Tanabe VLHH-64A / 74A
V veida trīspakāpju virzuļkompresors ar gaisa dzesēšanu
The Tanabe VLHH-64A and 74A are V-type, air-cooled, three-stage reciprocating compressors used mainly to fill the starting air receivers of marine diesel engines (max. 3.92 MPa). They are V-belt or direct driven, with forced lubrication of the bearings by a gear oil pump and a separate lubricator for the 2nd-stage cylinder. Automatic start/stop works from a pressure switch with an unloader solenoid valve that also purges the stage drains. The manual covers installation, test run, daily operation, a fault table, the maintenance chart, tightening torques, clearance tables and the recommended oils.
Apkopes procedūras
Manual start and stop
- Open the drain valve of each stage. 29. lpp.
- Switch on the main power, then the operating power. 29. lpp.
- When the compressor runs, close the stage drain valves to start loading; watch temperature, sound and current. 29. lpp.
- To stop: unload by opening the air tank drain or the delivery stop valve, switch off operating power then main power. 29. lpp.
- Drain the air tank and drain separator, then close their valves. 29. lpp.
Crankcase oil change
- Run the compressor warm and stop it; isolate power and release pressure. 44. lpp.Hot surfaces and pressure may remain
- Drain all oil while warm. 44. lpp.
- Wash the oil screen in clean flushing oil. 44. lpp.
- Fill fresh ISO VG 100 oil to level H; repeat at 50 h and 100 h on a new compressor, then every 500 h. 44. lpp.
Air valve inspection
- Remove the pipes, cylinder head and valve assembly. 38. lpp.
- Wipe the valve and check for carbon or foreign matter; if dirty, dismantle and clean with a soft brush. 38. lpp.
- Do not damage the seat; do not fit plates or springs upside down. 38. lpp.
- Refit with new valve seat gaskets held by grease; tighten the head diagonally to 900 kgf·cm. 38. lpp.
Tehniskās apkopes intervāli
| Objekts | Kad | Darbība | Rokasgr. |
|---|---|---|---|
| Air valves | 250 h | Dismantle and clean; check plate wear and spring fatigue | 35. lpp. |
| Crankcase oil | 50 h and 100 h after first start, then every 500 h | Drain warm, wash the oil screen, refill fresh oil | 44. lpp. |
| Oil screen | 500 h | Clean | 35. lpp. |
| Piston, rings, cylinder | 3000 h | Check wear of cylinder, piston diameter, ring grooves; replace worn rings | 35. lpp. |
| Oil pump and lubricator | 8000 h | Check they turn freely by hand; dismantle and clean if stiff | 46. lpp. |
| Suction filter | periodically (per chart) | Replace the dry element | 47. lpp. |
| Stage coolers | periodically | Blow the fins clean with air; check joints for leaks | 47. lpp. |
| Safety valves | once a year | Check operation | 35. lpp. |
| Pressure gauges | at least yearly | Check and calibrate | 35. lpp. |
| Whole compressor | every 3 years | Overhaul; renew all gaskets and O-rings | 35. lpp. |
Bojājumi un ko darīt
Tehniskie parametri
| Type | V type, air-cooled, 3-stage compression | 53. lpp. |
|---|---|---|
| Cylinder bore 1st / 2nd / 3rd stage | 150 / 110 / 90 mm (64A); 180 / 110 / 90 mm (74A) | 53. lpp. |
| Stroke | 100 mm | 53. lpp. |
| Maximum pressure | 3.92 MPa | 53. lpp. |
| Maximum speed | 1200 rpm | 53. lpp. |
| Air valves | 1st VH-6100 (64A) / VH-7200 (74A), 2nd VH-4200, 3rd VP-2700 | 53. lpp. |
| Crankcase oil capacity | 9.8 l | 53. lpp. |
| Dry weight | 480 kg (64A), 490 kg (74A) | 53. lpp. |
| Lubrication | bearings: forced by oil pump; 2nd-stage cylinder: lubricator | 53. lpp. |
| Oil | ISO VG 100 (SAE 30); ISO VG 68 when ambient is 10 °C or more | 44. lpp. |
| Tightening torques | cylinder head 900 kgf·cm, connecting rod bolt 900 kgf·cm, valve flange 500 kgf·cm | 36. lpp. |
| Piston rings | 1st stage 2 pcs, 2nd stage 3 pcs (64A) / 4 pcs (74A), 3rd stage 3 pcs | 41. lpp. |
| Valve seat gaskets | copper, 1.5 mm, all stages — genuine parts only | 49. lpp. |
| Lubricator lever position | 3 above 1000 rpm, 4 below 1000 rpm | 46. lpp. |
| Unloader timer at start | about 10 s no-load start, then load | 29. lpp. |
Rezerves daļas un kataloga numuri
| Detaļa | Numurs | Daudz. | Rokasgr. |
|---|---|---|---|
| 1st stage valve assembly (64A) | VH-6100 | 1 | 53. lpp. |
| 2nd stage valve assembly | VH-4200 | 1 | 53. lpp. |
| 3rd stage suction/delivery valve assembly | VP-2700 | 1+1 | 55. lpp. |
| Lubricator assembly | LM-1700 | 1 | 55. lpp. |
| Main bearing (front and rear) | 30314 | 2 | 55. lpp. |
| Oil filter assembly | SO-410 | 1 | 55. lpp. |
| Oil screen assembly | SO-130 | 1 | 55. lpp. |
Avots: ražotāja rokasgrāmata “EM-20-5 INSTRUCTION MANUAL FOR TANABE AIR COMPRESSOR TYPE VLHH”, 60 lpp. Lappušu numuri atbilst oriģinālam. Pirms darba pārbaudiet rokasgrāmatu uz kuģa.