SIRE 2.0 guide
SIRE 2.0 ship self-check Go through the questions with the officers responsible. Tick a question when the procedure is known, the records are in order and the equipment is ready. The gaps are what to work on before the inspection.
All ship types Oil Chemical LPG LNG
Show only the gaps Print
2. Certification and documentation 2.1.1 Maintenance of Statutory Certification — All certificates valid and endorsed, tracked against survey windows, no overdue class items, indexed file ready on the Master's desk. guide 2.2.1 Superintendent vessel inspection and report — Superintendent inspects every six months; reports on board; findings tracked and closed in the defect system. guide 2.2.2 Internal ISM audit — Internal audit done within 12 months; every NC has root cause, corrective action and office-verified closure. guide 2.2.3 Master's Review of the SMS — I know the SMS layout and policy; last two Master's Reviews done on time, with real comments and office replies. guide 2.3.1 Structural concerns and Enhanced Survey File — ESP file complete and updated after each survey; Coating Technical File kept; no unreported structural or coating issues. guide 2.3.2 Structural concerns and Class Survey File — Class survey file complete and current; hold spaces and ballast tanks inspected and recorded; no unreported defects. guide 2.3.3 Cargo, ballast & void space inspection — Every tank and void inspected on schedule, reports with ratings and photos, defects reported to the office. guide 2.3.4 Monitoring cargo, ballast & void spaces for leakage and contamination — Voids and empty tanks sounded routinely, levels trended, ballast surface checked before discharge, all recorded. guide 2.3.5 Condition Assessment Program (CAP) — Enrolled in CAP with class; current rating and certificate on board. guide 2.4.1 Defect reporting system — Every defect raised in the company system, classified, risk-assessed if critical, and tracked to closure with the office. guide 2.4.2 Defect reporting to class, flag etc — Statutory or class-related defects reported via the office to class, flag and port; dispensations on board where needed. guide 2.5.1 Management of Change — Any change to class or statutory items goes through MoC: risk assessment, approvals, updated documents, crew trained. guide 2.6.1 Ballast Water Management Plan — BWMP understood, treatment system used as approved, every operation correctly entered and signed in the record book. guide 2.6.2 VOC Management Plan — VOC plan known; pressure kept up, venting minimised and recorded, measures included in the cargo plan. guide 2.6.3 Ship Energy Efficiency Management Plan (SEEMP) — SEEMP Parts I-III known; efficiency measures in use; fuel data accurate; CII rating and improvement plan understood. guide 2.7.1 Availability of SMS content to all crew — I know where to find my procedures, can open them quickly and understand them in the working language. guide 2.7.2 Communication lines with the company and DPA — I know my chain of command, the DPA's name and number, and that I can contact the DPA directly. guide 2.8.1 HVPQ accurately completed — HVPQ reviewed before inspection and matches the ship and its certificates; discrepancies reported for correction. guide 2.8.2 Last Port State Control Inspection — Last PSC report on board; every deficiency rectified with evidence and closed in the company system. guide 3. Crew management 3.1.1 Crew qualifications and matrix verification — All certificates valid and correct for ship type; officer matrix matches the crew on board; officers communicate clearly in English. guide 3.1.2 Designated working language — Working language recorded; all procedures and signs in it; I can communicate clearly in it. guide 3.1.3 Minimum, standard and enhanced manning levels — Manning meets the safe manning document and company standard; senior officer reliefs staggered with written handovers. guide 3.2.1 Static navigational assessment — Static navigation assessment report on board, matching the questionnaire, with findings closed. guide 3.2.2 Dynamic navigational assessment by a company representative — Company sailing navigation assessment report on board; findings known to officers and closed. guide 3.2.3 Dynamic navigational assessment by a specialist contractor — Specialist contractor's sailing navigation assessment report on board; findings closed and shared. guide 3.2.4 Unannounced remote navigational assessment — Remote VDR/ECDIS assessment report on board; findings discussed with officers and closed. guide 3.2.5 Comprehensive cargo audit by a company representative — Company cargo audit report on board; Chief Officer knows the findings and their closure. guide 3.2.6 Comprehensive engineering audit by a company representative — Company engineering audit report on board; findings tracked and closed. guide 3.2.7 Comprehensive mooring and anchoring audit by a company representative — Mooring and anchoring audit report on board; findings closed and practices updated. guide 3.2.8 Behavioural Competency Assessment Programme — Behavioural competency assessments done by approved assessors for navigation, cargo, mooring and engineering, with records. guide 3.3.1 Shore-based Bridge Team Management training — Shore-based BTM certificate within five years; I apply closed-loop communication and challenge-response. guide 3.3.2 Formal ship handling training — Formal ship handling course done before command/type change; I know this ship's handling characteristics. guide 3.3.3 Cargo operations shore-based simulator course — Shore-based cargo simulator course within five years, relevant to this ship type. guide 3.3.4 Shore-based engine room management simulator course — Shore-based ERM simulator course within five years; I apply engine room resource management. guide 3.3.5 Training for Dynamically Positioned (DP) operators — DP certificates and logbooks valid; training per IMCA and field rules for every DP role. guide 3.3.6 LNG or other low-flashpoint fuel training and familiarisation — IGF training valid for my duties; familiarised with the fuel system and its emergency actions. guide 3.4.1 Hours of rest, records and monitoring — Hours of rest recorded honestly, match the logs; breaches reported and managed; I know the 10/77-hour rule. guide 3.4.2 Drug and alcohol abuse prevention — Policy known; unannounced tests done on schedule; calibrated breathalyser and trained tester on board. guide 3.5.1 Familiarisation of crew, visitors and contractors — Familiarisation completed and signed before duties; visitors briefed; I know my equipment and emergency duties. guide 3.5.2 Training and instruction LSA and FFA — I can operate my LSA/FFA equipment; drills and training recorded regularly as per SOLAS and company plan. guide 3.5.3 Familiarisation with ECDIS equipment installed on board — Generic and type-specific ECDIS training plus ship familiarisation recorded; I can demonstrate key functions. guide 4. Navigation and communications 4.1.1 ECDIS set up and operation — Safety settings derived from draught and UKC, set by the Master, recorded; alarms active; route checked; back-up ready. guide 4.1.2 Operation and testing of radar/ARPA — Radars checked and recorded; sea-stabilised for collision avoidance; know X vs S band; AIS only supplementary. guide 4.1.3 Operating and testing the steering control systems — I can change steering modes including emergency control; tests and three-monthly drills done and recorded. guide 4.1.4 Automatic Identification System (AIS) — AIS data correct for current voyage; annual test done; AIS is only an aid, never the sole collision avoidance tool. guide 4.1.5 Bridge Navigational Watch Alarm System (BNWAS) — BNWAS on at sea, key with Master; alarm stages known; tested and logged; on stage 2 alarm go straight to the bridge. guide 4.1.6 Global Navigation Satellite System(s) — GNSS correctly configured, cross-checked with radar/visual fixes, and I know how to spot jamming or spoofing. guide 4.1.7 Echo sounder — Echo sounder set to correct offset; I can calculate depth under keel; accuracy checked and recorded. guide 4.1.8 Speed and distance measuring devices — Log type and speed mode known; accuracy checked against GNSS and recorded; feeds ARPA correctly. guide 4.1.9 Navigation lights and shapes — Lights and alarms tested and visually checked, spares on board, shapes ready and I know when to show them. guide 4.1.10 NAVTEX and SafetyNET — Correct NAVTEX/EGC areas set; warnings reviewed, logged and plotted on the route; expired ones removed. guide 4.1.11 Preserving data from the VDR/S-VDR — I know how to save VDR data after an incident; annual performance test valid; alarms checked. guide 4.1.12 Magnetic and gyro compasses — Compass error checked each watch and recorded; deviation card current; I can switch gyros safely. guide 4.1.13 VHF/DSC transceivers — VHF/DSC tested and logged daily; COLREGs come first; VHF agreements for collision avoidance carry risk. guide 4.1.14 Daylight signalling lamp — Daylight lamp tested, battery charged, spares available, recorded. guide 4.1.15 Sound signalling equipment — Whistle tested and logged; I know manoeuvring and restricted visibility signals under the COLREGs. guide 4.2.1 Passage planning — Berth-to-berth plan: appraisal, no-go areas, abort points, contingencies; approved, signed, followed and monitored. guide 4.2.2 Under keel clearance (UKC) policy — UKC calculated for departure, transit critical points and arrival, all factors included; waivers documented. guide 4.2.3 Master's Standing Orders and Daily Orders — Standing Orders signed and understood; Night Orders daily; CPA/BCR, passing distance and call-Master rules followed. guide 4.2.4 Electronic chart management — ENCs updated weekly, T&P and AIO reviewed, permits cover the voyage, RNC use controlled. guide 4.2.5 Paper chart management — Paper charts corrected to latest Notice, recorded in the log, T&P managed and scale suitable. guide 4.2.6 Testing navigational equipment, main propulsion, steering gear and thrusters — Pre-departure/arrival checklists complete; steering, engine and thrusters tested before use and recorded. guide 4.2.7 Nautical publications — Required publications current and corrected; electronic ones updated; new editions ordered on time. guide 4.3.1 Minimum bridge team composition — Bridge manning levels set in the plan for each stage and confirmed in the log; engine room mode matches. guide 4.3.2 Machinery space team composition — Engine room mode and manning set for each stage, communicated with the bridge and recorded. guide 4.3.3 Integrating a pilot (or similar role) into the bridge team — Pilot card exchanged and explained; plan agreed; pilot monitored and challenged if needed. guide 4.3.4 Bridge distractions — Bridge kept free of distractions: no personal devices, no non-essential visitors or tasks during critical phases. guide 4.4.1 Emergency Position Indicating Radio Beacon (EPIRB) — EPIRB tested and maintained, expiry dates valid; manual activation known; false alert cancelled with RCC. guide 4.4.2 Search and Rescue Transmitters (SARTs) — SART mounted high in the craft; shows as dots on X-band radar; tested and battery valid. guide 4.4.3 Survival craft portable two-way VHF radios — Two-way VHFs stored at the agreed location, tested on a working channel, emergency batteries sealed and valid. guide 4.4.4 Sending and receiving distress, urgency and safety messages — Designated radio operator on the muster list; I can send DSC distress, urgency and safety messages; instructions posted. guide 4.4.5 Operation and testing of GMDSS station — GMDSS tested daily, weekly and monthly as required; logged; batteries checked; survey and maintenance valid. guide 4.4.6 Use of radio or mobile telephone equipment during cargo and ballast handling — Only intrinsically safe radios in cargo areas; no mobile phones on deck; enough radios available and charged. guide 4.5.1 Annual DP Trial report and supporting exercises — Annual DP Trials report on board; findings known and closed; DP drills practised on varied scenarios. guide 4.5.2 DP Position Reference Systems — PRS selected per offtake location, checked before ops, sensor offsets at hand for the DPO. guide 4.5.3 DP events and incidents — DP events reported and investigated per company procedure; parameters continuously logged and kept. guide 4.5.4 DP operations manual — DP manual on board; I use the checklists, capability plots, consequence analysis and ASOG during operations. guide 4.5.5 Field Operations Manuals — Latest Field Operations Manual and FSOG on board; communication checks recorded; contacts and channels known. guide 5. Safety management 5.1.1 Records of mandatory and company defined emergency drills — All mandatory and company drills are on a planner, done on time, recorded with lessons learned, and reflected in rest hour records. guide 5.1.2 Emergency plans & drills for principal fire scenarios — I know my fire duty, the first actions for each main fire scenario, and our drills rotate through engine room, cargo area and accommodation. guide 5.1.3 Pollution prevention drills required by SOPEP or SMPEP — Stop, contain, report: I know my SOPEP/SMPEP duties, where the spill kit is, and the reporting chain from the plan. guide 5.1.4 Enclosed space rescue emergency response drill — Attendant never enters: raise alarm, keep contact, ready gear; rescue team enters only with BA, tests atmosphere and lifts casualty with the stretcher. guide 5.1.5 Drills required by the Ship Security Plan (SSP) — Security drills every three months (extra after major crew change), annual exercise, varied scenarios, recorded; SSP stays confidential. guide 5.1.6 Launching the lifeboat(s) and abandon ship drills — Monthly abandon ship drills, boat launched and manoeuvred at least every three months, and I can explain each launching step. guide 5.1.7 Emergency plan & drills for a cargo vapour or liquid release, Including potential fire — Alarm, ESD, stop cargo, water spray/curtain, secure accommodation, control ignition, PPE against cold and toxic exposure. guide 5.1.8 Emergency plan & drills for collision — Alarm, stop/manoeuvre, close WT doors, muster, sound tanks, assess stability, prevent pollution and fire, report. guide 5.1.9 Emergency plan & drills for grounding — Stop engines, alarm, signals, sound around and all tanks, assess stability before refloating, prevent pollution, report. guide 5.1.10 Emergency plan & drills for loss of propulsion — Show NUC, warn traffic, inform VTS and company, plot drift from wind and current, prepare anchors and towing early. guide 5.1.11 Emergency plan & drills for failure of electrical power — Emergency generator starts automatically, transitional power bridges the gap; we find the cause, restore main power and essential services in sequence. guide 5.1.12 Steering gear failure emergency drill — Emergency steering drill every three months; I can change to local control, communicate with the bridge and follow helm orders. guide 5.1.13 Emergency plan & drills for emergency towing — ETB on the bridge; aft gear deployable without power; I can explain rigging fore and aft and the safety precautions. guide 5.1.14 Man overboard emergency drill — Shout, throw lifebuoy, MOB button, alarm, turn; rescue boat launched and recovered safely; I know my role. guide 5.1.15 Emergency response plan & drills for recovery of persons from the water — Our plan names the gear and positions; I know my role, we lift horizontally where possible and treat for hypothermia. guide 5.1.16 Emergency plans & drills for flooding — Alarm, find and isolate the source, pump out (emergency bilge suction if needed), sound all spaces, assess stability, report. guide 5.1.17 Emergency plans and drills for LNG bunker operations — ESD, stop transfer, close valves, water curtain on, alarm and inform supplier; cryogenic PPE on; we drill it. guide 5.1.18 Cargo leak into double hull spaces — Detect by gas/sounding, stop and isolate, monitor, inert and transfer cargo; never discharge contaminated ballast; equipment ready and listed. guide 5.1.19 OBO Forward space emergency pumping arrangements — I can explain and operate the forward space dewatering sequence; valves are marked, alarms work and the system is tested. guide 5.2.1 Emergency fire pump — I can start the emergency fire pump locally and remotely; it is tested regularly and delivers pressure on deck. guide 5.2.2 Fire dampers & ventilation stops — I know where the dampers and remote fan stops are, how to close them, how they're tested, and their positions during cargo work. guide 5.2.3 Fixed fire detection and fire alarm system — I can read the panel; all detectors are tested in rotation; isolations are authorised and logged; every alarm is checked at once. guide 5.2.4 Machinery space fixed carbon dioxide fire extinguishing system — Head count, close openings, stop fans and fuel, open cabinet for alarm, release with both controls; CO2 room clear and serviced. guide 5.2.5 Machinery space fixed high-expansion foam fire extinguishing system — I know the foam tank, control station and spaces covered; release after head count and closing openings; foam analysed in date. guide 5.2.6 Machinery space fixed pressure water-spraying fire extinguishing system — I know the supply tank, the sections and how to start the pump and open a section; it is tested and instructions are posted. guide 5.2.7 Fire pumps, fire main, fire main isolating valves and fire hydrants — Fire pumps start locally and remotely; isolating valves and drains are known and marked; hydrants and main are in good order. guide 5.2.8 Galley fixed and portable fire extinguishing systems & fire prevention — Kill the power and fans, smother with blanket or release the hood system; never water on oil; filters and ducts kept grease-free. guide 5.2.9 Water-spray system on deck — The water spray cools and protects domes, manifolds and accommodation front; I know the valves and drains; it's tested and nozzles cleared. guide 5.2.10 Cargo handling equipment space(s) fixed fire extinguishing system — CO2 protects the compressor/motor rooms; stop machinery, head count, close up, release from the posted station; serviced and checked. guide 5.2.11 Fixed dry chemical powder fire extinguishing system — Pressurise with nitrogen, open the outlet, aim at the base of the fire; purge lines after use; propellant and powder checked. guide 5.2.12 Paint locker fixed fire-extinguishing system — I know the system, the outside release and how to use it; locker is tidy, ventilated and flammables stored safely. guide 5.2.13 Machinery space fixed water-based or equivalent local application fire-fighting system — Mist covers engine fuel areas, purifiers and boiler; automatic during UMS, manual when manned as configured; tested regularly. guide 5.2.14 Cargo, ballast and stripping pump temperature sensing devices — Sensors warn of hot bearings, glands and casings; set per maker; tested and recorded; on alarm stop the pump and investigate. guide 5.2.15 Deck foam system, including portable applicators — Start the fire pump, open foam valve, use monitors/applicators from upwind, apply gently; foam analysed in date. guide 5.2.16 Fire doors — Fire doors keep fire zones intact; they close and latch on their own, are tested, and are never wedged open. guide 5.3.1 Firefighter’s outfits including self-contained breathing apparatus (SCBA) — I can don and check an SCBA, know its pressure and endurance, recharge cylinders safely; sets are checked monthly and serviced annually. guide 5.3.2 Fire hoses, nozzles and international shore connection — Hoses and dual-purpose nozzles at every hydrant; ISC complete with bolts and gasket; hoses tested regularly. guide 5.3.3 Portable fire extinguishers — Pin, aim at the base, squeeze, sweep; right type for each risk; checked onboard, serviced annually, spares carried. guide 5.3.4 Emergency Escape Breathing Devices (EEBDs) — EEBDs are for escape only, about ten minutes of air; I know where they are on my escape route; they're checked regularly. guide 5.3.5 Wheeled (mobile) fire extinguishers — Wheel it in, run the hose out fully, activate and hit the base of the fire; units placed by high-risk areas and serviced. guide 5.4.1 Davit-launched lifeboats, release mechanisms and launching appliances — Weekly and monthly checks, annual and five-yearly service done; I can explain hook release, reset checks and launching safely. guide 5.4.2 Free-fall lifeboat, its release systems and its launching appliance — All strapped, hatch closed, engine running, then hydraulic release; simulated launch only with restraints checked; serviced and inspected. guide 5.4.3 Dedicated rescue boat and launching appliance — I can start the rescue boat, engage drive, slew and lower without main power; boat launched regularly and serviced. guide 5.4.4 Rocket parachute flares and line throwing appliances — Twelve flares on the bridge and a complete line-thrower, all in date and inspected; I can explain how to fire both safely. guide 5.4.5 Liferafts, hydrostatic releases and liferaft launching appliances — Raft and HRU in date, painter via the weak link; float-free and manual launch both understood. guide 5.4.6 Lifebuoys, and associated lights, smoke floats and lifelines — Lifebuoys as per safety plan, free to throw, marked; lights, smoke signals and lines in date and checked. guide 5.4.7 Immersion suits — My suit is at a marked location, the right size, checked, and I can put it on within two minutes. guide 5.4.8 Lifejackets and personal flotation devices (PFDs) — Lifejacket in my cabin and at stations; working PFDs worn as the company requires; all inspected and inflatables serviced. guide 5.4.9 Emergency lighting — Emergency lighting runs from the emergency switchboard with battery back-up; it's tested to the PMS and every failed light is fixed. guide 5.5.1 Enclosed space entry procedures — No permit, no entry: ventilate, test (O2 21%, HC ≤1% LFL, toxics <50% OEL), rescue gear ready, attendant never leaves. guide 5.5.2 Hot work procedure — Outside the workshop: permit, RA, gas test, isolations, fire watch, approval; stop if conditions change. guide 5.5.3 Working at height — Permit and RA, harness clipped to a strong point, helmet, area below cleared, standby person; stop if weather or motion worsens. guide 5.5.4 Working over the side — Permit, lifejacket plus harness and independent lifeline, standby person with lifebuoy, ship stopped and weather suitable. guide 5.5.5 Working on electrical equipment and systems — Permit, isolate, lock and tag, prove dead; live work only when unavoidable and approved; HV and hazardous areas under special permit. guide 5.5.6 Control of hazardous energy — Identify every energy source, isolate, lock and tag, prove zero energy, record it, and remove only when authorised. guide 5.6.1 Portable and personal gas measurement instruments — Right meter for each gas, bump test before use, span calibration with in-date gas, shore service on time; catalytic LEL not in inert atmosphere. guide 5.6.2 Testing the atmosphere in double-hull and double bottom spaces for flammable gas — Monitor ballast and void spaces at the company interval with fixed or portable equipment, purge lines, record and act on any rise. guide 5.6.3 Fixed gas detection systems required by the IGC Code — I know the monitored spaces, panel and set points; the system is calibrated with the right span gas and no point is left isolated. guide 5.6.4 Fixed gas detection system required by the IGF Code — Detectors cover all gas fuel spaces and ducts; I know the alarm and shutdown points; tested, calibrated and bypasses controlled. guide 5.6.5 Cargo pump room fixed gas detection system — Pump room gas detection runs continuously with alarms in CCR and bridge; calibrated, set correctly and checked before every entry. guide 5.6.6 Oxygen sensors in inert gas system spaces — O2 sensors in the IG space warn of leaks; alarm set and tested; on alarm evacuate and do not enter without BA. guide 5.7.1 Incident investigation reports for defined incidents — Every incident reported; those above the threshold investigated with root causes and actions; lessons shared and actions closed. guide 5.7.2 Incident and near-miss reporting procedure — Report it to the supervisor and in the company system; it's investigated, tracked to closure and the lesson shared; no blame for reporting. guide 5.7.3 Shipboard safety meetings — Safety meetings held on schedule; minutes sent ashore; office replies on file; every concern tracked to closure. guide 5.7.4 Work planning procedure — Daily work planning meetings cover tasks, hazards, permits, PPE and rest; recorded and updated when plans change. guide 5.7.5 Stop Work Authority — Anyone can stop unsafe work, without blame; we make safe, discuss, fix and restart only when it's safe. guide 5.7.6 Risk assessments for new, non-routine, unplanned or specified tasks — Identify hazards, rate risk, add controls, check residual risk, approve, brief the team and review generic RAs before every use. guide 5.7.7 Safety Data Sheets — SDS for every cargo, fuel, chemical and paint; I know hazards, PPE, first aid and spill actions from it. guide 5.7.8 Simultaneous Operations (SIMOPS) procedure — SIMOPS matrix tells us what can run together; extra controls agreed, terminal informed, stop if conditions change. guide 5.8.1 Safety inspection of the main deck and mooring areas — Deck and mooring areas are inspected on schedule; findings like worn lines, leaks or trip hazards are recorded, reported and fixed. guide 5.8.2 Safety inspection of the machinery space — Machinery spaces inspected on schedule; leaks, hot surfaces, missing guards and housekeeping issues found, reported and fixed. guide 5.8.3 Safety inspections of the cargo pumproom — Pump room inspected per checklist; ventilation, gas detection, bilge alarm, glands and leaks checked, and every entry controlled. guide 5.8.4 Cargo machinery rooms safety inspections — Compressor and motor rooms inspected per checklist; ventilation, air locks, shaft seals, gas detection and leaks checked and recorded. guide 5.8.5 Safety inspection of the forecastle spaces — Forecastle inspected per checklist; stores secured, enclosed spaces controlled, windlass and hydraulics checked. guide 5.8.6 Safety inspections of the accommodation spaces — Accommodation inspected per checklist; electrical, fire, hygiene and escape hazards found, recorded and corrected. guide 5.8.7 Ballast and/or bunker pumproom safety inspection — Ballast/bunker pump room inspected per checklist; ventilation, gas checks, leaks and bilges controlled and recorded. guide 5.9.1 Lifting and rigging equipment procedures, maintenance and inspection — Every item in the register, marked with ID and SWL, certified and inspected; check before use and quarantine anything damaged. guide 5.9.2 Spare parts for a single cargo hose handling crane — RA identifies critical crane parts; minimum spares listed and on board; PMS inventory matches. guide 5.10.1 Pilot boarding arrangements — Certified ladder, secured to strong points at the right height, officer in attendance with radio, lifebuoy and light ready. guide 5.10.2 Accommodation ladders — Inspect, lower under control, angle within limits, net and lifebuoy rigged; annual exam and five-yearly test on record. guide 5.10.3 Safe access to the vessel while alongside a terminal/berth — Access rigged and secured, net and lifebuoy in place, adjusted for tide and draft, watched at all times. guide 5.10.4 Personnel transfer by crane — Transfer only with RA and approval; certified basket and crane, lifejackets, communications and a contingency plan. guide 5.10.5 Helicopter operations — ICS guide and company checklist followed: area cleared and marked, venting stopped, fire and rescue parties ready, comms agreed. guide 5.10.6 Helicopter facilities — Helicopter team trained and drilled; deck area marked and lit; firefighting and crash kit ready; ICS guide followed. guide 5.10.7 Escape routes — I can lead you out from my workplace by the marked route; doors open from inside, routes clear and lit. guide 5.11.1 Cargo and bunker sample management — Bunker samples kept 12 months, cargo samples in a ventilated locker in the cargo area, logged, and disposed ashore. guide 5.12.1 Respiratory protective equipment — Supplied-air only (SCBA/airline) for cargo work; filter respirators are not used; escape sets ready for toxic cargoes. guide 5.12.2 Decontamination showers and eyewash stations — Showers and eyewash by the manifold, marked, tested and freeze-protected; flush at least 15 minutes. guide 6. Pollution prevention 6.1.1 Cargo Record Book — Record every Annex II cargo operation promptly with the correct code; officer signs each entry, Master each page; entries match cargo documents. guide 6.1.2 Oil Record Book Part II — Each cargo, ballast, cleaning and slop operation is entered with the correct code, cross-checks with the ODME and ullage records, and is signed. guide 6.1.3 Oil Record Book Part I — Every machinery space oil operation is recorded with the right code, tank names match the IOPP Supplement, and quantities balance with soundings and receipts. guide 6.1.4 Garbage Record Book — Garbage is segregated by category as per the GMP, every disposal is logged with position and quantity, and hazardous items are landed ashore. guide 6.1.5 Ozone Depleting Substances Record Book — Every recharge, repair, leak and landing of ODS is logged in kg, and the equipment list matches the IAPP Supplement. guide 6.1.6 MARPOL Annex VI NOx Compliance and Record Keeping — Each engine has its EIAPP certificate, Technical File and parameter records up to date, and Tier III operation and failures are recorded and reported. guide 6.2.1 Flooding or accidental leakage of cargo pumproom bilges — Pumproom bilges can be pumped to the slop tank using remote-operated controls from outside the space, and the bilge alarms are tested and recorded. guide 6.2.2 Cargo system overboard and sea suction valves — Cargo-system sea and overboard valves closed, sealed and logged before transfer; the space between double valves regularly checked for leaks. guide 6.2.3 Bunker pipeline system pressure testing — Bunker lines are pressure tested to the company's stated pressure and interval, and the date, pressure, duration and result are recorded. guide 6.3.1 Ballast water management system (BWMS) — Operate the BWMS per the manual, record every operation and alarm, and report failures to the company and port State before discharging ballast. guide 6.4.1 Main deck oil or chemical spill clean up equipment — Stop, alarm, contain with scupper plugs; clean up with the spill kit in PPE suited to the SDS; drum waste for shore disposal. guide 6.4.2 Disposal of oily water in the forecastle and other internal spaces — Oily or polluted water from forward and internal bilges is pumped to a slop or waste tank or into drums, never overboard, and recorded. guide 6.5.1 Emergency arrangements to pump out the machinery space bilges — Marked emergency bilge suction ready on the largest sea water pump; oily discharge only to save ship or life, then record and report. guide 6.5.2 Incinerator operation — Trained engineers only, interlocks working, no prohibited items such as batteries or PVC, no burning in port, every burn and ash logged. guide 6.6.1 Oil filtering equipment — Calibrated 15 ppm alarm and three-way valve tested; overboard valve and flanges sealed; any defect or tampering stopped, recorded, reported. guide 6.6.2 Oil discharge monitoring and control system (ODME) — Flush and test the ODME, discharge only within MARPOL limits, stop at once on alarm or sighted oil, keep records three years. guide 7. Maritime security 7.1.1 Security threat and risk assessment during passage planning — Each leg of the passage plan has a security risk assessment with high-risk areas, reporting points and the measures to be taken. guide 7.2.1 Vessel hardening — Hardening follows the VHP before high-risk areas, with recorded checklists, physical barriers, a ready citadel and crew who know their roles. guide 7.2.2 Controlling access to the vessel — Check ID and purpose, log and badge every visitor, brief them on safety, and step up searches and controls with the security level. guide 7.3.1 Ship security reporting and communications — SSAS is a covert alert ashore, tested with prior notice; know your regional reporting centre and the CSO's 24-hour number. guide 7.4.1 Ship Security Officer (SSO) — SSO holds a VI/5 certificate, knows the SSP and contacts, keeps last-ten-port-call and drill records; crew know the alarm response. guide 7.5.1 Cyber security risk management — Keep an IT/OT register, approve and log external access, scan all USB media, train the crew, know critical system back-ups. guide 8. Cargo and ballast systems 8.1.1 Inert gas system usage on oil tankers — Tanks always inert: IG supplied at 5% O2 or less, tank O2 at 8% or less, positive pressure maintained; stop discharge if IG fails. guide 8.1.2 Crude Oil Washing operations (COW) — Plan COW per the approved manual, confirm tank O2 at 8% or less with IG running, watch pressure and leaks, record in Oil Record Book. guide 8.1.3 Cargo tank isolation from venting system — Isolation only with authority, locked, recorded, and each isolated tank still protected by its own P/V valve. guide 8.1.4 Oil cargo tank cleaning procedures — Written tank cleaning plan approved by the Master, atmosphere controlled and monitored throughout, slops and washings correctly recorded. guide 8.2.1 Chemical tanker inert gas system usage — Use the IBC Code and Certificate of Fitness to decide inerting/padding, verify O2 and pressure, record it, and stop discharge if IG fails. guide 8.2.2 Carriage of inhibited chemical cargoes — No inhibitor certificate, no loading; check inhibitor lifetime against the voyage, monitor temperature, respect oxygen and heat limits. guide 8.2.3 Procedures and Arrangements Manual — Every cargo checked against the Certificate of Fitness, IBC Code and latest MEPC.2 circular; P&A Manual stripping and prewash rules applied. guide 8.2.4 Chemical tank cleaning procedures — Plan from SDS and P&A Manual, brief the whole team, monitor flammable and toxic vapour, record washings correctly. guide 8.2.5 Chemical cargo compatibility charts — Check every cargo pair on the compatibility chart, segregate tanks, lines and vents, and document the check in the approved stowage plan. guide 8.2.6 Escape sets required by IBC Code — Escape set for every person on board, with eye and breathing protection suitable for all certified cargoes, checked and in date. guide 8.2.7 Safety equipment required by the IBC Code — IBC safety sets complete and ready: SCBAs charged and tested, showers and eyewash working, antidotes and resuscitator available. guide 8.2.8 Protective equipment required by the IBC Code — Select PPE from the SDS and resistance charts, inspect before use, don in the right order, store outside the accommodation. guide 8.3.1 Inert gas generator — Start, vent until O2 is 5% or less, then supply; test alarms and trips per PMS; stop discharge and isolate if the generator fails. guide 8.3.2 Nitrogen generator inert gas system — Nitrogen purity verified before use; ventilate the room; remember nitrogen leaks suffocate and the exhaust is oxygen-enriched. guide 8.3.3 Flue gas inert gas system — Know the path uptake to deck main, test alarms before each use, deliver only at 5% O2 or less, stop discharge if IG fails. guide 8.3.4 Cargo tank high level and overfill alarms — Alarms tested before loading, set points known and recorded, never isolated without Master's authority and alternative monitoring. guide 8.3.5 Gauging and sampling static accumulator cargo in non-inerted tanks — Non-inert tank with static accumulator: no conductive equipment during loading and for 30 minutes after, unless via sounding pipe; always bonded. guide 8.3.6 Loading static accumulator cargo into non-inerted tanks — Start slowly at about 1 m/s at the inlet until covered, avoid splash and water, then wait 30 minutes before gauging. guide 8.3.7 IGS oxygen analyser — Calibrate zero and span before each use, verify with a portable meter, log it; if the analyser fails, IG quality is unknown so stop supply. guide 8.3.8 Oil and Chemical Tanker ESD and/or cargo pump emergency stop controls — Know where every pump emergency stop is, what trips the pumps automatically, test them per procedure, inform CCR and terminal after use. guide 8.3.9 Pressure testing and inspection of cargo, inert gas and vapour pipelines — Cargo, vapour and IG lines tested at the company interval and pressure, inspected visually, and every test and repair recorded. guide 8.3.10 Vapour collection system — Vapour manifold identified, alarms tested, pressure limits agreed with the terminal, loading rate managed to keep tank pressure in range. guide 8.3.11 Oil and chemical tank cleaning in non-inert tanks — State the method (undefined or too lean), follow its restrictions, bond all machines and hoses, monitor gas and stop if limits are exceeded. guide 8.3.12 Portable ullage/temperature/interface (UTI) measurement and sampling equipment — Certified, calibrated UTI; pre-use checks done; bond first, then connect to the vapour lock; disconnect in reverse. guide 8.3.13 Secondary venting systems — Know the primary and secondary venting means, their settings in correct order, and set the line-up for each operation under control. guide 8.3.14 Cargo tank venting systems — Lift-check P/V valves before every operation, keep screens and drains clear, overhaul per PMS and record set pressures. guide 8.3.15 Deepwell pump cofferdam purging — Purge cofferdams at set intervals with the right medium and pressure, record leakage per pump, wear proper PPE, report rising leakage. guide 8.3.16 Inert gas system non-return devices — Deck seal and non-return valve stop gas backflow; check water level and alarm, inspect and overhaul per PMS. guide 8.3.17 Manifold reducers and spool pieces — Marked, tested steel reducers; correct gaskets; every bolt fitted and tight; supported properly; records available. guide 8.3.18 Inert gas system pressure/vacuum-breaking (P/V) device(s) — P/V breaker is the back-up for P/V valves; keep the liquid level and antifreeze correct and record checks. guide 8.3.19 Indicators and alarms for the inert gas system — Know every IGS alarm and set point, test and calibrate them per PMS, and switch to backup monitoring and restrict operations if one fails. guide 8.3.20 Connections and interconnections to/with the inert gas system piping — Know the emergency IG connections for double hulls and forepeak, the external supply point, and keep IG/cargo line interconnections positively isolated. guide 8.3.21 Cargo heating system — Plan heating within cargo, coating and adjacent-cargo limits, test coils before loading, monitor and record temperatures. guide 8.3.22 Cargo doping and additives — Dope only with written instructions and company approval, never blend at sea, follow SDS precautions and record the quantities. guide 8.3.23 Cargo tank temperature monitoring systems — Demonstrate the system, compare fixed sensors with a calibrated portable UTI, record the results and report faulty sensors. guide 8.3.24 Cargo manifold arrangements — Proper gaskets and full bolting, gauges fitted, drip trays clean, manifold watched continuously; stop at once if leaking. guide 8.3.25 Receiving nitrogen from shore — Agree nitrogen pressure and rate with the terminal, watch tank pressures, keep people away from vents. guide 8.4.1 Carriage of inhibited cargoes — Inhibitor certificate on board, lifetime covers voyage, keep oxygen very low, monitor for polymerisation. guide 8.4.2 Cargo sampling — Closed sampling in pressure-rated containers with face shield and cold gloves, after a briefing on the cargo hazards. guide 8.4.3 Segregating incompatible cargoes and refrigerants — Check cargo-to-cargo and cargo-to-refrigerant compatibility, segregate lines and plant, and document it in the plan. guide 8.4.4 Carriage of propylene oxide (PO) and/or ethylene oxide (EO) — Clean tanks, acceptable previous cargo, keep nitrogen pad and O2 low, dedicated hoses, monitor temperature. guide 8.4.5 Escape sets as required by the IGC Code — One self-contained escape set per person, eye and breathing protection, in date and charged. guide 8.4.6 Cargo tank insulation — Inspect insulation at every hold entry and at dry-dock, watch for cold spots and moisture, report and record defects. guide 8.4.7 Vent outlet protection screens or flame screens — Correct screen type for the cargo, intact and clear, inspected per PMS with spares on board. guide 8.5.1 Custody transfer measurement system (CTMS) — CTMS calibrated and certified, gauges compared before every transfer, discrepancies reported and recorded. guide 8.5.2 Gas Combustion Unit (GCU) — GCU controls tank pressure by burning excess boil-off; test trips, know manual mode and alternatives, vent only as last resort. guide 8.5.3 LNG gas fuel supply system — Gas detectors calibrated, duct ventilation working, master gas valve tested, fuel lines purged with nitrogen before maintenance. guide 8.5.4 Cold spots and cofferdam temperature monitoring and heating equipment — Monitor hull temperatures, keep cofferdam heating and standby running, report any cold spot to company and class at once. guide 8.6.1 Cargo tank overfill alarms — Independent alarms tested before loading, set to filling limits, overrides only with Master's permission and logged. guide 8.6.2 Cargo transfer Emergency Shut Down (ESD) — ESD closes valves and stops pumps; valves close within 30 seconds; test with shore before transfer; inhibit only on Master's written authority. guide 8.6.3 Cargo tank relief valves — Change relief settings only with approval, reset alarms to match, log it, test per PMS, keep enough relief capacity if one valve is out. guide 8.6.4 Cargo System Operation Manual — Ship-specific Cargo System Operation Manual kept in the CCR; know its contents and use it for every operation. guide 8.6.5 Maintaining the atmosphere in the interbarrier spaces and/or hold spaces — Keep the required inert or dry atmosphere, monitor gas, pressure and dew point, record trends and investigate any rise. guide 8.6.6 Cargo system alarm management — Know cargo alarm set points, investigate every alarm, inhibit only with Master's authority and log it. guide 8.6.7 Inert gas system — Deliver IG or nitrogen only within O2 and dew point limits, test alarms, ventilate the plant room, respect asphyxiation risk. guide 8.6.8 Gas vessel cargo manifolds — Watch for frost and gas, monitor strainer differential, purge with nitrogen before disconnecting, protect the hull from cold spills. guide 8.6.9 Manifold reducers, spool pieces and other portable pipework — Low-temperature-rated, marked and tested pieces, fitted with the right gaskets and every bolt. guide 8.6.10 Emergency discharge operations — Know the emergency discharge methods on board, keep the emergency pump gear ready, follow the manual's pressure limits. guide 8.6.11 Cargo and vapour pipeline insulation and expansion arrangements — Inspect pipe insulation and expansion supports regularly, look for ice and seized supports, report and repair defects. guide 8.6.12 IGC safety, rescue and recovery equipment — IGC safety sets complete, SCBAs charged and tested, stretcher and oxygen resuscitator ready, drills held. guide 8.6.13 Protective equipment required by the IGC Code — Choose PPE from the SDS, inspect it, don the full set correctly, store it outside the accommodation. guide 8.6.14 Reliquefaction plant — Know the plant, test trips and alarms, purge non-condensables to the vent mast, maintain per PMS. guide 8.6.15 Cargo heaters, vaporisers and condensers — Establish heating medium flow before cargo, monitor outlet temperatures, watch for tube leaks, maintain per PMS. guide 8.6.16 Filling Limits (FL) and Loading Limits (LL) — Loading limit is derived from the filling limit and density ratio at reference temperature; use the approved tables in every plan. guide 8.6.17 Vent mast fire suppression system — Know where and how to release the vent mast suppression, when to use it, and keep bottles checked and serviced. guide 8.6.18 Water or liquid cargo leakage into a hold or insulation space — Test level alarms, sound and monitor gas and dew point, remove water quickly, find the source and report. guide 8.6.19 Submerged motor electric cargo pumps — Megger before use, cool pump and confirm level before starting, test trips, respect the start limit, stop and investigate on low level. guide 8.6.20 Liquid line, hold, insulation and inter-barrier space relief valves — Know every line, hold and insulation space relief valve and its setting, test per PMS, never leave liquid trapped between closed valves. guide 8.6.21 Inerting, gas freeing and gassing up operations — Dry and inert to the set limits before gassing up, cool down at the manual's rate, never load below the certified minimum temperature. guide 8.7.1 BLS Emergency Shut Down (ESD) systems — Know ESD levels and what each does, test them before each offshore loading, maintain per PMS. guide 8.7.2 Checks when approaching an offshore terminal — Complete the arrival and DP checklists, test BLS, ESD and telemetry, confirm weather is within limits before approach. guide 8.7.3 Control and monitoring of the Bow Loading System (BLS) — Green line means all loading conditions safe; know its inputs and stop loading if it is lost. guide 8.7.4 Bow Loading System (BLS) operation, inspection, testing and maintenance — Test BLS alarms and indicators before each loading, maintain coupler and hydraulics per PMS, keep the area clean and leak-free. guide 8.7.5 Deluge system in the bow loading system (BLS) area — Know what the BLS deluge covers and how to activate it, flow-test it per PMS and keep nozzles clear. guide 8.7.6 Fixed foam fire extinguishing system in the bow loading system (BLS) area — Know the BLS foam system coverage and start-up, test the foam concentrate, maintain it per PMS. guide 8.7.7 DP Equipment condition and maintenance — All DP equipment in the PMS and maintained, defects assessed against capability, trials current. guide 8.7.8 DP FMEA — Latest FMEA on board including modifications; know worst-case failure, thruster fail-safe modes and closed bus risks. guide 8.7.9 Gas and fire detection systems in the bow loading system (BLS) area — Know BLS gas and fire detector locations and alarm actions, calibrate and test them per PMS, stop loading on alarm. guide 8.8.1 Cargo hold hatch covers — Inspect seals and cleats, test tightness, keep tank pressure within the range for effective hatch sealing. guide 8.8.2 Changing between wet and dry cargoes — Use ship-specific checklists, gas-free and certify before dry cargo, isolate lines, record each stage. guide 8.99.1 Cargo and ballast transfer planning and execution — Written plan with stability and stress at each stage, agreed with terminal, signed by all officers, followed and re-approved on changes. guide 8.99.2 Ship/Shore Safety Checklist (SSSCL) — Complete the relevant SSSCL parts honestly, keep agreements, do and sign the repeat checks at the agreed interval. guide 8.99.3 Cargo operations team composition — Follow company supervision levels, Chief Officer present at critical stages, rest hours kept, SIMOPS assessed and approved. guide 8.99.4 Cargo and ballast valve testing — Test valves before operations, compare remote and local indication, know how to operate valves with the hand pump. guide 8.99.5 Fixed cargo tank level gauging system — Compare fixed gauges with portable UTI regularly, know alarm settings, report defects and use extra manual gauging until fixed. guide 8.99.6 Stability and loading instrument(s) — Test the loading instrument with approved test conditions at the set interval, record it, and know how to check damage stability. guide 8.99.7 Loading limitations — Know the ship's restrictions, build them into every plan, and check stability at each intermediate stage, not just the end. guide 8.99.8 Cargo Transfer hoses — Right hose for the cargo and pressure, inspected before use, tested and recorded, stored supported and capped, retired on criteria. guide 8.99.9 Cargo and ballast system controls, indicators, mimics and displays — Compare remote indicators with local readings regularly, calibrate per PMS, keep mimic and pipeline diagrams current and legible. guide 8.99.10 Cargo system bonding arrangements — Inspect bonding straps, test resistance at the set interval, replace damaged straps and refit after any pipe work. guide 8.99.11 Independent verification of cargo piping systems line up — Independent second-person check of every valve, drain, sample point and blank against the plan before starting and after each change. guide 9. Mooring and anchoring 9.1.1 Testing and correct operation of the mooring winch brakes — Brakes are tested yearly, after maintenance and after slippage, set to 60% of SDMBL, applied correctly, and lines are reeled in the correct direction. guide 9.1.2 Was the vessel satisfactorily moored — Check the terminal plan against the MSMP before berthing, moor to an agreed configuration, no mixed lines per direction, tend evenly. guide 9.1.3 Line Management Plan (LMP) implementation — The LMP tracks every line, tail and shackle by location and certificate, with recorded inspections, rotation and retirement criteria. guide 9.1.4 Mooring lines, tails and mooring shackles — Every line, tail, shackle and spare is certified, matched to the SDMBL as MEG4 requires, and in good condition. guide 9.2.1 Emergency towing procedure and equipment — Know the ship-specific Emergency Towing Booklet; the forward and aft gear is maintained and ready to deploy without main power; drills are recorded. guide 9.3.1 Anchoring operations — Plan within the windlass limits, walk back in deep water, keep the brake tested and adjusted, keep a proper anchor watch, and record it all. guide 9.4.1 Mooring team supervision and composition — Each mooring and anchoring station has the required officer and team as the procedure sets, with manning, briefings and rest hours recorded. guide 9.4.2 Dangers of working with and around mooring lines — Toolbox talk before every mooring; treat the whole deck as snap-back danger; never step over tensioned lines; declutch drums, pins fitted. guide 9.5.1 STS operations checklists — Use and sign the industry STS guide checklists at each stage, record the whole operation, notify the coastal state, and keep the records three years. guide 9.5.2 STS Joint Plan of Operation (JPO) — Have an accurate, operation-specific JPO on board, brief everyone on it, and stop the operation when its limits are exceeded. guide 9.5.3 STS Operations Plan — The ship-specific STS Operations Plan is kept on the bridge and in the CCR, and all crew know its content and their own role. guide 9.6.1 Vapour hose securing arrangement for buoy moorings — Vapour manifold clearly identified, with saddle, strong points and a crane able to hold the buoy vapour hose off the flange. guide 9.6.2 SPM mooring arrangements — Know the SPM hook-up sequence and your role, keep clear of rope and chain, and ensure the HVPQ matches the fitted stoppers. guide 9.7.1 Shuttle tanker bow mooring system — Keep the chafe chain locked in the stopper, know the manual brake release and line cutter, and test the bow system before every offshore call. guide 10. Machinery spaces 10.1.1 Chief Engineer's standing and daily orders — Signed, ship-specific Standing Orders plus daily orders; every engineer has signed and can quote when to call the Chief Engineer. guide 10.1.2 Testing main propulsion, steering gear, thrusters & power generation plant — We test steering, main engine, thrusters and generators before departure and arrival using checklists; entries in both logs match and I can steer locally. guide 10.1.3 Periodic rounds of machinery space for non-UMS vessels — Rounds are made every watch per the SMS; we check temperatures, pressures, leaks, bilges and fire risks, log readings and report anything abnormal. guide 10.1.4 Periodic machinery space rounds during both manned and unmanned (UMS) periods — Before UMS we complete the checklist, select the duty engineer and inform the bridge; alarms during UMS are attended, logged and explained. guide 10.1.5 Local control of propulsion machinery — I can switch to engine-side control, start, reverse and change speed following the emergency telegraph; local control is tested and recorded in the PMS. guide 10.2.1 Emergency generator — Starts automatically on blackout and connects in 45 s; I can start it manually by both means; weekly and on-load tests are recorded. guide 10.2.2 Battery emergency source of power — Batteries are checked and logged per the PMS, kept charged and clean, and tested in blackout simulations to prove they carry emergency loads. guide 10.2.3 Exhaust gas cleaning system (EGCS) — We run and calibrate the scrubber per its approved manuals; if it fails we switch to compliant fuel, record it and notify the authorities. guide 10.2.4 seawater pipelines — Seawater lines are inspected under the PMS; any defect is reported and repaired properly, and we keep no unreported temporary repairs. guide 10.2.5 Bilge monitoring devices — I test the bilge alarms in my area by physically operating the float, confirm the alarm at bridge/ECR/CCR and record it in the PMS. guide 10.2.6 Emergency compressed air machinery starting system — The emergency compressor and receiver are tested under the PMS; I can charge the receiver and start a generator from dead ship. guide 10.3.1 Switchboard deck insulation — Approved insulating mats cover the deck front and rear of every switchboard; they are kept clean, undamaged and checked during inspections. guide 10.3.2 Electrical distribution system switchboard earth monitoring — Our insulation monitors are set per maker for each voltage; earth faults are logged, traced by isolating circuits and cleared promptly. guide 10.3.3 Entry into the machinery space during UMS — Inform the bridge, switch on the dead man alarm and reset it within the interval; inform the bridge again when leaving. It is tested regularly. guide 10.3.4 Engineers' alarm — Activated from the ECR to summon all engineers urgently; tested regularly so it is heard in every cabin, and each test is recorded. guide 10.3.5 Machinery alarm — Alarms go to the ECR, bridge and duty engineer, escalating if not acknowledged; we test them under the PMS and control every inhibited alarm. guide 10.3.6 Watertight doors — Watertight doors are kept closed at sea, tested and inspected regularly, and I can operate them remotely and locally, including with the hand pump. guide 10.3.7 Gas welding and cutting equipment — Arrestors fitted and hoses checked; spare oxygen and acetylene stored apart, secured, on deck or in a ventilated store outside ER and accommodation. guide 10.3.8 Electric welding equipment — Dry PPE, insulated holder, return clamp close to the job, hot work permit and fire watch; precautions are posted at the welding machine. guide 10.4.1 Planned maintenance system (PMS) — Every job, part used and running hour goes into the PMS; overdue or deferred jobs need office approval; critical spares stay above minimum. guide 10.4.2 Lube oil and hydraulic oil analysis program — Oil samples are taken on schedule from all main systems; every report is reviewed, trended and abnormal results are acted on and recorded. guide 10.5.1 Conventional bunkering operations — Every bunkering has a signed plan and checklist; I know my duty, the tank limits and how to stop the transfer on any leak. guide 10.5.2 Bunker fuel oil sampling and analysis — Samples are drip-taken at our manifold throughout delivery, sealed and logged; MARPOL sample kept 12 months and analysis results acted on before use. guide 10.5.3 Fuel change over procedures — We calculate start time so the system is flushed before the ECA; date, time, position and tank volumes are logged per MARPOL Annex VI. guide 10.6.1 LNG fuel tank water-spray system — The water spray cools and protects the LNG fuel tank; I can start the pumps, set and drain the valves; tests are recorded. guide 10.6.2 LNG gas fuel bunkering ESD system — Press the ESD for any leak, fire, gas alarm or unsafe situation; it is tested with the supplier before every bunkering and closing times recorded. guide 10.6.3 LNG (or other low-flashpoint fuel) bunkering procedures — Signed plan and checklist every time; ESD tested, connection purged and leak tested, tank pressure monitored, safety zone enforced. guide 10.6.4 LNG fuel bunkering control station and manifold — The LNG bunker station has working drip trays, water curtain, gas detection, ESD and fire-fighting equipment, all tested before bunkering and recorded. guide 10.7.1 Remote controls for fuel and lube oil system valves — The pump stops and QCV controls are outside the engine room; they cut fuel and lube oil in a fire, are labelled and tested regularly. guide 10.7.2 Fire prevention in machinery spaces - hot surfaces and oil spray — Hot surfaces are insulated, HP fuel pipes are jacketed with leak alarms, flanges have spray protection, and leaks are fixed and cleaned immediately. guide 10.7.3 Main engine crank case monitoring — OMD tested with the maker's kit and logged; on alarm: slow down, inform bridge, stop safely, keep clear until the crankcase cools. guide 10.7.4 Hydraulic power packs fire protection measures — Our hydraulic power packs are shielded, covered by detection and fire protection, checked for leaks every round and their alarms are tested. guide 11. General appearance and condition (photographs) 11.1.1 Bow area from dead ahead — The bow looks as in the photo: markings legible, anchors secured, coating maintained and any damage reported. guide 11.1.2 Hull forward end starboard side — The starboard forward hull matches the photo: markings clear, coating maintained, any damage reported and assessed. guide 11.1.3 Hull forward end port side — The port forward hull matches the photo: markings clear, coating maintained, any damage reported and assessed. guide 11.1.4 Hull aft end starboard side — The starboard aft hull matches the photo: markings clear, coating maintained, any damage reported and assessed. guide 11.1.5 Hull aft end port side — The port aft hull matches the photo: markings clear, coating maintained, any damage reported and assessed. guide 11.1.6 Transom from right astern — The transom matches the photo: name legible, coating maintained, fittings and lights intact, any damage reported. guide 11.1.7 Forecastle port side looking towards fairleads — The port forecastle matches the photo: fairleads and rollers free and smooth, bitts sound, deck coated and tidy. guide 11.1.8 Forecastle starboard side looking towards fairleads — The starboard forecastle matches the photo: fairleads and rollers free and smooth, bitts sound, deck coated and tidy. guide 11.1.9 Port or starboard windlass — The windlass matches the photo: no leaks, brake and linings in good order, stopper secured and maintenance recorded. guide 11.1.10 Forward main deck showing condition of deck (and external framing) — The forward main deck matches the photo: coating maintained, framing sound, walkways and fittings in good order. guide 11.1.11 Forward main deck showing condition of Piperack — The forward pipe rack matches the photo: pipes and supports coated and sound, no temporary repairs, lines tested and recorded. guide 11.1.12 One mooring winch including the brake setting arrangement — The winch matches the photo: brake linings and setting marks in good order, brake tested on schedule, no leaks. guide 11.1.13 One hose crane with an overall view — The hose crane matches the photo: structure sound, SWL marked, certificates valid and no hydraulic leaks. guide 11.1.14 One hose crane hoisting winch, stowed wire and limit switches — The hoist wire is greased and undamaged, spooled correctly, with a certificate; limit switches are tested and work. guide 11.1.15 Starboard manifold looking from aft to forward — The starboard manifold matches the photo: blanks fully bolted, drip tray clean, gauges calibrated and coating maintained. guide 11.1.16 Starboard manifold looking forward to aft — The starboard manifold matches the photo: blanks fully bolted, drip tray clean, gauges calibrated and coating maintained. guide 11.1.17 Aft main deck showing condition of deck (and external framing) — The aft main deck matches the photo: coating maintained, framing sound, walkways and fittings in good order. guide 11.1.18 Aft main deck showing condition of Piperack — The aft pipe rack matches the photo: pipes and supports coated and sound, no temporary repairs, lines tested and recorded. guide 11.1.19 Poop deck looking from midships to starboard including fairleads — The poop deck matches the photo: fairleads and rollers free, deck coated, mooring area tidy and equipment maintained. guide 11.1.20 Aft emergency towing equipment storage arrangement — The aft emergency towing gear is stowed and protected as in the photo, inspected regularly and backed by the ship's towing procedure. guide 11.1.21 Aft emergency towing equipment deployment system — The aft towing gear deploys as described in the ship's procedure; route clear, release free and drills recorded. guide 11.1.22 Lifeboat and davit — The lifeboat and davit match the photo: condition sound, falls in date, release gear serviced and drills recorded. guide 11.1.23 The emergency generator or accumulator batteries — The emergency generator/battery room matches the photo: clean, ventilated, ready to run and tested on schedule. guide 11.1.24 Engine room general view showing top of main engine — The engine room top matches the photo: clean, no leaks, hot surfaces insulated and no loose items. guide 11.1.25 One generator engine — The generator matches the photo: clean, leak-free, insulated, gauges working and maintenance current. guide 11.1.26 The oil filtering equipment — The separator and 15 ppm meter match the photo, with no bypass possible; calibration, alarm test and ORB entries are in order. guide 11.1.27 The incinerator — The incinerator matches the photo: clean, safe, instructions posted and use correctly recorded in the record books. guide 11.1.28 One boiler from the front — The boiler front matches the photo: clean, no leaks, gauge glasses clear and safety devices tested and recorded. guide 11.1.29 One boiler from the top showing control equipment — The boiler top matches the photo: controls and safety valves in good order, no leaks and tests recorded. guide 11.1.30 Purifier room general view — The purifier room matches the photo: clean, leak-free, fire protection working and door closing properly. guide 11.1.31 Main engine side showing local control station — The main engine local control station matches the photo: working indicators and telegraph, instructions posted and tests recorded. guide 11.1.32 Steering gear room general view showing access — The steering gear room matches the photo: clean, access clear, instructions posted and emergency steering drills recorded. guide 11.1.33 Main steering gear — The steering gear matches the photo: no leaks, oil levels correct, greased, and tested before every departure. guide 11.1.40 IG system pressure/vacuum-breaking (P/V) device — The P/V breaker matches the photo: correct liquid level, clean outlet and inspected regularly as part of the IG system. guide 11.1.41 IG system first non-return device (deck seal or double block and bleed arrangement) — The deck water seal (or DBB valves) matches the photo: level and alarms working, no corrosion, inspected regularly. guide 11.1.42 One main cargo pump and, if in pump room, including bilges — The cargo pump matches the photo: no leaks, temperature sensors working and pump room bilges clean and dry. guide 11.1.50 A cargo tank liquid dome including load and discharge valve — The liquid dome matches the photo: valves and insulation in good order, ESD tested and no leaks or corrosion. guide 11.1.51 Electric motors for deepwell pumps — The deepwell pump motors match the photo: sound casings, sealed glands, greased bearings and insulation tests recorded. guide 11.1.52 Compressor / motor room — The compressor and motor rooms match the photo: clean, seals and air locks working, gas detection and ventilation tested. guide 11.1.60 A cargo tank liquid dome including load and discharge valve — The liquid dome matches the photo: valves and insulation in good order, ESD tested and no leaks or corrosion. guide 11.1.61 Electric motors for deepwell pumps — The deepwell pump motors match the photo: sound casings, sealed glands, greased bearings and insulation tests recorded. guide 11.1.62 Compressor room internal view — The compressor room matches the photo: clean, no leaks, ventilation and gas detection working and tested. guide 11.1.70 A cargo tank liquid dome including load and discharge valve — The liquid dome matches the photo: valves and insulation in good order, ESD tested and no leaks or corrosion. guide 11.1.71 A cargo tank vapour dome including cargo system relief valves — The vapour dome matches the photo: relief valves in date and set correctly, insulation intact, no corrosion. guide 11.1.72 Compressor house internal view — The compressor house matches the photo: clean, no leaks, ventilation and gas detection working and tested. guide 11.1.80 A cargo tank liquid dome including load and discharge valve — The liquid dome matches the photo: valves and insulation in good order, ESD tested and no leaks or corrosion. guide 11.1.81 General view of one moss sphere — The Moss sphere cover matches the photo: coating maintained, seals intact and inspections recorded. guide 11.1.82 Compressor house internal view — The compressor house matches the photo: clean, no leaks, ventilation and gas detection working and tested. guide 11.1.90 Bow mooring arrangement from forward looking aft showing chain stopper — The bow chain stopper matches the photo: locking mechanism working, no leaks and tests recorded. guide 11.1.91 Bow mooring arrangement from aft looking forward showing winch — The bow loading winch matches the photo: brake tested, no leaks and messenger lines in good condition. guide 11.1.92 General view of hose connection area — The hose connection area matches the photo: clean, drip tray drained, gas detection and fire-fighting ready. guide 11.1.93 Hose coupling arrangement — The hose coupler matches the photo: seals and jaws in good condition, emergency release tested before every loading. guide 11.1.94 General view forward bow thruster room — The bow thruster room matches the photo: clean, dry bilges, no leaks and alarms tested. guide 11.1.95 Forward bow thruster room showing one azimuth thruster — The azimuth thruster matches the photo: no leaks, oil levels correct and tested before DP or bow loading operations. guide 12. Ice operations 12.1.1 Polar Code training — Master and Chief Officer hold advanced polar training and watch officers basic training, matched to the ice conditions in the voyage plan. guide 12.2.1 Life-saving and fire-fighting systems and equipment in sub-zero temperatures — Drain deck fire and foam lines, keep lifeboat engines heated and batteries charged, protect hoses and extinguishers, and de-ice LSA regularly. guide 12.3.1 Engine room machinery and systems in sub-zero temperatures — Recirculate warm water to sea chests, keep fuel above its pour point, heat emergency machinery spaces and manage ventilation. guide 12.4.1 Cargo and ballast systems in sub-zero temperatures — Keep ballast, vents, P/V valves and deck seal ice-free, drain deck lines and water spray, and record the cold-weather checks. guide 12.5.1 Deck machinery and mooring equipment in sub-zero temperatures — Heat the hydraulics, run the winches regularly, keep brakes and drums free of ice, and protect mooring lines. guide 12.6.1 Navigating in areas affected by ice — Plan with current ice information, stay within the ice class and POLARIS limits, reduce speed, double the lookout, and follow icebreaker instructions. guide An independent guide written by seafarers for seafarers. It is not affiliated with or endorsed by OCIMF and does not reproduce the SIRE 2.0 Question Library: questions are put in our own words. The official library and guidance are published by OCIMF (ocimf.org ). Always follow your company's SMS.
Your ship's manuals, searchable Upload your ship's manuals and ask about your equipment: every answer shows the page in the original. Free to start.
Start free