10.4.1 Planned maintenance system (PMS)
Rotational 1ChemicalLNGLPGOilAsked to: Chief Officer, 2nd / 3rd Officer, Chief Engineer, Engineer officersWhere: Cargo Control Room, Chief Engineer's Office, Engine Control Room
Do the officers responsible know how the company wants the planned maintenance system run and used, and does the system hold an accurate, up-to-date record of the maintenance done on board and of spare parts?
In one lineEvery job, part used and running hour goes into the PMS; overdue or deferred jobs need office approval; critical spares stay above minimum.
How to answer
- Demonstrate how you close a job in the PMS: work done, running hours, parts used, remarks, and attach readings or photos where required
- Explain how overdue or deferred jobs are handled: request to the office, approval recorded before the due date
- Explain how a defect is raised and linked to an unplanned work order
- Show how spare parts are deducted when used and how critical spares are kept at minimum levels
- Deck officers: show your own deck jobs (LSA/FFA, mooring, cranes) and how you record them
What the inspector looks for
- Officers can open the PMS and record a completed job, including unplanned work
- No overdue jobs beyond the allowed grace period without documented shore approval
- Deferred jobs approved by the office
- Defects in the defect reporting system also have corresponding PMS work orders
- All safety-critical equipment included in the PMS
- Critical spare parts inventory matching actual stock and minimum levels
Have ready to show
- Planned maintenance system (computer or paper) with job history
- Overdue and deferred job lists with office approvals
- Defect reporting records
- Critical equipment list and critical spare parts inventory
- Company SMS procedure for the PMS and the software user manual
- Running hours records
Avoid
- Overdue jobs with no shore approval
- Junior officers unable to record a job in the PMS
- Spare parts stock in the system not matching the store
- Defects recorded but no corrective work order raised
Practise in the interview trainer All questions