SeaVint

Hamworthy Super Trident ST6A

生化污水处理装置,IMO MEPC.2(VI)

The Hamworthy Super Trident ST6A treats ship sewage by aerobic digestion before overboard discharge. The tank has three compartments: aeration (air from a rotary compressor through ceramic diffusers feeds the bacteria), settling (activated sludge settles and is returned by air-lifts, a skimmer removes scum) and chlorine contact (effluent flows through a tablet chlorinator and is discharged by a close-coupled pump controlled by float switches). Designed for 9.36 m³ per day and 6 kg BOD per day, approved to IMO MEPC.2(VI) and MED. The manual covers technical data, peak loading, installation and venting, commissioning, chlorine residual testing, desludging (overboard or to the incinerator), weekly to annual maintenance, diffuser replacement, troubleshooting and the discharge pump and blower spares.

点击模型上的零件,查看编号和用途。打开 3D 训练

保养规程

Commissioning the unit

  1. Open all air line valves except the standby compressor delivery; start the duty compressor and check rotation by hand over the inlet (suction = correct). 第 50 页
  2. Close the compressor discharge to check the relief valve lifts and reseats; repeat on the standby compressor. 第 50 页
  3. Part fill with water to cover the diffusers and confirm air at each diffuser; select AUTO and No. 1 duty discharge pump. 第 50 页
  4. Close hatches and valves 1, 3, 4, 6; open 2 and 5 and fill with clean sea or fresh water until it flows over the skimmer and through the chlorinator. 第 50 页
  5. Set the sludge return air-lift as high as possible without the liquor turning clear; set the skimmer air-lift to the minimum reliable flow. 第 50 页
  6. Prime the discharge pumps, check rotation and float switch operation in AUTO, check no water is pumped from the syphon vent. 第 50 页
  7. Fill chlorinator tubes in restricted waters (about 2.5 kg per tube); check aeration tank air pressure is not over 15 mm H2O. 第 50 页
  8. Allow 14 days for the biology to condition before judging effluent quality. 第 56 页

Testing chlorine residual (DPD)

  1. Fill the middle and right-hand comparator chambers with effluent up to the line. 第 51 页
  2. Add a DPD No. 4 tablet to the right-hand chamber and crush it with the stirrer. 第 51 页
  3. Compare colours: aim for 4–6 ppm; above 6 ppm use one tablet tube only; consistently below 1 ppm check tablets and grey water load. 第 51 页

Monthly partial desludging

  1. Only outside controlled waters or to a shore facility: close raw sewage and waste water inlets and open the overboard by-pass. 第 57 页
  2. Set the discharge pump switch OFF, close valve 3, open valve 2 and run the duty pump in HAND. 第 57 页
  3. Discharge about 50 % of the aeration tank, then check the screen and remove scum from the settling tank. 第 57 页
  4. Refill with clean water, reset valves for normal running and switch the pumps back to AUTO. 第 57 页

Draining and cleaning the unit

  1. Never leave the tank full of sewage with the compressors stopped; never enter it unless cleaned, ventilated with all covers off, or with breathing apparatus. 第 58 页
    Toxic gas risk inside the tank
  2. Close inlets, pump switch OFF, close valves 1, 2, 5, open 3, 4, 6 and pump out the chlorine contact tank in HAND. 第 58 页
  3. Close 3, open 2 and empty the aeration compartment; then open 1 and empty the settling tank. 第 58 页
  4. Refill through valve 5 without over-pressurising; super-chlorinate and circulate if a recirculation line is fitted, then pump out. 第 58 页
  5. Recoat damaged areas with coal tar epoxy, renew cover joints and clean the filter. 第 58 页

Replacing air diffuser elements

  1. Replace yearly or when the air gauge rises 0.2 bar above commissioning pressure or the relief valve blows. 第 59 页
  2. With the tank empty, open the side manhole, undo the union and lift out the diffuser assembly. 第 59 页
  3. Remove wingnut and washer, fit the new ceramic element with rubber washers at both ends, do not overtighten. 第 59 页
  4. Refit with the spigot located in the bottom bracket and close the manhole. 第 59 页

Discharge pump: impeller shimming and seal

  1. Isolate the motor, close suction and delivery valves and remove the casing drain plug. 第 67 页
  2. Withdraw motor and pump, unlock the tab washer, remove impeller screw and pull the impeller with two jacking screws. 第 67 页
  3. With a new peel-off shim fitted, measure the clearance behind the impeller; remove laminations to get 0.457 ± 0.076 mm. 第 68 页
  4. Fit the mechanical seal using soft soap and water as lubricant, refit impeller and lock the screw with the tab washer within 15 minutes. 第 69 页
  5. Fit a new casing O-ring and bolt the inner cover to the casing. 第 69 页

保养周期

项目周期操作说明书
ChlorinatorWeekly (in controlled waters)Refill tablet tubes, never below ¼ full; test chlorine residual第 57 页
Sludge return and screenWeeklyCheck air pressure gauge and sludge return through the transparent pipe; clear the coarse screen第 57 页
Air compressorsMonthlyChange over duty and standby compressor第 57 页
Aeration compartmentMonthly30-minute settling test in a 100 ml cylinder; above 60 ml settled sludge, desludge about 50 %第 57 页
Compressor filter cartridges6 monthsInspect and replace if dirty; check the air line non-return valve第 57 页
Whole unitAnnuallyDrain and clean all compartments, repair coating, inspect pumps and blowers, replace air diffuser elements第 57 页
Discharge pump sealsYearly / 8000 h inspect, 4 years / 20000 h replaceInspect and replace O-rings and mechanical seal; inspect casing and impeller key第 70 页

故障及处理方法

技术参数

Design hydraulic load9.36 m³/day第 10 页
Design organic load6.0 kg BOD/day第 10 页
Power supply440 V, 3 phase, 60 Hz; control 220 V AC第 30 页
Discharge pumpB50x50 close-coupled, high head, 8 m³/h at 25 m, 5.7 kW, 3480 rpm (60 Hz)第 30 页
Aeration compressorRietschle DLT 40 rotary, 0.5 bar, 41 m³/h, 1.50/1.80 kW (50/60 Hz)第 30 页
Vent system back pressure15 mm w.g. maximum第 30 页
Max roll or pitch15° either side第 38 页
Ambient conditions0–45 °C, up to 95 % RH第 30 页
Chlorine residual target4–6 ppm (below 1 ppm: not enough disinfection)第 51 页
Chlorine tablet useabout 2 g per person per day; 2.5 kg fills one tube第 51 页
Daily desludge to incinerator135 l (ST6A)第 52 页
Pump impeller clearance0.457 ± 0.076 mm (shim laminations 0.076 mm)第 68 页
Pump tightening torquesimpeller screw 3.0 kg·m, stud and nut 5.0 kg·m, bolt and nut 3.0 kg·m第 62 页

备件与目录号

零件编号数量说明书
Blower spares kit (Rietschle DLT 40)499505591第 22 页
Blower carbon blade6第 22 页
Blower filter cartridge, paper1第 22 页
Blower filter cartridge, metal1第 22 页
Discharge pump spares kit734784481第 27 页
Pump motor spares kit (bearings 6307 2Z / 6206 2Z)734780421第 25 页
Mechanical seal (rotating + stationary)426190721第 27 页
Impeller screw, tab washer, peel-off shim, O-rings1 set第 26 页
DPD No. 4 test tabletsT920100550第 51 页
Control panel spares: contactor, auxiliary contact, lamp, 5 A and 2 A fuses1 set第 28 页

来源:制造商说明书《Sewage treatment plant manual》,共 99 页。页码以原文为准。作业前请核对船上的说明书。

本页为自动翻译。零件号、代码和页码与原文一致。