11.1.40 IG system pressure/vacuum-breaking (P/V) device

CoreChemicalOilWhere: Main Deck

Does the operator's submitted photograph No. 40 (the inert gas pressure/vacuum breaker) match what the inspector actually sees on board on the day, and is that area free from anything of concern?

In one lineThe P/V breaker matches the photo: correct liquid level, clean outlet and inspected regularly as part of the IG system.

How to answer

  • Before the inspection, stand at the same viewpoint as the submitted photo and compare it with the area today
  • Explain the purpose: prevents over- or under-pressure of the cargo tanks if the P/V valves fail
  • Show how the liquid level is checked and topped up and the record
  • If the area has changed since the photo (repairs, new coating, equipment replaced), explain the change and show the record

What the inspector looks for

  • Whether the submitted photo is a true, current picture of the area
  • P/V breaker filled with the correct liquid (antifreeze where needed) to the right level
  • Flame screen and outlet clear
  • Device free of corrosion
  • Inspection records

Have ready to show

  • The submitted photograph and the same viewpoint on board
  • P/V breaker inspection records
  • PMS records
  • IG system manual

Avoid

  • A photo that shows a better condition than the area actually has on the day
  • Liquid level low or wrong fluid
  • Corroded or blocked outlet