5.1.19 OBO Forward space emergency pumping arrangements
Rotational 2OilWhere: Bridge, Engine Control Room, Forecastle, Interview - Deck OfficerOnly if it applies to the ship
On combination carriers (OBO), do the Master and officers know the emergency means of pumping out flooded spaces ahead of the collision bulkhead, and are these arrangements clearly marked and in good working order?
In one lineI can explain and operate the forward space dewatering sequence; valves are marked, alarms work and the system is tested.
How to answer
- Explain how the forward spaces are dewatered and from where the system is controlled
- Walk through the sequence: open the correct suction and overboard valves, start the pump (or eductor), confirm suction, monitor levels
- Show the markings and posted instructions at the control position
- Explain the water ingress detection alarms and their testing
- State when the system was last tested
What the inspector looks for
- Knowledge of the dewatering system for forward spaces (as required for bulk carriers under SOLAS XII)
- Valve operating sequence and pump starting procedure
- Clear marking of controls, valves and instructions
- Water ingress alarms for forward spaces
- Maintenance and test records
Have ready to show
- Operating instructions for forward space dewatering
- Marked valves and controls
- Pump/valve test records in the PMS
- Water ingress alarm test records
- Piping diagram
Avoid
- Unmarked or seized valves
- Officers unable to describe the operating sequence
- No record of the system being tested
- Water ingress alarms faulty
Practise in the interview trainer All questions
An independent guide written by seafarers for seafarers. It is not affiliated with or endorsed by OCIMF and does not reproduce the SIRE 2.0 Question Library: questions are put in our own words. The official library and guidance are published by OCIMF (ocimf.org). Always follow your company's SMS.