The Zhongde LYF2.0/300-0.7 is a vertical composite boiler: an oil-fired section with a SAACKE SKVJ-15 rotary cup burner and an exhaust gas section heated by main engine exhaust. It can run oil-fired, combined or on exhaust gas only, producing saturated steam at 0.7 MPa. Feed is on/off controlled by a float level transmitter, and surplus exhaust-gas steam is dumped to a condenser by a pneumatic dump valve. The manual covers design data, erection and supports, reflex water level gauges, feed and boiler water treatment limits, safety valves, level transmitter testing, accessories (salinometer, oil detector, sample cooler, dosing pump, test cabinet), CR2 feed pumps, steam dump adjustment, spare parts, and the start-up, operation and daily maintenance instructions with alarm and trip set points.

点击模型上的零件,查看编号和用途。打开 3D 训练

保养规程

Light-up and raising steam (oil-fired)

  1. Check the isolating valve is open and the pressure gauge reads zero. 第 91 页
  2. Fill to between low and medium water level; test both water level gauges by opening and closing the upper and lower cocks alternately. 第 91 页
  3. Open the air vent on top and keep it open until steam comes out. 第 91 页
  4. Raise temperature slowly: about 1.5 hours to working pressure. 第 91 页
    Fast firing damages the heating surfaces
  5. Near 0.7 MPa blow down all blowdown valves and gauge cocks to clear dirt. 第 92 页
  6. Drain and warm the steam lines with a small flow, then open line valves fully. 第 92 页

Blowing down the water level gauge

  1. Water side: shut cock S, open cock W, open drain cock D briefly; repeat so the level rises and falls. 第 13 页
  2. Steam side: shut cock W, open cock S and blow through drain D for 1–2 seconds only. 第 14 页
    Longer steam blowing shortens glass life
  3. Return both cocks to the operating position and check the level settles. 第 14 页

Replacing the reflex gauge glass

  1. Shut cocks S and W and open drain D until the glass is empty. 第 14 页
  2. Remove nuts and lift off the gauge body; remove screws, cover plate, glass and gaskets. 第 14 页
  3. Clean sealing faces and check for scars; fit sealing gasket, new reflex glass and cushion gasket, then the cover plate. 第 15 页
  4. Tighten screws evenly from the centre outwards to 60 Nm. 第 15 页

Daily level transmitter function test

  1. With the boiler steaming, slowly close the upper shut-off valve: the level rises and the feed pumps must stop at high level. 第 24 页
  2. Close the lower shut-off valve and open the drain slowly: the stand-by pump start and low level alarms must operate in turn. 第 24 页
  3. Reopen both shut-off valves and close the drain. 第 24 页

Emergency: water below the gauge glass

  1. Stop the burner at once through the burner control. 第 92 页
    Do not feed cold water into an overheated boiler before it is checked
  2. Close the steam valve gradually and only restart after the boiler has cooled and been inspected. 第 92 页

保养周期

项目周期操作说明书
Feed and boiler waterDailyAnalyse with the test cabinet and adjust chemical dosing第 19 页
Level transmitterDailyFunction test of high level, stand-by pump start and low level alarms第 24 页
Water level gaugeEvery hour in service / before light-up and shut-downBlow through and check reading; renew a cracked glass at once第 92 页
Bottom blowdownEvery morning, then every 8 h (at least weekly 1 min per valve)Blow down until clean water, then refill第 92 页
Scum (surface) blowdownEvery 4–8 h (at least weekly 2 min)Skim; immediately if oil contamination (brown water) is seen第 92 页
Exhaust gas tubesWeeklyBlow ash off with compressed air or steam through the smoke box door第 93 页
Furnace and oil-fired smoke tubesMonthlyInspect furnace and refractory for coke; clean smoke tubes第 93 页
Salinity and oil detectionMonthlyCheck function第 19 页
Water side, hotwell and dosing pumpYearlyInspect for corrosion and scale, check injection pump第 19 页

故障及处理方法

技术参数

Steam output, oil-fired section2000 kg/h第 4 页
Steam output, exhaust gas section (85 % MCR)1500 kg/h第 4 页
Working / design / test pressure0.7 / 0.8 / 1.2 MPa第 4 页
Feed water temperature60 °C第 4 页
Steam temperature at working pressure170 °C第 5 页
Exhaust gas inlet temperature280 °C第 5 页
Diameter / height2956 mm / 6340 mm (excl. insulation and mountings)第 4 页
BurnerSAACKE SKVJ-15 rotary cup, fuel about 160 kg/h第 88 页
Feed water pumpsGrundfos CR2-150, 3 m³/h, 130 m, 3 kW, 440 V 60 Hz第 54 页
Water level set points+90 mm high alarm, +50 mm feed pump stop, −50 mm feed pump start, −110 mm low-low level burner stop第 94 页
Burner pressure switchstop at 0.74 MPa, start at 0.55 MPa第 94 页
Safety valveopens 0.77 MPa, reseats 0.67–0.69 MPa第 94 页
Steam dump valveSAUTER V6G DN40 with XSP 31 positioner; opens 0.2–0.5 bar above working pressure, 1.2 bar control air第 64 页
Water level gauge bolts60 Nm, cold or hot第 13 页
Boiler water pH / P-alkalinity / phosphatepH 10.5–11.5, P-alkalinity 100–150 ppm CaCO3, phosphate 20–50 ppm第 18 页
Boiler water chloride / conductivity< 100 ppm Cl, < 2000 µS/cm第 18 页
Feed waterhardness 0–0.5 ppm CaCO3, chloride < 15 ppm, pH 8.5–9.5, no oil第 18 页
Hydrazine excess (or sulphite)0.1–0.2 ppm N2H4 (sodium sulphite 30–60 ppm)第 18 页

备件与目录号

零件编号数量说明书
Safety valve spring25.9121第 81 页
Reflex glass (water level gauge)KD 8 - IX2第 81 页
Gasket set, water level gaugeKD 8 - IX4第 81 页
Gland ring, water level gaugeKD 86第 81 页
Pressure gauge 0–1.6 MPaK.11801第 81 页
Tube plug, boiler tube10–15第 81 页
Manhole gasket 296 x 396 x 34第 81 页
Handhole gasket 86 x 100 x 312第 81 页
Pressure transmitter EMP 2B.30451第 85 页
Pressure switch RT 116B.30013第 85 页
Self-monitoring low level electrode NRG 16-11S1第 60 页
Level switch NRS 1-7b1第 61 页
Conductivity electrode ERL 16-11第 40 页

来源:制造商说明书《EM-3 ZHONGDE BOILER》,共 96 页。页码以原文为准。作业前请核对船上的说明书。