SeaVint

Chapter 6. Pollution prevention

16 questions with how to answer each.

6.1.1 Cargo Record Book Rotational 2

On chemical tankers, and gas carriers certified for noxious liquid substances, do the Master and officers know how the company wants the Cargo Record Book kept, and do its entries correctly cover every cargo operation that MARPOL Annex II requires to be logged?

In one lineRecord every Annex II cargo operation promptly with the correct code; officer signs each entry, Master each page; entries match cargo documents.

How to answer
  • List the operations you record: loading, internal transfer, unloading, mandatory prewash, cleaning and ventilation of tanks, discharge of tank washings, ballasting and deballasting of cargo tanks, accidental discharges, and control by authorised surveyors
  • Explain that the officer in charge of the operation makes and signs the entry straight after the operation, and the Master signs each completed page
  • Walk the inspector through a recent discharge and prewash, from the cargo pollution category and the stripping result to the reception facility receipt and the surveyor endorsement
  • Explain how you correct a mistake: strike through with a single line so the original stays legible, then sign and date the correction. Never tear out pages or use correction fluid
  • State the retention period (three years from the last entry) and that the book stays readily available for inspection on board
Have ready
  • Cargo Record Book (current and previous books)
  • Procedures and Arrangements (P&A) Manual
  • Prewash and exemption endorsements by surveyors; reception facility receipts
  • Cargo documents, ullage reports and stripping test records
  • Tank cleaning log or cleaning plans
  • The company SMS procedure on record books

6.1.2 Oil Record Book Part II Rotational 2

Are the Master and officers familiar with how the company wants ORB Part II maintained, and does the book accurately show every cargo and ballast operation that MARPOL Annex I requires to be logged?

In one lineEach cargo, ballast, cleaning and slop operation is entered with the correct code, cross-checks with the ODME and ullage records, and is signed.

How to answer
  • Explain which operations you record and use the code list printed in the book to show you know where each type of entry goes
  • Walk the inspector through a recent slop tank decant: settling time, interface detection, the ODME start and stop times, the total quantity discharged and the position
  • Explain that the officer who carried out the operation writes and signs the entry the same day, and the Master countersigns each completed page
  • Describe how you record an ODME failure or an exceptional discharge, and who you notify
  • Mention the three-year retention period and that the book is kept in the cargo control room or the Master's office
Have ready
  • Oil Record Book Part II (current and previous)
  • ODME printouts and records for the last three years
  • Ullage, OBQ/ROB and slop tank reports
  • COW records and the COW manual (crude carriers)
  • Reception facility receipts for slops
  • The company SMS procedure on record books

6.1.3 Oil Record Book Part I Rotational 2

Do the Master and engineers know how the company wants the Oil Record Book Part I kept, and does it correctly show the machinery space operations, such as sludge, bilge, bunkering and fuel tank ballasting, that MARPOL Annex I requires to be recorded?

In one lineEvery machinery space oil operation is recorded with the right code, tank names match the IOPP Supplement, and quantities balance with soundings and receipts.

How to answer
  • Explain the main codes and give an example of each, such as the weekly sludge retention, an OWS discharge, a transfer between bilge tanks and a bunkering operation
  • Show that the tank names and capacities you use are exactly those in the IOPP Supplement
  • Explain that you follow the IMO guidance on ORB Part I entries and the company procedure, including how evaporation of water from sludge tanks is recorded
  • Explain that you record OWS failures and repairs, and land residues ashore when the OWS is out of service
  • Explain how corrections are made and that the Chief Engineer reviews the book before the Master signs each page
Have ready
  • Oil Record Book Part I (current and previous; three years on board)
  • IOPP Certificate and Supplement (Form A or B)
  • Sludge and bilge tank sounding records
  • Reception facility receipts and bunker delivery notes
  • OWS and 15 ppm alarm records and the alarm calibration certificate
  • The company SMS procedure and IMO guidance on ORB entries

6.1.4 Garbage Record Book Rotational 2

Do the Master and officers keep the Garbage Record Book in line with the Garbage Management Plan and company procedure, and does it correctly record all the garbage handling that MARPOL Annex V requires, such as landing ashore, incineration, permitted discharges and accidental losses?

In one lineGarbage is segregated by category as per the GMP, every disposal is logged with position and quantity, and hazardous items are landed ashore.

How to answer
  • Explain the segregation used on board: colour-coded or labelled bins by category, and where each category goes
  • Explain that aerosols, batteries, fluorescent tubes, medical waste and oily rags are stored separately as hazardous waste or e-waste and landed ashore. They are never incinerated or thrown overboard
  • State the sea discharge rules: no plastics, cooking oil or incinerator ash ever; food waste only en route and at the minimum distance from land (further inside special areas); and nothing at all in Arctic or Antarctic waters except as the Polar Code allows
  • Explain that the officer in charge records each operation with position and quantity, and that the Master signs each completed page
  • Name the designated person in charge of the GMP and explain how the garbage stores are checked
Have ready
  • Garbage Record Book (two years of records on board)
  • Garbage Management Plan
  • Garbage placards posted in the galley, mess rooms, bridge and on deck
  • Reception facility receipts
  • Segregated, labelled bins and the garbage store
  • Incinerator log, if one is fitted

6.1.5 Ozone Depleting Substances Record Book Rotational 1

Do the Master and engineers know the company procedure for keeping the Ozone-depleting Substances Record Book, whether paper or electronic, and does it correctly log every recharge, repair, release and landing of these substances as MARPOL Annex VI requires?

In one lineEvery recharge, repair, leak and landing of ODS is logged in kg, and the equipment list matches the IAPP Supplement.

How to answer
  • Name the systems on board that contain ODS, such as the provision plant or AC with R22, and any halon or other ODS fire systems, and state that they agree with the IAPP Supplement
  • Explain that every top-up is entered with the quantity and the reason, and that repeated top-ups trigger leak detection and repair
  • Explain that recovered gas is collected in cylinders and landed ashore with a receipt. Deliberate venting to the atmosphere is prohibited
  • Explain that new installations containing ODS are not permitted, and that replacement gases must be handled under the maker's procedures
  • Explain who makes the entries and who countersigns them, following the company procedure and any flag guidance
Have ready
  • ODS Record Book
  • IAPP Certificate and Supplement (the ODS equipment list)
  • Refrigerant stock and cylinder records, and landing receipts
  • PMS records of refrigeration and AC maintenance
  • The company SMS procedure

6.1.6 MARPOL Annex VI NOx Compliance and Record Keeping Rotational 1

Are the documents and records needed to show compliance with MARPOL Annex VI Regulation 13 on NOx emissions complete and correct, including those for any NOx abatement equipment fitted?

In one lineEach engine has its EIAPP certificate, Technical File and parameter records up to date, and Tier III operation and failures are recorded and reported.

How to answer
  • Explain which engines are covered, their Tier, and where the EIAPP certificates and Technical Files are kept
  • Explain how the Record Book of Engine Parameters is updated when parts such as injectors, nozzles or turbocharger components are replaced
  • Where SCR or EGR is fitted, describe in simple terms how it works, the reductant (urea) system, and the checks you make before entering a NOx ECA
  • Explain what you do if the abatement system fails and cannot be fixed quickly: inform the Master and the company, record the failure, report to the flag and to the port State as required, and follow the company and flag guidance
  • Explain how catalyst condition is monitored according to the maker's instructions, for example NOx readings, pressure drop across the reactor, and inspection or sample results
Have ready
  • EIAPP certificates and NOx Technical Files
  • Record Book of Engine Parameters
  • IAPP Certificate and Supplement
  • Tier changeover log entries for NOx ECAs
  • SCR or EGR operating manual, monitoring records and reductant consumption records
  • The company procedure for NOx abatement failure

6.2.1 Flooding or accidental leakage of cargo pumproom bilges Rotational 2

On tankers with a cargo pumproom, do the Master and officers know how to pump out the pumproom bilges after flooding or a cargo leak, and is that equipment in working order?

In one linePumproom bilges can be pumped to the slop tank using remote-operated controls from outside the space, and the bilge alarms are tested and recorded.

How to answer
  • Explain how bilges are pumped out with the stripping pump, eductor or dedicated bilge pump into the slop tank, and how the line-up is made
  • Point out the remote controls for the bilge pump and the suction and discharge valves, on deck or in the CCR, so the system can be used without entering a flooded or gas-filled pumproom
  • Explain the pumproom bilge high level alarm, where it sounds, and how and how often you test it
  • Explain that if the pumproom floods with cargo you treat it as an emergency: raise the alarm, stop cargo operations, ventilate and gas test before entry, and follow the emergency plan
  • Explain that pumproom bilge contents are recorded in the ORB Part II when transferred to the slop tank
Have ready
  • Pumproom bilge system drawing and the remote operating positions
  • Bilge alarm test records
  • PMS records for the bilge pump or eductor and the valves
  • Pumproom entry checklist and gas detection records
  • ORB Part II entries for bilge transfers

6.2.2 Cargo system overboard and sea suction valves Rotational 2

Before any cargo transfer, are the overboard discharge and sea suction valves connected to the cargo system confirmed shut and secured, and, where a test arrangement is fitted between the valves, is it used regularly to check for leaks?

In one lineCargo-system sea and overboard valves closed, sealed and logged before transfer; the space between double valves regularly checked for leaks.

How to answer
  • Explain that before cargo or ballast operations the cargo officer checks every cargo-system sea and overboard valve is closed, secured and sealed, and records the seal numbers
  • Show how the space between the two sea valves is checked for leakage using the test cock or gauge, how often, and where it is recorded
  • If cargo tanks are ever ballasted from the sea chest, describe the company sequence that prevents oil going overboard: the pump is started and drawing from sea before the tank valves are opened, under the C/O's supervision, and there is no gravity loading through dirty lines
  • For line displacement with sea water, describe the planning, the line-up checked by two people, the pump pressure monitoring and closing the sea valves straight afterwards
  • Explain that any passing valve is reported and repaired, and the system is not used until it is fixed
Have ready
  • Sea valve seal log with seal numbers
  • Pre-arrival and pre-transfer checklists, and the ISGOTT ship/shore safety checklist
  • Leak test records for the double sea valves
  • Cargo and ballast system line drawings
  • Cargo operation plan showing the line-up

6.2.3 Bunker pipeline system pressure testing Rotational 2

Do the Master and officers know the company requirements for inspecting and pressure testing the HFO and MDO bunker lines, and have these tests been done and properly recorded?

In one lineBunker lines are pressure tested to the company's stated pressure and interval, and the date, pressure, duration and result are recorded.

How to answer
  • Describe how the test is done: isolate the line, blank the manifold, fill with oil or a suitable medium, raise the pressure to the test value in the company procedure, hold for the set time, and look for leaks and pressure drop
  • State the test frequency and test pressure required by the company, and where the last result is recorded
  • Explain how the date and test pressure are marked on the line or at the manifold, if the company requires this
  • Explain that any defect found is repaired and the line retested before bunkering
  • Describe the routine visual checks before each bunkering: line condition, flange bolts, valve glands, drip trays and gauges
Have ready
  • Bunker line pressure test records
  • PMS job entries for the test
  • Bunker line drawing
  • Pressure gauge calibration records
  • Bunker checklist and bunker plan

6.3.1 Ballast water management system (BWMS) Rotational 1

Do the Master and officers know how to operate the ballast water treatment system safely under company and maker's instructions, and is the system in good order and used as intended?

In one lineOperate the BWMS per the manual, record every operation and alarm, and report failures to the company and port State before discharging ballast.

How to answer
  • Describe how the system treats ballast (filtration plus UV, electrochlorination or chemical dosing) and the steps for ballasting and deballasting, including TRO or UV monitoring and neutralisation
  • Explain the hazards and controls: the SDS for chemicals, PPE, ventilation and gas venting, isolation before maintenance, and handling broken UV lamps
  • Explain what you do if the system fails: inform the Master and the company, record it in the BWRB, contact the port State before arriving, and follow the contingency measures. Do not discharge untreated ballast unless the port State allows it
  • Explain that any bypass is alarmed, logged and reported
  • Describe how the BWRB is kept with times, positions, volumes and treatment status
Have ready
  • Ballast Water Management Plan and IBWM Certificate
  • Ballast Water Record Book
  • BWMS type approval certificate and maker's manual
  • BWMS operation and alarm logs
  • Chemical SDS and PPE, if chemicals are used
  • Sensor calibration and maintenance records in the PMS

6.4.1 Main deck oil or chemical spill clean up equipment Rotational 2

Do the Master, officers and ratings know the company procedure for cleaning up small oil or chemical spills contained on deck, and is the right spill equipment on board, in good condition and used properly?

In one lineStop, alarm, contain with scupper plugs; clean up with the spill kit in PPE suited to the SDS; drum waste for shore disposal.

How to answer
  • Describe the first actions: raise the alarm, stop the operation, inform the terminal and the OOW, and contain the spill with scupper plugs and absorbents
  • Explain the clean-up: use absorbent pads, sawdust, scoops and shovels, pump free liquid to the slop or waste tank, and put contaminated material in drums for shore disposal
  • For chemicals, explain that you check the SDS for hazards and compatible absorbents and wear the right PPE, such as a chemical suit, gloves, face shield and breathing apparatus if needed
  • On gas carriers, explain that liquefied gas cargo spills are handled with water spray to protect the steel, while the spill kit covers bunker, lube and hydraulic oil
  • Show where the spill lockers are and what is inside
Have ready
  • Spill locker and its inventory list
  • SOPEP or SMPEP
  • Scupper plugs, drip trays and the portable pump
  • Cargo SDS and the PPE locker
  • Spill drill records

6.4.2 Disposal of oily water in the forecastle and other internal spaces Rotational 2

Do the Master and officers know how the company requires oily or polluted water that collects in the forecastle and other enclosed spaces to be removed and disposed of, and is this being done?

In one lineOily or polluted water from forward and internal bilges is pumped to a slop or waste tank or into drums, never overboard, and recorded.

How to answer
  • Explain how the bilge wells are checked and how often, as part of routine rounds or the PMS
  • Describe the removal method: portable air pump or eductor to the slop tank or to drums, never overboard if there is any oil or pollutant
  • Explain where the waste goes and how it is recorded, for example in the ORB Part I if transferred to the engine room sludge or bilge system, or the ORB Part II if transferred to the cargo slop tank
  • Mention that clean rainwater may be drained only after it has been checked free of oil
  • Explain how the source of contamination, such as a leaking hydraulic pipe or paint, is found and fixed
Have ready
  • Forecastle and steering gear bilge wells
  • Portable pump and hoses
  • Record book entries for transfers
  • PMS records of bilge well checks
  • The company SMS procedure

6.5.1 Emergency arrangements to pump out the machinery space bilges Rotational 2

Do the Master and officers know how to use the emergency bilge suction to pump out the engine room if it floods, and is this arrangement clearly labelled and in working order?

In one lineMarked emergency bilge suction ready on the largest sea water pump; oily discharge only to save ship or life, then record and report.

How to answer
  • Show the emergency bilge suction and explain that it lets a large sea water pump (often the main cooling pump) draw directly from the engine room bilge if flooding is beyond the normal bilge pumps
  • Walk the inspector through the line-up: open the emergency suction, close the sea suction as required, start the pump and monitor the level
  • Explain that MARPOL allows an oily discharge only when it is needed to secure the safety of the ship or save life, and that it must be recorded in the ORB Part I and reported
  • Explain the company rule that the emergency suction and the bilge overboard valves are kept closed, marked and sealed, with seal numbers logged and the keys controlled by the Chief Engineer
  • Mention how the valve is exercised and checked as part of the PMS
Have ready
  • Emergency bilge suction valve and its marking
  • Bilge system drawing
  • Seal log
  • PMS records for valve exercising
  • Flooding drill records

6.5.2 Incinerator operation Rotational 1

Do the engineers know the company procedure for operating the incinerator safely, and is the incinerator in good order and used in line with the procedure and MARPOL?

In one lineTrained engineers only, interlocks working, no prohibited items such as batteries or PVC, no burning in port, every burn and ash logged.

How to answer
  • Explain who may operate the incinerator according to the company procedure, and what supervision and training they need
  • Describe start-up: preheat to the required combustion temperature, then load in batches or burn sludge, and monitor temperature and flame
  • Explain the interlocks, for example that the charging door cannot be opened while the burner is firing or the chamber temperature is high, and the flame failure and over-temperature trips
  • List the prohibited items: cargo residues and contaminated packing, PCBs, PVC (unless the incinerator is approved for it), garbage with more than traces of heavy metals, and batteries and aerosols because they can explode
  • Explain that you do not incinerate in ports or where local rules prohibit it, and that ash is landed ashore and recorded as category E
Have ready
  • Incinerator type approval certificate and maker's manual
  • Incinerator operating log
  • Garbage Record Book and ORB Part I entries
  • Interlock test records in the PMS
  • Incinerator operating instructions posted at the unit

6.6.1 Oil filtering equipment Rotational 1

Do the Master and engineers know the company procedures for using the bilge oily water separator and 15 ppm alarm, and is the equipment in good condition and operated in line with the procedures, maker's manual and MARPOL Annex I?

In one lineCalibrated 15 ppm alarm and three-way valve tested; overboard valve and flanges sealed; any defect or tampering stopped, recorded, reported.

How to answer
  • Describe the test of the 15 ppm alarm together with the three-way valve or automatic stop: run the unit, simulate a high reading as per the maker's method, and confirm the effluent is recirculated to the bilge tank and the alarm is recorded
  • Explain the controls: the overboard valve is sealed and logged, the keys are held by the Chief Engineer, and the unit is run only with permission
  • If the OWS is defective, explain that you stop overboard discharges, keep bilge water on board, record the failure in the ORB, report to the company and land residues ashore
  • If tampering or a bypass pipe is found, explain that you do not use the system, preserve the evidence, report straight away to the Master and the company, and follow the company reporting channels
  • Explain that any suspicion of illegal discharge through other engine room piping is reported in the same way, without fear of retaliation
Have ready
  • OWS type approval and 15 ppm alarm calibration certificate
  • Seal log and approved seal drawing
  • OWS and alarm test records in the PMS
  • ORB Part I and the 15 ppm alarm data memory
  • Maker's operation and maintenance manuals
  • The company SMS procedure on oil filtering equipment

6.6.2 Oil discharge monitoring and control system (ODME) Rotational 1

On oil and chemical tankers carrying oil, do the Master and officers know the company procedure for operating the oil discharge monitoring equipment, and is the ODME in good order and used in line with the procedure, the maker's manual and MARPOL Annex I?

In one lineFlush and test the ODME, discharge only within MARPOL limits, stop at once on alarm or sighted oil, keep records three years.

How to answer
  • Describe the test run: flush with clean water, check zero, check the flow meter, alarms and overboard valve interlock, then start the discharge, as per the manual
  • Explain the discharge criteria and that the slop tank interface is checked before and during decanting
  • If the ODME fails, explain that you stop discharges, record the failure, report to the company and flag, and use manual operation only as the manual and flag allow (with manual input of flow and readings and constant visual watch). Otherwise keep the slops on board
  • If oil is seen astern, explain that you stop the discharge at once, inform the Master, record the time and position, investigate, and report as required
  • Make sure the oil type setting on the ODME matches the cargo, and know that some products cannot be measured by the ODME
Have ready
  • ODME operation manual and type approval
  • ODME printouts and records (three years)
  • ORB Part II decanting entries
  • ODME calibration and maintenance records
  • Slop tank interface readings

An independent guide written by seafarers for seafarers. It is not affiliated with or endorsed by OCIMF and does not reproduce the SIRE 2.0 Question Library: questions are put in our own words. The official library and guidance are published by OCIMF (ocimf.org). Always follow your company's SMS.