Deck crane and safe working load (SWL)
Never lift more than the SWL marked on the crane and gear; limit switches and wires are inspected and the crane is load-tested every five years.
In 9 languages
| Language | Term |
|---|---|
| English | Deck crane and safe working load (SWL) |
| Russian | Судовой кран и безопасная рабочая нагрузка (SWL) |
| Romanian | Macara de punte și sarcina maximă de lucru (SWL) |
| Polish | Żuraw pokładowy i dopuszczalne obciążenie robocze (SWL) |
| Latvian | Klāja celtnis un drošā darba slodze (SWL) |
| Filipino | Deck crane at safe working load (SWL) |
| Indonesian | Crane geladak dan beban kerja aman (SWL) |
| Chinese | 克令吊与安全工作负荷(SWL) |
| Croatian | Brodska dizalica i dopušteno radno opterećenje (SWL) |
Find it in the manuals All terms
Related terms
Liferaft and hydrostatic releaseInflatable raft in a canister; the hydrostatic release frees it if the ship sinks. It is serviced ashore every year.Rescue boatFast boat for recovering a person from the water and marshalling liferafts; it must be ready for launching within five minutes.Lifejacket and lifebuoyEvery person has a lifejacket with light and whistle; lifebuoys with lights and smoke signals are placed on both sides of the ship.Muster station and muster listThe muster list gives each person's duties and station for each emergency signal; new crew are familiarised before sailing.Man overboardShout, throw a lifebuoy, press the MOB button, keep the person in sight and turn the ship, for example with a Williamson turn.WindlassDeck machine that heaves and lowers the anchor and chain; the band brake holds the chain and the gypsy is disengaged for letting go.Anchor and chain cable (shackles)Chain length is counted in shackles of 27.5 m (15 fathoms); the length paid out is usually several times the depth of water.Mooring winchWinch with drums that hold the mooring lines; the brake holding capacity is tested and adjusted at set intervals.