SeaVint

MacGregor-Hägglunds HH 160-0520

Electro-hydraulic hose handling crane

Instruction and parts manual for a MacGregor-Hägglunds HH 160-0520 electro-hydraulic deck crane used for handling cargo hoses: SWL 5 t, outreach 4–20 m, hook travel 40 m. The crane housing is also the hydraulic oil tank; one fixed-displacement pump driven by a 34 kW electric motor feeds the hoisting winch, the luffing cylinder and the slewing gear through a load-sensing main directional valve. The manual covers technical data and description, hydraulic and electric functions, the operating instruction and safety checklist, parking and sea stowing, the maintenance and lubricating charts, oil sampling and lubricants, service of the slewing gearset and hoisting winch, troubleshooting, and illustrated parts lists including the 5 t hook block.

Noklikšķiniet uz detaļas modelī, lai redzētu tās numuru un nozīmi.Atvērt 3D rokasgrāmatu

Mācību video

Hose handling crane on a tanker: controls, brakes, sea stowing, oil, hook block▶ YouTube Shorts

Apkopes procedūras

Starting and stopping the crane

  1. Notify the responsible officer and make sure nobody is in the crane working area. 51. lpp.
  2. Check the ship lists no more than 5°, the wires run correctly in the sheaves and their ends are clamped, and the hydraulic oil level. 50. lpp.
  3. Set the main switch on the starter box to 1: lamps 'Main supply' and 'Anticondensation heater' light. Switch on about 10 hours before use. 51. lpp.
  4. Press Start on the starter box (or green Start on the remote box on the foundation): 'Crane running' lights and the heater lamp goes out. 51. lpp.
  5. Operate with the three levers: hoisting, luffing and slewing. The motion follows the lever; several motions at once reduce the speed. 52. lpp.
  6. Emergency stop: turn the emergency stop cock to stop all crane movements. 51. lpp.
    Stops every movement
  7. Stop with the Stop button (or red Stop on the remote box), then set the main switch to 0. 51. lpp.

Parking the crane and sea stowing

  1. Before the voyage put the jib on its parking support. 53. lpp.
  2. If the hook is stowed to deck use fibre strops with low ultimate load or a manual turnbuckle. 53. lpp.
  3. Do not tighten the wire ropes: ropes, sheaves and winches take heavy stress during the voyage. 53. lpp.
    Never tension the hoisting wire for sea stowing
  4. Before cargo handling loosen the hook and jib before raising the jib from the support, and luff in to the working area. 53. lpp.
  5. Release the hook from sea stowing manually: it starts hoisting when the brake is released. 53. lpp.
    Release the hook by hand

Cleaning the crane housing / oil tank and refilling

  1. Immobilise the jib and stop the electric motor. 59. lpp.
  2. Open the drain cock and drain into clean drums; then drain the rest at the plug on the pump bracket. 59. lpp.
  3. Remove the tank cover, scrape out sediment with a rubber scraper and flush with white spirit. 59. lpp.
  4. Wipe dry with clean rags (no cotton waste); refit the cover with new sealing compound. 59. lpp.
  5. Fill filtered oil to just under MAX with the machinery at rest, jib parked and cylinder fully in. 59. lpp.
    ISO 16/13 or better

Sampling hydraulic oil

  1. Run the system to 40–50 °C oil temperature. 60. lpp.
  2. Connect a pressure gauge hose to gauge outlet 3.1 of the hoisting circuit. 60. lpp.
  3. Run the hoisting winch at maximum hoisting speed and bleed 0.5 L into a bucket. 60. lpp.
  4. Fill the sample bottle and send it for analysis. 60. lpp.
  5. If contamination is too high change oil and filters, run about 1 h and take a new sample. 60. lpp.

Replacing the hook block

  1. Order the hook block by part number 388 7531-801 (SWL 5 t). 129. lpp.
  2. After replacing the hook block or genuine parts in it, carry out an overload test of the complete unit and issue a new certificate. 128. lpp.
    Overload test and new certificate

Tehniskās apkopes intervāli

ObjektsKadDarbībaRokasgr.
Crane housing / hydraulic oil tankBefore every startCheck the oil level in the sight glass54. lpp.
Oil filterBefore every startCheck the oil pressure54. lpp.
Slewing gear case and winchBefore every startCheck oil level; check for leakage, especially the bottom shaft seal54. lpp.
Slewing rim screwsEvery 2 months / 200 hInspect from below; if any slackens, tighten all with a torque wrench54. lpp.
Slewing gear case and winchAfter first 200 hFirst oil change54. lpp.
Wire ropes and clampsEvery 6 months / 500 hInspect for wear as class and national rules require54. lpp.
Wire sheavesEvery 6 months / 500 hInspect for wear54. lpp.
Loose gearEvery 6 months / 500 hCheck that hook and swivel are intact54. lpp.
Cranehouse, foundation and jib weldsEvery 6 months / 500 hInspect for cracks55. lpp.
Hydraulic oilEvery 6 monthsSample and analyse; without analysis change the oil every 2 years / 2000 h55. lpp.
Slewing pinionEvery 6 months / 500 hCheck backlash; check slewing rim seals55. lpp.
Slewing gear case and winchEvery year / 1000 hChange oil, including the disc room and room between motor and gear; check slewing motor spline shaft55. lpp.
Air breatherEvery year / 1000 hCheck and change55. lpp.
Hydraulic oil tankEvery 2 years / 2000 hDrain, clean the tank, refill and change the filter cartridge55. lpp.
Winch and slewing gear disc brakesEvery 2 years / 2000 hCheck for leakage and check the discs55. lpp.
Slewing rim studs/screwsEvery 4 yearsTighten all with a torque wrench to the slewing assembly drawing55. lpp.

Bojājumi un ko darīt

Tehniskie parametri

Type of craneHH 160-052037. lpp.
Safe working load (SWL)5 t37. lpp.
Jib radiusmax 20 m / min 4.0 m37. lpp.
Hook travel (lifting height)40 m37. lpp.
Luffing time max to min radius50 s37. lpp.
Slewing speedmax 1.6 r/min37. lpp.
Steel ropeØ13 mm, L = 105 m, part no. 388 7148-82137. lpp.
Crane weight10.6 t37. lpp.
Electric motor34 kW cont., 48 kW S6 40%, 1765 r/min, 440 V 60 Hz, starting current 440 A37. lpp.
Hook blockSWL 5 t, part no. 388 7531-801129. lpp.
Shackle on hook blockSWL 6.5 t, part no. 875 12102-001129. lpp.
Hydraulic oilabout 46 cSt at 40 °C (e.g. Shell T46), filtered to ISO 16/13 or better62. lpp.
Winch and slewing gear oilISO VG 220 HM gear oil (e.g. Shell Omala 220)62. lpp.
Disc room / room between motor and gearATF oil (e.g. Shell ATF Donax TF)62. lpp.
Ship list for operationmax 5°50. lpp.

Rezerves daļas un kataloga numuri

DetaļaNumursDaudz.Rokasgr.
Winch, mounting, 5 tonnes288 0133-80114. lpp.
Winch, 5 tonnes288 0132-80114. lpp.
Hydraulic motor (winch)388 3127-80114. lpp.
Slewing gear unit with disc brake287 9970-80114. lpp.
Hydraulic motor, slewing187 8383-80114. lpp.
Pump drive arrangement288 0710-80114. lpp.
Pump187 8379-80114. lpp.
Slewing assembly287 9972-80114. lpp.
Slewing rim388 7097-80114. lpp.
Jib top, mounting288 0136-80114. lpp.
Cylinder mounting288 1646-80114. lpp.
Load wire rope with thimble388 7148-82114. lpp.
Hook block, SWL 5 t388 7531-8011129. lpp.
Hook (hook block)875 12001-0041129. lpp.
Sheave (hook block)875 12004-0051129. lpp.
Shaft (hook block)875 12005-0031129. lpp.
Roller bearing (hook block)875 12054-0061129. lpp.
Shackle SWL 6.5 t (hook block)875 12102-0011129. lpp.
Jib bearing assembly287 9974-80114. lpp.
Directional valve188 1338-80114. lpp.
Balance valve287 9466-80124. lpp.
Motor valve388 6358-80114. lpp.
Balance valve288 1561-80114. lpp.
Filter287 9463-80114. lpp.
Hydraulic cylinder287 9465-80114. lpp.
El. central / starter314 3273-80114. lpp.

Avots: ražotāja rokasgrāmata “MacGregor_HH160-0520_hose_crane_manual”, 167 lpp. Lappušu numuri atbilst oriģinālam. Pirms darba pārbaudiet rokasgrāmatu uz kuģa.

Lappuse tulkota automātiski. Detaļu numuri, kodi un lappuses ir kā oriģinālā.