SeaVint

MacGregor-Hägglunds HH 160-0520

Electro-hydraulic hose handling crane

Instruction and parts manual for a MacGregor-Hägglunds HH 160-0520 electro-hydraulic deck crane used for handling cargo hoses: SWL 5 t, outreach 4–20 m, hook travel 40 m. The crane housing is also the hydraulic oil tank; one fixed-displacement pump driven by a 34 kW electric motor feeds the hoisting winch, the luffing cylinder and the slewing gear through a load-sensing main directional valve. The manual covers technical data and description, hydraulic and electric functions, the operating instruction and safety checklist, parking and sea stowing, the maintenance and lubricating charts, oil sampling and lubricants, service of the slewing gearset and hoisting winch, troubleshooting, and illustrated parts lists including the 5 t hook block.

Нажмите на деталь на модели — увидите номер и назначение.Открыть 3D-мануал

Обучающие видео

Hose handling crane on a tanker: controls, brakes, sea stowing, oil, hook block▶ YouTube Shorts

Процедуры обслуживания

Starting and stopping the crane

  1. Notify the responsible officer and make sure nobody is in the crane working area. стр. 51
  2. Check the ship lists no more than 5°, the wires run correctly in the sheaves and their ends are clamped, and the hydraulic oil level. стр. 50
  3. Set the main switch on the starter box to 1: lamps 'Main supply' and 'Anticondensation heater' light. Switch on about 10 hours before use. стр. 51
  4. Press Start on the starter box (or green Start on the remote box on the foundation): 'Crane running' lights and the heater lamp goes out. стр. 51
  5. Operate with the three levers: hoisting, luffing and slewing. The motion follows the lever; several motions at once reduce the speed. стр. 52
  6. Emergency stop: turn the emergency stop cock to stop all crane movements. стр. 51
    Stops every movement
  7. Stop with the Stop button (or red Stop on the remote box), then set the main switch to 0. стр. 51

Parking the crane and sea stowing

  1. Before the voyage put the jib on its parking support. стр. 53
  2. If the hook is stowed to deck use fibre strops with low ultimate load or a manual turnbuckle. стр. 53
  3. Do not tighten the wire ropes: ropes, sheaves and winches take heavy stress during the voyage. стр. 53
    Never tension the hoisting wire for sea stowing
  4. Before cargo handling loosen the hook and jib before raising the jib from the support, and luff in to the working area. стр. 53
  5. Release the hook from sea stowing manually: it starts hoisting when the brake is released. стр. 53
    Release the hook by hand

Cleaning the crane housing / oil tank and refilling

  1. Immobilise the jib and stop the electric motor. стр. 59
  2. Open the drain cock and drain into clean drums; then drain the rest at the plug on the pump bracket. стр. 59
  3. Remove the tank cover, scrape out sediment with a rubber scraper and flush with white spirit. стр. 59
  4. Wipe dry with clean rags (no cotton waste); refit the cover with new sealing compound. стр. 59
  5. Fill filtered oil to just under MAX with the machinery at rest, jib parked and cylinder fully in. стр. 59
    ISO 16/13 or better

Sampling hydraulic oil

  1. Run the system to 40–50 °C oil temperature. стр. 60
  2. Connect a pressure gauge hose to gauge outlet 3.1 of the hoisting circuit. стр. 60
  3. Run the hoisting winch at maximum hoisting speed and bleed 0.5 L into a bucket. стр. 60
  4. Fill the sample bottle and send it for analysis. стр. 60
  5. If contamination is too high change oil and filters, run about 1 h and take a new sample. стр. 60

Replacing the hook block

  1. Order the hook block by part number 388 7531-801 (SWL 5 t). стр. 129
  2. After replacing the hook block or genuine parts in it, carry out an overload test of the complete unit and issue a new certificate. стр. 128
    Overload test and new certificate

Интервалы технического обслуживания

ЧтоКогдаЧто делатьМануал
Crane housing / hydraulic oil tankBefore every startCheck the oil level in the sight glassстр. 54
Oil filterBefore every startCheck the oil pressureстр. 54
Slewing gear case and winchBefore every startCheck oil level; check for leakage, especially the bottom shaft sealстр. 54
Slewing rim screwsEvery 2 months / 200 hInspect from below; if any slackens, tighten all with a torque wrenchстр. 54
Slewing gear case and winchAfter first 200 hFirst oil changeстр. 54
Wire ropes and clampsEvery 6 months / 500 hInspect for wear as class and national rules requireстр. 54
Wire sheavesEvery 6 months / 500 hInspect for wearстр. 54
Loose gearEvery 6 months / 500 hCheck that hook and swivel are intactстр. 54
Cranehouse, foundation and jib weldsEvery 6 months / 500 hInspect for cracksстр. 55
Hydraulic oilEvery 6 monthsSample and analyse; without analysis change the oil every 2 years / 2000 hстр. 55
Slewing pinionEvery 6 months / 500 hCheck backlash; check slewing rim sealsстр. 55
Slewing gear case and winchEvery year / 1000 hChange oil, including the disc room and room between motor and gear; check slewing motor spline shaftстр. 55
Air breatherEvery year / 1000 hCheck and changeстр. 55
Hydraulic oil tankEvery 2 years / 2000 hDrain, clean the tank, refill and change the filter cartridgeстр. 55
Winch and slewing gear disc brakesEvery 2 years / 2000 hCheck for leakage and check the discsстр. 55
Slewing rim studs/screwsEvery 4 yearsTighten all with a torque wrench to the slewing assembly drawingстр. 55

Неисправности и что делать

Технические характеристики

Type of craneHH 160-0520стр. 37
Safe working load (SWL)5 tстр. 37
Jib radiusmax 20 m / min 4.0 mстр. 37
Hook travel (lifting height)40 mстр. 37
Luffing time max to min radius50 sстр. 37
Slewing speedmax 1.6 r/minстр. 37
Steel ropeØ13 mm, L = 105 m, part no. 388 7148-821стр. 37
Crane weight10.6 tстр. 37
Electric motor34 kW cont., 48 kW S6 40%, 1765 r/min, 440 V 60 Hz, starting current 440 Aстр. 37
Hook blockSWL 5 t, part no. 388 7531-801стр. 129
Shackle on hook blockSWL 6.5 t, part no. 875 12102-001стр. 129
Hydraulic oilabout 46 cSt at 40 °C (e.g. Shell T46), filtered to ISO 16/13 or betterстр. 62
Winch and slewing gear oilISO VG 220 HM gear oil (e.g. Shell Omala 220)стр. 62
Disc room / room between motor and gearATF oil (e.g. Shell ATF Donax TF)стр. 62
Ship list for operationmax 5°стр. 50

Запчасти и номера по каталогу

ДетальНомерКол.Мануал
Winch, mounting, 5 tonnes288 0133-8011стр. 4
Winch, 5 tonnes288 0132-8011стр. 4
Hydraulic motor (winch)388 3127-8011стр. 4
Slewing gear unit with disc brake287 9970-8011стр. 4
Hydraulic motor, slewing187 8383-8011стр. 4
Pump drive arrangement288 0710-8011стр. 4
Pump187 8379-8011стр. 4
Slewing assembly287 9972-8011стр. 4
Slewing rim388 7097-8011стр. 4
Jib top, mounting288 0136-8011стр. 4
Cylinder mounting288 1646-8011стр. 4
Load wire rope with thimble388 7148-8211стр. 4
Hook block, SWL 5 t388 7531-8011стр. 129
Hook (hook block)875 12001-0041стр. 129
Sheave (hook block)875 12004-0051стр. 129
Shaft (hook block)875 12005-0031стр. 129
Roller bearing (hook block)875 12054-0061стр. 129
Shackle SWL 6.5 t (hook block)875 12102-0011стр. 129
Jib bearing assembly287 9974-8011стр. 4
Directional valve188 1338-8011стр. 4
Balance valve287 9466-8012стр. 4
Motor valve388 6358-8011стр. 4
Balance valve288 1561-8011стр. 4
Filter287 9463-8011стр. 4
Hydraulic cylinder287 9465-8011стр. 4
El. central / starter314 3273-8011стр. 4

Источник: мануал производителя «MacGregor_HH160-0520_hose_crane_manual», 167 стр. Номера страниц указаны по оригиналу. Перед работой сверяйтесь с мануалом на судне.

Страница переведена автоматически. Номера деталей, коды и страницы — как в оригинале.