MacGregor-Hägglunds HH 160-0520
Electro-hydraulic hose handling crane
Instruction and parts manual for a MacGregor-Hägglunds HH 160-0520 electro-hydraulic deck crane used for handling cargo hoses: SWL 5 t, outreach 4–20 m, hook travel 40 m. The crane housing is also the hydraulic oil tank; one fixed-displacement pump driven by a 34 kW electric motor feeds the hoisting winch, the luffing cylinder and the slewing gear through a load-sensing main directional valve. The manual covers technical data and description, hydraulic and electric functions, the operating instruction and safety checklist, parking and sea stowing, the maintenance and lubricating charts, oil sampling and lubricants, service of the slewing gearset and hoisting winch, troubleshooting, and illustrated parts lists including the 5 t hook block.
Обучающие видео
Процедуры обслуживания
Starting and stopping the crane
- Notify the responsible officer and make sure nobody is in the crane working area. стр. 51
- Check the ship lists no more than 5°, the wires run correctly in the sheaves and their ends are clamped, and the hydraulic oil level. стр. 50
- Set the main switch on the starter box to 1: lamps 'Main supply' and 'Anticondensation heater' light. Switch on about 10 hours before use. стр. 51
- Press Start on the starter box (or green Start on the remote box on the foundation): 'Crane running' lights and the heater lamp goes out. стр. 51
- Operate with the three levers: hoisting, luffing and slewing. The motion follows the lever; several motions at once reduce the speed. стр. 52
- Emergency stop: turn the emergency stop cock to stop all crane movements. стр. 51Stops every movement
- Stop with the Stop button (or red Stop on the remote box), then set the main switch to 0. стр. 51
Parking the crane and sea stowing
- Before the voyage put the jib on its parking support. стр. 53
- If the hook is stowed to deck use fibre strops with low ultimate load or a manual turnbuckle. стр. 53
- Do not tighten the wire ropes: ropes, sheaves and winches take heavy stress during the voyage. стр. 53Never tension the hoisting wire for sea stowing
- Before cargo handling loosen the hook and jib before raising the jib from the support, and luff in to the working area. стр. 53
- Release the hook from sea stowing manually: it starts hoisting when the brake is released. стр. 53Release the hook by hand
Cleaning the crane housing / oil tank and refilling
- Immobilise the jib and stop the electric motor. стр. 59
- Open the drain cock and drain into clean drums; then drain the rest at the plug on the pump bracket. стр. 59
- Remove the tank cover, scrape out sediment with a rubber scraper and flush with white spirit. стр. 59
- Wipe dry with clean rags (no cotton waste); refit the cover with new sealing compound. стр. 59
- Fill filtered oil to just under MAX with the machinery at rest, jib parked and cylinder fully in. стр. 59ISO 16/13 or better
Sampling hydraulic oil
- Run the system to 40–50 °C oil temperature. стр. 60
- Connect a pressure gauge hose to gauge outlet 3.1 of the hoisting circuit. стр. 60
- Run the hoisting winch at maximum hoisting speed and bleed 0.5 L into a bucket. стр. 60
- Fill the sample bottle and send it for analysis. стр. 60
- If contamination is too high change oil and filters, run about 1 h and take a new sample. стр. 60
Replacing the hook block
- Order the hook block by part number 388 7531-801 (SWL 5 t). стр. 129
- After replacing the hook block or genuine parts in it, carry out an overload test of the complete unit and issue a new certificate. стр. 128Overload test and new certificate
Интервалы технического обслуживания
| Что | Когда | Что делать | Мануал |
|---|---|---|---|
| Crane housing / hydraulic oil tank | Before every start | Check the oil level in the sight glass | стр. 54 |
| Oil filter | Before every start | Check the oil pressure | стр. 54 |
| Slewing gear case and winch | Before every start | Check oil level; check for leakage, especially the bottom shaft seal | стр. 54 |
| Slewing rim screws | Every 2 months / 200 h | Inspect from below; if any slackens, tighten all with a torque wrench | стр. 54 |
| Slewing gear case and winch | After first 200 h | First oil change | стр. 54 |
| Wire ropes and clamps | Every 6 months / 500 h | Inspect for wear as class and national rules require | стр. 54 |
| Wire sheaves | Every 6 months / 500 h | Inspect for wear | стр. 54 |
| Loose gear | Every 6 months / 500 h | Check that hook and swivel are intact | стр. 54 |
| Cranehouse, foundation and jib welds | Every 6 months / 500 h | Inspect for cracks | стр. 55 |
| Hydraulic oil | Every 6 months | Sample and analyse; without analysis change the oil every 2 years / 2000 h | стр. 55 |
| Slewing pinion | Every 6 months / 500 h | Check backlash; check slewing rim seals | стр. 55 |
| Slewing gear case and winch | Every year / 1000 h | Change oil, including the disc room and room between motor and gear; check slewing motor spline shaft | стр. 55 |
| Air breather | Every year / 1000 h | Check and change | стр. 55 |
| Hydraulic oil tank | Every 2 years / 2000 h | Drain, clean the tank, refill and change the filter cartridge | стр. 55 |
| Winch and slewing gear disc brakes | Every 2 years / 2000 h | Check for leakage and check the discs | стр. 55 |
| Slewing rim studs/screws | Every 4 years | Tighten all with a torque wrench to the slewing assembly drawing | стр. 55 |
Неисправности и что делать
Технические характеристики
| Type of crane | HH 160-0520 | стр. 37 |
|---|---|---|
| Safe working load (SWL) | 5 t | стр. 37 |
| Jib radius | max 20 m / min 4.0 m | стр. 37 |
| Hook travel (lifting height) | 40 m | стр. 37 |
| Luffing time max to min radius | 50 s | стр. 37 |
| Slewing speed | max 1.6 r/min | стр. 37 |
| Steel rope | Ø13 mm, L = 105 m, part no. 388 7148-821 | стр. 37 |
| Crane weight | 10.6 t | стр. 37 |
| Electric motor | 34 kW cont., 48 kW S6 40%, 1765 r/min, 440 V 60 Hz, starting current 440 A | стр. 37 |
| Hook block | SWL 5 t, part no. 388 7531-801 | стр. 129 |
| Shackle on hook block | SWL 6.5 t, part no. 875 12102-001 | стр. 129 |
| Hydraulic oil | about 46 cSt at 40 °C (e.g. Shell T46), filtered to ISO 16/13 or better | стр. 62 |
| Winch and slewing gear oil | ISO VG 220 HM gear oil (e.g. Shell Omala 220) | стр. 62 |
| Disc room / room between motor and gear | ATF oil (e.g. Shell ATF Donax TF) | стр. 62 |
| Ship list for operation | max 5° | стр. 50 |
Запчасти и номера по каталогу
| Деталь | Номер | Кол. | Мануал |
|---|---|---|---|
| Winch, mounting, 5 tonnes | 288 0133-801 | 1 | стр. 4 |
| Winch, 5 tonnes | 288 0132-801 | 1 | стр. 4 |
| Hydraulic motor (winch) | 388 3127-801 | 1 | стр. 4 |
| Slewing gear unit with disc brake | 287 9970-801 | 1 | стр. 4 |
| Hydraulic motor, slewing | 187 8383-801 | 1 | стр. 4 |
| Pump drive arrangement | 288 0710-801 | 1 | стр. 4 |
| Pump | 187 8379-801 | 1 | стр. 4 |
| Slewing assembly | 287 9972-801 | 1 | стр. 4 |
| Slewing rim | 388 7097-801 | 1 | стр. 4 |
| Jib top, mounting | 288 0136-801 | 1 | стр. 4 |
| Cylinder mounting | 288 1646-801 | 1 | стр. 4 |
| Load wire rope with thimble | 388 7148-821 | 1 | стр. 4 |
| Hook block, SWL 5 t | 388 7531-801 | 1 | стр. 129 |
| Hook (hook block) | 875 12001-004 | 1 | стр. 129 |
| Sheave (hook block) | 875 12004-005 | 1 | стр. 129 |
| Shaft (hook block) | 875 12005-003 | 1 | стр. 129 |
| Roller bearing (hook block) | 875 12054-006 | 1 | стр. 129 |
| Shackle SWL 6.5 t (hook block) | 875 12102-001 | 1 | стр. 129 |
| Jib bearing assembly | 287 9974-801 | 1 | стр. 4 |
| Directional valve | 188 1338-801 | 1 | стр. 4 |
| Balance valve | 287 9466-801 | 2 | стр. 4 |
| Motor valve | 388 6358-801 | 1 | стр. 4 |
| Balance valve | 288 1561-801 | 1 | стр. 4 |
| Filter | 287 9463-801 | 1 | стр. 4 |
| Hydraulic cylinder | 287 9465-801 | 1 | стр. 4 |
| El. central / starter | 314 3273-801 | 1 | стр. 4 |
Источник: мануал производителя «MacGregor_HH160-0520_hose_crane_manual», 167 стр. Номера страниц указаны по оригиналу. Перед работой сверяйтесь с мануалом на судне.
Страница переведена автоматически. Номера деталей, коды и страницы — как в оригинале.