12.4.1 Cargo and ballast systems in sub-zero temperatures

Rotational 2ChemicalLNGLPGOilAsked to: Master, Chief Officer, 2nd / 3rd OfficerWhere: Cargo Control Room, Compressor Room, Main Deck, PumproomOnly if it applies to the ship

Do the Master and officers know the company procedures for keeping cargo and ballast systems working in sub-zero temperatures, and are these procedures followed?

In one lineKeep ballast, vents, P/V valves and deck seal ice-free, drain deck lines and water spray, and record the cold-weather checks.

How to answer

  • Explain how ballast is kept from freezing (heating coils or circulation, avoiding partly filled tanks at the waterline in ice, checking air pipe heads and vents) and how this fits with the BWMS
  • Explain how often P/V valves and vents are checked and de-iced, and why a frozen P/V valve is a risk to the tank structure
  • Describe how deck lines are drained after cargo or ballast operations, and how valve actuators are kept working
  • For oil and chemical tankers, explain how the deck seal is heated; for gas carriers, explain the water spray drain-down and the checks on cargo valves and relief valves for icing

What the inspector looks for

  • Ballast tanks and lines protected from freezing by heating, circulation or keeping tanks pressed up or empty, with air pipes and sounding pipes clear
  • P/V valves, vent masts, flame screens and level gauge heads checked and kept free of ice
  • Deck cargo and ballast lines drained after use; hydraulic valve actuators using low-temperature oil
  • On tankers with inert gas, the deck water seal protected against freezing; on gas carriers, the water spray system drained and the compressor room kept heated
  • A cold-weather checklist or log showing checks were done

Have ready to show

  • Cold-weather checklist
  • Ballast system drawing and heating arrangement
  • P/V valve inspection records
  • Deck seal heating arrangement
  • PWOM cargo and ballast sections

Avoid

  • Frozen P/V valves, vents or air pipes
  • Ballast tanks or lines frozen
  • Deck lines not drained after use
  • Deck seal or water spray system frozen

Practise in the interview trainer All questions