10.5.1 Conventional bunkering operations

Rotational 1ChemicalLNGLPGOilAsked to: Chief Engineer, Engineer officers, RatingsWhere: Chief Engineer's Office, Engine Control Room, Engine Room

Are the Master, Chief Engineer and the officers and ratings taking part in bunkering familiar with how the company requires fuel to be loaded, and do the records show that bunkering was planned and carried out as the procedure requires?

In one lineEvery bunkering has a signed plan and checklist; I know my duty, the tank limits and how to stop the transfer on any leak.

How to answer

  • Explain your duty during bunkering (e.g. manifold watch, sounding tanks, controlling valves) and how you communicate with the person in charge
  • Walk through the bunker plan: which tanks, ullage limits, line-up, topping-off rate, and when the rate is reduced
  • Describe pollution precautions and what you do on an overflow or leak: stop pumping, close valves, raise alarm, start SOPEP response
  • Explain the paperwork: pre-transfer checklist, sounding records, Oil Record Book entry and the bunker delivery note
  • State that only those briefed on the plan take part and that the plan is signed by them

What the inspector looks for

  • Written bunker plan for each operation: tanks, quantities, maximum fill (e.g. 85-90 %), sequence, rates, line-up
  • Pre-transfer checklist completed and agreed with the supplier
  • Duties allocated and understood: person in charge, manifold watch, sounding team
  • Pollution precautions: scuppers plugged, drip trays empty, SOPEP gear at hand, communications tested
  • Records: soundings, Oil Record Book Part I entries, bunker delivery note

Have ready to show

  • Bunker plans and pre-bunkering meeting records for recent operations
  • Bunker checklists (pre-transfer and during transfer)
  • Sounding/ullage records
  • Oil Record Book Part I bunkering entries
  • Bunker delivery notes
  • Company bunkering procedure
  • SOPEP locker and manifold drip trays

Avoid

  • No written plan or plan not signed by those involved
  • Tanks planned above the company maximum fill
  • Crew unaware of their duties or emergency stop arrangements
  • Missing Oil Record Book entries