SeaVint

10.1.2 Testing main propulsion, steering gear, thrusters & power generation plant

Rotational 1ChemicalLNGLPGOilAsked to: Chief Engineer, Engineer officersWhere: Engine Control Room, Steering Gear

Do the Chief Engineer and engineers know the company routine for testing the main engine, steering gear, thrusters and generators before they are needed and at critical stages of a voyage or operation, and are the related checklists and log entries filled in properly?

In one lineWe test steering, main engine, thrusters and generators before departure and arrival using checklists; entries in both logs match and I can steer locally.

How to answer

  • Walk the inspector through the pre-departure checklist: steering gear full-travel test on each pump, ME ahead/astern on air and fuel, thrusters, second generator on line
  • Explain the critical points where checks are repeated: before port entry, pilot boarding, narrow channels, STS or SBM operations, entering ECA
  • Describe how you change to local steering: communication with the bridge, select local, operate solenoid push buttons or the trick wheel, watch the rudder angle indicator
  • Mention that emergency steering drills are done at least every three months and logged
  • Show that the bridge and engine room log entries for the tests match in time

What the inspector looks for

  • Pre-departure and pre-arrival checklists completed, timed and signed
  • Steering gear tested within 12 hours before departure (SOLAS V/26), including both pumps/units, rudder angle indicator and alarms
  • Ahead/astern tests of the main engine and thruster tests recorded in the deck and engine logs
  • Standby generator readiness before manoeuvring, narrow waters and cargo operations
  • Engineers can explain local/emergency steering and the changeover procedure

Have ready to show

  • Pre-departure / pre-arrival engine room checklists
  • Steering gear test records and emergency steering drill records
  • Engine room and deck log books with test entries
  • Steering gear change-over diagram and emergency steering instructions posted in the steering gear room
  • Thruster test records (if fitted)
  • Company SMS procedure for testing propulsion and power generation

Avoid

  • Checklists ticked in advance or without times and signatures
  • Log entries in deck and engine logs that do not agree
  • Engineers unfamiliar with local/emergency steering operation
  • Missing or faded change-over instructions in the steering gear room

Practise in the interview trainer All questions

An independent guide written by seafarers for seafarers. It is not affiliated with or endorsed by OCIMF and does not reproduce the SIRE 2.0 Question Library: questions are put in our own words. The official library and guidance are published by OCIMF (ocimf.org). Always follow your company's SMS.