Anchor and chain cable (shackles)
Chain length is counted in shackles of 27.5 m (15 fathoms); the length paid out is usually several times the depth of water.
In 9 languages
| Language | Term |
|---|---|
| English | Anchor and chain cable (shackles) |
| Russian | Якорь и якорная цепь (смычки) |
| Romanian | Ancoră și lanț (chei) |
| Polish | Kotwica i łańcuch kotwiczny (szekle) |
| Latvian | Enkurs un enkura ķēde (posmi) |
| Filipino | Anchor at kadena (shackles) |
| Indonesian | Jangkar dan rantai (segel) |
| Chinese | 锚与锚链(节) |
| Croatian | Sidro i sidreni lanac (škopci) |
Find it in the manuals All terms
Related terms
Hatch coverSteel cover that keeps the cargo hold weathertight; seals, cleats and drains are checked and a hose or ultrasonic test is done.Cargo hold and hold cleaningThe space for dry cargo; before loading it must be clean, dry and free of previous cargo residue, often to a surveyor's standard.Deck crane and safe working load (SWL)Never lift more than the SWL marked on the crane and gear; limit switches and wires are inspected and the crane is load-tested every five years.Cargo securing and lashingSecuring cargo against ship movement according to the Cargo Securing Manual; lashings are checked and tightened at sea, especially before bad weather.Gangway and accommodation ladderSafe access between ship and shore with a safety net underneath and a lifebuoy nearby; it is adjusted as the tide and draft change.Lifeboat and davitEnclosed boat for abandoning ship, launched by its davit; the engine is run weekly and the boat is lowered and manoeuvred in drills.Liferaft and hydrostatic releaseInflatable raft in a canister; the hydrostatic release frees it if the ship sinks. It is serviced ashore every year.Rescue boatFast boat for recovering a person from the water and marshalling liferafts; it must be ready for launching within five minutes.