Chapter 9. Mooring and anchoring
14 questions with how to answer each.
9.1.1 Testing and correct operation of the mooring winch brakes Core
Do the Master and deck officers know the company procedure for testing and using the mooring winch brakes, and are there records showing the brakes were tested at the required interval, after maintenance, and whenever they slipped early?
In one lineBrakes are tested yearly, after maintenance and after slippage, set to 60% of SDMBL, applied correctly, and lines are reeled in the correct direction.
- Describe how the brake test is done with the test kit or jack, as per the company and maker's procedure: apply the brake at the set torque, apply the load and record the rendering point
- Explain that MEG4 sets the brake holding capacity at 60% of the ship design MBL, and how you check it
- Explain how the brake is applied correctly: the right number of turns, a torque wrench or marked handle, and the line reeled in the direction that gives full brake holding
- Explain when you retest: after liner replacement, after any maintenance on the brake, or if the brake slips early
- Explain that the drum is taken out of gear with the brake on when in service, and the locking pin is fitted
- Brake test records and certificates
- Brake test kit and its calibration
- PMS records for winch maintenance
- Brake holding capacity marking
- Mooring arrangement drawing
9.1.2 Was the vessel satisfactorily moored Rotational 1
Is the ship moored according to the terminal's mooring plan, and is that arrangement one of the configurations allowed by the ship's own Mooring System Management Plan (MSMP)?
In one lineCheck the terminal plan against the MSMP before berthing, moor to an agreed configuration, no mixed lines per direction, tend evenly.
- Explain how you compared the terminal's plan or information with the MSMP before arrival: line numbers and leads, environmental limits (wind and current), bollard and fairlead SWL, and line strength
- Explain what you do when the two do not agree: tell the terminal and the company, agree a safe alternative, record it, and set stop-cargo criteria
- Describe how lines are tended during the stay for tide, draft and weather changes, and how you keep load sharing even
- State the MSMP environmental limits for this berth and when you would stop cargo operations, add lines or call tugs
- Mooring System Management Plan
- Terminal mooring plan / port information
- Pre-arrival mooring plan and checklist
- Line Management Plan for the lines in use
- Weather forecast and mooring watch records
9.1.3 Line Management Plan (LMP) implementation Rotational 1
Do the Master, deck officers and ratings who work on moorings know what is in the Line Management Plan, is the plan kept up to date as the company requires, and is there a certificate for every line, tail and joining shackle listed in it?
In one lineThe LMP tracks every line, tail and shackle by location and certificate, with recorded inspections, rotation and retirement criteria.
- Describe the LMP content: line identification, certificates, the inspection regime and frequency, rotation and end-for-ending, retirement criteria, service records, and splicing rules
- Show the certificate for a chosen line or tail and its location on board
- Explain how inspection results are recorded, and what triggers retirement
- State whether the company allows splicing, and if it does, only by trained persons to the maker's method
- Explain how a line failure is reported and investigated
- Line Management Plan
- Certificates for lines, tails and shackles
- Inspection and rotation records
- Incident reports for any line failures
- The company SMS procedures referenced in the LMP
9.1.4 Mooring lines, tails and mooring shackles Rotational 2
Do all mooring lines, tails and joining shackles on board, including the spares, meet the industry guidance (MEG4)?
In one lineEvery line, tail, shackle and spare is certified, matched to the SDMBL as MEG4 requires, and in good condition.
- State the ship's SDMBL and show that lines are chosen to match it in line with MEG4
- Explain that tails must be stronger than the line they are attached to, by the margin MEG4 sets, and that joining shackles are certified with a strength compatible with the tail and line
- Show the spares with their certificates and explain how they are stored
- Explain how line condition is inspected and when the LMP retirement criteria take a line out of service
- Mooring arrangement plan showing SDMBL
- Certificates for lines, tails and shackles
- Line Management Plan
- Spare line store
- Inspection records
9.2.1 Emergency towing procedure and equipment Rotational 2
Do the Master and all officers know the ship's own emergency towing procedure, and is any emergency towing equipment fitted in good condition and ready to use straight away?
In one lineKnow the ship-specific Emergency Towing Booklet; the forward and aft gear is maintained and ready to deploy without main power; drills are recorded.
- Explain what the booklet contains: arrangement drawings, the strong points and their SWL, step-by-step rigging for both ends, communication with the towing vessel, and the information to pass to the salvor
- Walk the inspector through deploying the aft pre-rigged pick-up gear and connecting the forward gear: who goes where, the tools needed, and how it works with no main power
- Explain how the equipment is inspected and maintained in the PMS (greasing, chain condition, buoy light, lashings)
- Show the last towing drill record and what was learned
- Emergency Towing Booklet (copies on bridge, forward and aft)
- Emergency towing arrangements forward and aft
- PMS inspection records
- Drill records
- Arrangement drawings and strong point SWL
9.3.1 Anchoring operations Rotational 1
Do the Master and deck officers know the company's anchoring procedures, and do records show that recent anchoring operations met the company's expectations?
In one linePlan within the windlass limits, walk back in deep water, keep the brake tested and adjusted, keep a proper anchor watch, and record it all.
- State the windlass lifting limit from the ship's particulars (typically designed for the anchor plus about three shackles hanging vertically) and explain why you walk the anchor back in deep water instead of letting it run
- Explain how you verify the brake: liner thickness and condition, the brake test result, the adjustment marks, and no slipping when the cable is held
- Describe the anchoring plan and briefing: approach speed over the ground, letting go or walking back, scope for depth and weather, reporting the cable direction and strain
- Describe the anchor watch and the conditions (wind speed, dragging, swell) under which you would call the Master, heave up or put to sea
- Anchoring plan and checklists
- Deck log entries
- Windlass particulars and brake test records
- PMS records for windlass, anchors and chain
- ECDIS anchor watch settings
9.4.1 Mooring team supervision and composition Rotational 2
Do the Master, deck officers and ratings know the company procedure that sets who supervises each mooring and anchoring station and how many crew are needed, and is there proof each station was manned and supervised as required?
In one lineEach mooring and anchoring station has the required officer and team as the procedure sets, with manning, briefings and rest hours recorded.
- Describe the team at your station: the officer in charge, winch operator(s) and line handlers, and the minimum number the procedure requires for that operation
- Describe the anchoring team: an officer forward, the windlass operator and a communicator with the bridge
- Explain that the officer in charge is not hands-on with lines, so they can watch the whole station and communicate with the bridge
- Show where manning and briefings are recorded, and explain how extra crew are called or the operation is paused when a team is short
- Company mooring and anchoring procedure
- Mooring station manning records and briefings
- Deck log
- Hours of rest records
- Familiarisation / competence records for winch operators
9.4.2 Dangers of working with and around mooring lines Rotational 2
Do the deck officers and ratings who take part in mooring know how to operate the mooring winches safely and understand the dangers of working near lines, especially when the lines are under tension?
In one lineToolbox talk before every mooring; treat the whole deck as snap-back danger; never step over tensioned lines; declutch drums, pins fitted.
- Explain what the toolbox talk covers: the plan, each person's position and role, communications, snap-back danger and where to stand
- Explain snap-back: a parting line recoils with great force along and beyond its path, so stand well clear of the line and its bight, and remember that painted zones do not show all the danger
- Explain safe winch use: operator watching the line, no one near the drum or fairlead, the drum declutched with the brake on, locking pins in, and controls not tied in position
- Explain how other crew and visitors are kept away from tensioned lines in port, using signs, barriers and the gangway briefing
- Company mooring safety procedure
- Toolbox talk records
- Warning signs and barriers on mooring decks
- Winch clutch locking pins
- Training and familiarisation records
9.5.1 STS operations checklists Core
Are the correct industry checklists used during ship-to-ship transfers, and are full records of these operations kept?
In one lineUse and sign the industry STS guide checklists at each stage, record the whole operation, notify the coastal state, and keep the records three years.
- Name the checklists you use and at which stage each is completed and exchanged with the other ship
- Show the full set from the last STS operation, signed and timed
- Explain what is recorded during transfer: rates, pressures, hose and fender condition, mooring checks, weather and the communications test
- Explain the coastal state notification and the three-year retention of STS records for oil cargo transfers
- Completed STS checklists
- STS records and cargo log
- Deck log
- Coastal state notification
- STS Operations Plan
9.5.2 STS Joint Plan of Operation (JPO) Rotational 1
For STS transfers at sea, is there an accurate Joint Plan of Operation on board, do the Master and deck officers know what it says, and are operations carried out in line with it?
In one lineHave an accurate, operation-specific JPO on board, brief everyone on it, and stop the operation when its limits are exceeded.
- Describe the JPO for the current or last operation: who is in charge (POAC), the mooring and fender arrangement, the hose connection, agreed rates, weather limits and emergency procedures
- Explain how and when the crew were briefed, and confirm that ratings know their own tasks and the emergency signals
- Explain what you do if conditions go beyond the JPO limits: stop the transfer, drain the hoses, prepare to unmoor, and inform both Masters and the POAC
- Show the signed JPO and the briefing record
- Joint Plan of Operation
- Briefing records
- STS checklists
- Communication plan
- Emergency procedures
9.5.3 STS Operations Plan Rotational 2
Do the Master, officers and deck ratings know the ship's STS Operations Plan?
In one lineThe ship-specific STS Operations Plan is kept on the bridge and in the CCR, and all crew know its content and their own role.
- Explain where the plan is kept and summarise its main sections
- Describe your own role in the plan during mooring, transfer and emergencies
- Explain how the plan links to the JPO and the industry checklists for each operation
- Mention that for oil tankers the plan is approved by the flag and that the ship's language version is available
- STS Operations Plan
- Flag approval (oil tankers)
- Training and familiarisation records
- STS checklists
- Joint Plan of Operation for the latest operation
9.6.1 Vapour hose securing arrangement for buoy moorings Rotational 1
On oil tankers fitted with vapour return, is the vapour manifold set up so the vapour hose can be safely handled and secured at buoy moorings, where floating hoses are lifted aboard from the water?
In one lineVapour manifold clearly identified, with saddle, strong points and a crane able to hold the buoy vapour hose off the flange.
- Explain how the vapour hose is lifted and secured at a buoy: crane lift, hang-off or snubbing to the strong point, support on the saddle so the flange carries no weight
- Point out the vapour manifold identification (distinctive marking and the projecting stud on the flange that prevents a liquid hose being fitted)
- State the SWL of the hose-handling crane and confirm it covers the vapour manifold
- Explain the checks before connection: valve closed, blank removed, gasket, pressure/vacuum protection and oxygen / pressure monitoring of the vapour line
- Vapour manifold with its markings and stud
- Hose saddle, strong points and lifting points
- Crane SWL certificate and load test records
- Manifold arrangement drawing
- HVPQ / ship particulars for SPM and vapour manifold data
9.6.2 SPM mooring arrangements Rotational 2
Do the Master and officers know the company procedures for mooring to a single point mooring (SPM) or an FSO/FPSO, and does the HVPQ describe the required bow fittings correctly?
In one lineKnow the SPM hook-up sequence and your role, keep clear of rope and chain, and ensure the HVPQ matches the fitted stoppers.
- Describe the hook-up: pick-up rope handled by the terminal boat, heaved through the bow fairlead by the winch drum, chafe chain brought into the stopper, stopper closed and locking pin fitted
- Explain your role (officer in charge forward, communication with the bridge, winch operator, line handlers) and keeping everyone clear of the chain and rope under tension
- Explain how the bow is watched during the stay: hawser tension, heading, regular reports to the bridge, and emergency release
- Show that the stopper type, SWL and distances in the HVPQ match what is fitted
- Bow chain stopper(s), certificates and test records
- HVPQ section on bow fittings
- Company procedure for SPM / FSO / FPSO mooring
- Terminal regulations and mooring information
- PMS records for forward mooring equipment
9.7.1 Shuttle tanker bow mooring system Rotational 2
On shuttle tankers, do the Master and officers know the company procedures for operating, inspecting, testing and maintaining the bow mooring and loading system used at offshore terminals, and is the equipment in good order?
In one lineKeep the chafe chain locked in the stopper, know the manual brake release and line cutter, and test the bow system before every offshore call.
- Explain how the chafe chain is held: stopper closed, hydraulic lock and mechanical latch / pin, indicators checked, and why the stopper must not be opened under load except in an emergency release
- Describe how to release the traction winch brake manually if power is lost
- Explain the messenger line cutter: when the messenger may be drawn into a thruster or the propeller and how the cutter is operated
- Describe the pre-arrival function tests (stopper, coupler, ESD and emergency disconnect, alarms, communication) and where they are recorded
- Bow loading system manual and company procedure
- Pre-arrival function test checklists
- PMS maintenance records for stopper, traction winch and coupler
- Emergency release / ESD test records
- Messenger line cutter and manual brake release locations
An independent guide written by seafarers for seafarers. It is not affiliated with or endorsed by OCIMF and does not reproduce the SIRE 2.0 Question Library: questions are put in our own words. The official library and guidance are published by OCIMF (ocimf.org). Always follow your company's SMS.