11.1.21 Aft emergency towing equipment deployment system
CoreChemicalLNGLPGOilWhere: Aft Mooring Deck
Does the operator's submitted photograph No. 21 (the aft emergency towing deployment arrangement) match what the inspector actually sees on board on the day, and is that area free from anything of concern?
In one lineThe aft towing gear deploys as described in the ship's procedure; route clear, release free and drills recorded.
How to answer
- Before the inspection, stand at the same viewpoint as the submitted photo and compare it with the area today
- Explain how the aft towing gear is deployed: release, run the messenger, pick-up line passed to the towing vessel
- Show the drill or deployment exercise records
- If the area has changed since the photo (repairs, new coating, equipment replaced), explain the change and show the record
What the inspector looks for
- Whether the submitted photo is a true, current picture of the area
- Deployment route clear, fairlead and strongpoint in good order
- Release mechanism or drum free to operate
- Instructions for deployment posted
- Crew familiarity and drill records
Have ready to show
- The submitted photograph and the same viewpoint on board
- Emergency towing booklet / procedure
- Drill records
- PMS records of strongpoint and fairlead inspection
Avoid
- A photo that shows a better condition than the area actually has on the day
- Deployment route obstructed
- Seized release gear
Practise in the interview trainer All questions
An independent guide written by seafarers for seafarers. It is not affiliated with or endorsed by OCIMF and does not reproduce the SIRE 2.0 Question Library: questions are put in our own words. The official library and guidance are published by OCIMF (ocimf.org). Always follow your company's SMS.