SeaVint

11.1.71 A cargo tank vapour dome including cargo system relief valves

CoreLNGWhere: Main Deck

Does the operator's submitted photograph No. 71 (the vapour dome of one cargo tank, with the relief valves of the cargo system) match what the inspector actually sees on board on the day, and is that area free from anything of concern?

In one lineThe vapour dome matches the photo: relief valves in date and set correctly, insulation intact, no corrosion.

How to answer

  • Before the inspection, stand at the same viewpoint as the submitted photo and compare it with the area today
  • Explain how relief valve settings are verified and recorded
  • Point out any defects and repair records
  • If the area has changed since the photo (repairs, new coating, equipment replaced), explain the change and show the record

What the inspector looks for

  • Whether the submitted photo is a true, current picture of the area
  • Relief valves fitted and in good condition, with set pressure records
  • Vent mast connections and flame screens
  • Insulation intact, no frost spots
  • Corrosion on dome and fittings

Have ready to show

  • The submitted photograph and the same viewpoint on board
  • Relief valve test and setting records
  • Defect reports
  • PMS records

Avoid

  • A photo that shows a better condition than the area actually has on the day
  • Relief valves overdue for overhaul
  • Damaged insulation or corrosion

Practise in the interview trainer All questions

An independent guide written by seafarers for seafarers. It is not affiliated with or endorsed by OCIMF and does not reproduce the SIRE 2.0 Question Library: questions are put in our own words. The official library and guidance are published by OCIMF (ocimf.org). Always follow your company's SMS.