- Explain the safety zone: no unauthorised persons, no ignition sources, gas detection running
- Describe the action on leakage: ESD, water curtain running, evacuate, inform the bridge
- LNG bunkering procedure and plan
- Completed bunker checklist
- Bunkering records: pressures, temperatures, quantities
- Training certificates for gas-fuel operations
- PPE for cryogenic operations
- Records of hose/connection leak test and purging
10.6.4 LNG fuel bunkering control station and manifold Rotational 2
Are the safety arrangements at the LNG fuel bunkering control station and at the bunkering manifold in good condition?
In one lineThe LNG bunker station has working drip trays, water curtain, gas detection, ESD and fire-fighting equipment, all tested before bunkering and recorded.
- Show the manifold safety equipment and explain its purpose: drip tray for cryogenic spills, water curtain to protect steel from embrittlement
- Explain the readiness checks before bunkering: water curtain running, gas detectors tested, ESD tested, fire-fighting equipment in place
- Describe how the control station monitors tank level, pressure and temperature during bunkering
- Mention the remote emergency stops for fuel and lube oil pumps and the quick closing valves, and how they are tested, if asked
- Bunkering manifold with drip trays and water curtain
- Bunkering control station panels
- Gas and fire detection test records
- Fire extinguishers and dry powder system at the station
- PMS records for bunkering equipment
- Signage and safety zone markings
10.7.1 Remote controls for fuel and lube oil system valves Rotational 1
Do the Master and officers know where the remote controls for the valves on fuel and lube oil systems, the emergency stops for fuel and lube oil pumps and the quick closing valves on oil tanks are, what they are for, and how they are tested and operated, and do the systems work properly?
In one lineThe pump stops and QCV controls are outside the engine room; they cut fuel and lube oil in a fire, are labelled and tested regularly.
- Explain that in an engine room fire the fuel and lube oil supply must be stopped from outside the space, as required by SOLAS II-2
- Point out the remote stop panel for pumps and fans and the QCV control station, and explain which valves each control closes
- Describe how the QCV is operated (air or wire pull) and how it is reset locally after operation
- Explain the test routine: QCV tested in rotation without tripping running machinery, results recorded
- Remote stop panel for fuel and lube oil pumps and ventilation
- Quick closing valve control station and air receiver
- QCV and remote stop test records
- Fire control plan showing locations
- Labelling of each control
10.7.2 Fire prevention in machinery spaces - hot surfaces and oil spray Rotational 1
Do the Master and officers know the measures in place to prevent fuel or other flammable liquid spraying onto hot surfaces and causing an engine room fire, and are these protective measures regularly inspected and kept in good condition?
In one lineHot surfaces are insulated, HP fuel pipes are jacketed with leak alarms, flanges have spray protection, and leaks are fixed and cleaned immediately.
- Explain the main measures: insulation of surfaces above 220 °C, double-walled high-pressure fuel pipes, spray protection on flanged joints, and prompt cleaning of oil leaks
- Describe how you test the fuel leakage alarm: fill the leak detection tank or lift the float until the alarm sounds, then reset and record
- Explain that removed insulation must be replaced after maintenance and that oil-soaked lagging is renewed
- Mention reference guidance such as IMO MSC.1/Circ.1321 on preventing engine room fires, if relevant
- Describe what you do if you find a leak: report, isolate, clean up and repair
- Insulated hot surfaces on main engine, generators and boilers
- High-pressure fuel pipe leakage alarm and collection tank
- Anti-splash tape/spray shields on flanges
- Leakage alarm test records
- Thermographic survey report (if done)
- PMS records for insulation inspection
10.7.3 Main engine crank case monitoring Rotational 2
Are the oil mist detectors on the main engine crankcase, the bearing temperature monitoring or equivalent devices, and their alarms working properly?
In one lineOMD tested with the maker's kit and logged; on alarm: slow down, inform bridge, stop safely, keep clear until the crankcase cools.
- Explain that oil mist detectors (or bearing temperature monitors) are required for larger engines under SOLAS II-1 to detect overheating before a crankcase explosion
- Describe the test method using the maker's test kit or test function and where it is recorded
- Explain the action on alarm: reduce speed/slow down, inform the bridge, stop the engine when safe, keep everyone away from crankcase relief doors, do not open the crankcase until it has cooled per maker's instructions
- Describe checking for causes after cooling: bearings, piston rings, blow-by, lube oil supply
- Oil mist detector panel in the ECR and sensors on the engine
- Test kit and maker's instructions
- Test records in the PMS
- Alarm/slow-down test records
- Crankcase relief doors
10.7.4 Hydraulic power packs fire protection measures Rotational 2
If hydraulic power packs are installed in the main engine room, are there fire protection measures for them, and are those measures in good condition?
In one lineOur hydraulic power packs are shielded, covered by detection and fire protection, checked for leaks every round and their alarms are tested.
- Explain the risks: high-pressure hydraulic oil spraying onto hot surfaces
- Describe the protection fitted: enclosure, spray shields, fire detection and any local application water mist covering the unit
- Explain how leaks are monitored: daily rounds, tank level checks, drip tray inspection, level/leak alarm
- Describe how you test the level alarm or leak detection of an enclosed power pack and record it
- Show hydraulic hose renewal records
- Hydraulic power packs and their enclosures
- Local fire detection and fire-fighting arrangements
- Level alarm/leak detection test records
- Hydraulic hose renewal records
- PMS maintenance records
An independent guide written by seafarers for seafarers. It is not affiliated with or endorsed by OCIMF and does not reproduce the SIRE 2.0 Question Library: questions are put in our own words. The official library and guidance are published by OCIMF (ocimf.org). Always follow your company's SMS.