SeaVint

6.1.3 Oil Record Book Part I

Rotational 2ChemicalLNGLPGOilAsked to: Master, Chief Engineer, Engineer officersWhere: Chief Engineer's Office, Documentation, Engine Control Room

Do the Master and engineers know how the company wants the Oil Record Book Part I kept, and does it correctly show the machinery space operations, such as sludge, bilge, bunkering and fuel tank ballasting, that MARPOL Annex I requires to be recorded?

In one lineEvery machinery space oil operation is recorded with the right code, tank names match the IOPP Supplement, and quantities balance with soundings and receipts.

How to answer

  • Explain the main codes and give an example of each, such as the weekly sludge retention, an OWS discharge, a transfer between bilge tanks and a bunkering operation
  • Show that the tank names and capacities you use are exactly those in the IOPP Supplement
  • Explain that you follow the IMO guidance on ORB Part I entries and the company procedure, including how evaporation of water from sludge tanks is recorded
  • Explain that you record OWS failures and repairs, and land residues ashore when the OWS is out of service
  • Explain how corrections are made and that the Chief Engineer reviews the book before the Master signs each page

What the inspector looks for

  • Entries using the correct operation codes: fuel tank ballasting or cleaning, sludge collection and disposal, bilge water transfer and overboard discharge, OFE condition, exceptional discharges, bunkering and additional remarks
  • Sludge and bilge tank names and capacities matching the IOPP Supplement, item 3
  • Weekly sludge retention and bilge tank figures that make sense when compared with soundings
  • OWS discharges that agree with the 15 ppm alarm data and running hours
  • Shore disposal entries backed by receipts; entries signed by the engineer in charge and each page by the Master

Have ready to show

  • Oil Record Book Part I (current and previous; three years on board)
  • IOPP Certificate and Supplement (Form A or B)
  • Sludge and bilge tank sounding records
  • Reception facility receipts and bunker delivery notes
  • OWS and 15 ppm alarm records and the alarm calibration certificate
  • The company SMS procedure and IMO guidance on ORB entries

Avoid

  • Tank names or capacities that differ from the IOPP Supplement
  • Sludge or bilge quantities that cannot be accounted for, such as sudden unexplained reductions
  • Overboard discharges without an OWS running record, or discharges inside special areas
  • Late or unsigned entries, or incorrect codes

Practise in the interview trainer All questions

An independent guide written by seafarers for seafarers. It is not affiliated with or endorsed by OCIMF and does not reproduce the SIRE 2.0 Question Library: questions are put in our own words. The official library and guidance are published by OCIMF (ocimf.org). Always follow your company's SMS.