Zhongde LYF2.0/300-0.7

Composite boiler (oil-fired and exhaust gas)

The Zhongde LYF2.0/300-0.7 is a vertical composite boiler: an oil-fired section with a SAACKE SKVJ-15 rotary cup burner and an exhaust gas section heated by main engine exhaust. It can run oil-fired, combined or on exhaust gas only, producing saturated steam at 0.7 MPa. Feed is on/off controlled by a float level transmitter, and surplus exhaust-gas steam is dumped to a condenser by a pneumatic dump valve. The manual covers design data, erection and supports, reflex water level gauges, feed and boiler water treatment limits, safety valves, level transmitter testing, accessories (salinometer, oil detector, sample cooler, dosing pump, test cabinet), CR2 feed pumps, steam dump adjustment, spare parts, and the start-up, operation and daily maintenance instructions with alarm and trip set points.

Kliknij część na modelu, aby zobaczyć jej numer i przeznaczenie.Otwórz trenażer 3D

Procedury obsługi

Light-up and raising steam (oil-fired)

  1. Check the isolating valve is open and the pressure gauge reads zero. s. 91
  2. Fill to between low and medium water level; test both water level gauges by opening and closing the upper and lower cocks alternately. s. 91
  3. Open the air vent on top and keep it open until steam comes out. s. 91
  4. Raise temperature slowly: about 1.5 hours to working pressure. s. 91
    Fast firing damages the heating surfaces
  5. Near 0.7 MPa blow down all blowdown valves and gauge cocks to clear dirt. s. 92
  6. Drain and warm the steam lines with a small flow, then open line valves fully. s. 92

Blowing down the water level gauge

  1. Water side: shut cock S, open cock W, open drain cock D briefly; repeat so the level rises and falls. s. 13
  2. Steam side: shut cock W, open cock S and blow through drain D for 1–2 seconds only. s. 14
    Longer steam blowing shortens glass life
  3. Return both cocks to the operating position and check the level settles. s. 14

Replacing the reflex gauge glass

  1. Shut cocks S and W and open drain D until the glass is empty. s. 14
  2. Remove nuts and lift off the gauge body; remove screws, cover plate, glass and gaskets. s. 14
  3. Clean sealing faces and check for scars; fit sealing gasket, new reflex glass and cushion gasket, then the cover plate. s. 15
  4. Tighten screws evenly from the centre outwards to 60 Nm. s. 15

Daily level transmitter function test

  1. With the boiler steaming, slowly close the upper shut-off valve: the level rises and the feed pumps must stop at high level. s. 24
  2. Close the lower shut-off valve and open the drain slowly: the stand-by pump start and low level alarms must operate in turn. s. 24
  3. Reopen both shut-off valves and close the drain. s. 24

Emergency: water below the gauge glass

  1. Stop the burner at once through the burner control. s. 92
    Do not feed cold water into an overheated boiler before it is checked
  2. Close the steam valve gradually and only restart after the boiler has cooled and been inspected. s. 92

Interwały obsługi technicznej

ElementKiedyCzynnośćInstrukcja
Feed and boiler waterDailyAnalyse with the test cabinet and adjust chemical dosings. 19
Level transmitterDailyFunction test of high level, stand-by pump start and low level alarmss. 24
Water level gaugeEvery hour in service / before light-up and shut-downBlow through and check reading; renew a cracked glass at onces. 92
Bottom blowdownEvery morning, then every 8 h (at least weekly 1 min per valve)Blow down until clean water, then refills. 92
Scum (surface) blowdownEvery 4–8 h (at least weekly 2 min)Skim; immediately if oil contamination (brown water) is seens. 92
Exhaust gas tubesWeeklyBlow ash off with compressed air or steam through the smoke box doors. 93
Furnace and oil-fired smoke tubesMonthlyInspect furnace and refractory for coke; clean smoke tubess. 93
Salinity and oil detectionMonthlyCheck functions. 19
Water side, hotwell and dosing pumpYearlyInspect for corrosion and scale, check injection pumps. 19

Usterki i co robić

Dane techniczne

Steam output, oil-fired section2000 kg/hs. 4
Steam output, exhaust gas section (85 % MCR)1500 kg/hs. 4
Working / design / test pressure0.7 / 0.8 / 1.2 MPas. 4
Feed water temperature60 °Cs. 4
Steam temperature at working pressure170 °Cs. 5
Exhaust gas inlet temperature280 °Cs. 5
Diameter / height2956 mm / 6340 mm (excl. insulation and mountings)s. 4
BurnerSAACKE SKVJ-15 rotary cup, fuel about 160 kg/hs. 88
Feed water pumpsGrundfos CR2-150, 3 m³/h, 130 m, 3 kW, 440 V 60 Hzs. 54
Water level set points+90 mm high alarm, +50 mm feed pump stop, −50 mm feed pump start, −110 mm low-low level burner stops. 94
Burner pressure switchstop at 0.74 MPa, start at 0.55 MPas. 94
Safety valveopens 0.77 MPa, reseats 0.67–0.69 MPas. 94
Steam dump valveSAUTER V6G DN40 with XSP 31 positioner; opens 0.2–0.5 bar above working pressure, 1.2 bar control airs. 64
Water level gauge bolts60 Nm, cold or hots. 13
Boiler water pH / P-alkalinity / phosphatepH 10.5–11.5, P-alkalinity 100–150 ppm CaCO3, phosphate 20–50 ppms. 18
Boiler water chloride / conductivity< 100 ppm Cl, < 2000 µS/cms. 18
Feed waterhardness 0–0.5 ppm CaCO3, chloride < 15 ppm, pH 8.5–9.5, no oils. 18
Hydrazine excess (or sulphite)0.1–0.2 ppm N2H4 (sodium sulphite 30–60 ppm)s. 18

Części zamienne i numery katalogowe

CzęśćNumerSzt.Instrukcja
Safety valve spring25.9121s. 81
Reflex glass (water level gauge)KD 8 - IX2s. 81
Gasket set, water level gaugeKD 8 - IX4s. 81
Gland ring, water level gaugeKD 86s. 81
Pressure gauge 0–1.6 MPaK.11801s. 81
Tube plug, boiler tube10–15s. 81
Manhole gasket 296 x 396 x 34s. 81
Handhole gasket 86 x 100 x 312s. 81
Pressure transmitter EMP 2B.30451s. 85
Pressure switch RT 116B.30013s. 85
Self-monitoring low level electrode NRG 16-11S1s. 60
Level switch NRS 1-7b1s. 61
Conductivity electrode ERL 16-11s. 40

Źródło: instrukcja producenta „EM-3 ZHONGDE BOILER”, 96 stron. Numery stron według oryginału. Przed pracą sprawdź instrukcję na statku.

Strona przetłumaczona automatycznie. Numery części, kody i strony są jak w oryginale.