SeaVint

Tanabe VLHH-64A / 74A

V 型风冷三级活塞式空压机

The Tanabe VLHH-64A and 74A are V-type, air-cooled, three-stage reciprocating compressors used mainly to fill the starting air receivers of marine diesel engines (max. 3.92 MPa). They are V-belt or direct driven, with forced lubrication of the bearings by a gear oil pump and a separate lubricator for the 2nd-stage cylinder. Automatic start/stop works from a pressure switch with an unloader solenoid valve that also purges the stage drains. The manual covers installation, test run, daily operation, a fault table, the maintenance chart, tightening torques, clearance tables and the recommended oils.

点击模型上的零件,查看编号和用途。打开 3D 训练

保养规程

Manual start and stop

  1. Open the drain valve of each stage. 第 29 页
  2. Switch on the main power, then the operating power. 第 29 页
  3. When the compressor runs, close the stage drain valves to start loading; watch temperature, sound and current. 第 29 页
  4. To stop: unload by opening the air tank drain or the delivery stop valve, switch off operating power then main power. 第 29 页
  5. Drain the air tank and drain separator, then close their valves. 第 29 页

Crankcase oil change

  1. Run the compressor warm and stop it; isolate power and release pressure. 第 44 页
    Hot surfaces and pressure may remain
  2. Drain all oil while warm. 第 44 页
  3. Wash the oil screen in clean flushing oil. 第 44 页
  4. Fill fresh ISO VG 100 oil to level H; repeat at 50 h and 100 h on a new compressor, then every 500 h. 第 44 页

Air valve inspection

  1. Remove the pipes, cylinder head and valve assembly. 第 38 页
  2. Wipe the valve and check for carbon or foreign matter; if dirty, dismantle and clean with a soft brush. 第 38 页
  3. Do not damage the seat; do not fit plates or springs upside down. 第 38 页
  4. Refit with new valve seat gaskets held by grease; tighten the head diagonally to 900 kgf·cm. 第 38 页

保养周期

项目周期操作说明书
Air valves250 hDismantle and clean; check plate wear and spring fatigue第 35 页
Crankcase oil50 h and 100 h after first start, then every 500 hDrain warm, wash the oil screen, refill fresh oil第 44 页
Oil screen500 hClean第 35 页
Piston, rings, cylinder3000 hCheck wear of cylinder, piston diameter, ring grooves; replace worn rings第 35 页
Oil pump and lubricator8000 hCheck they turn freely by hand; dismantle and clean if stiff第 46 页
Suction filterperiodically (per chart)Replace the dry element第 47 页
Stage coolersperiodicallyBlow the fins clean with air; check joints for leaks第 47 页
Safety valvesonce a yearCheck operation第 35 页
Pressure gaugesat least yearlyCheck and calibrate第 35 页
Whole compressorevery 3 yearsOverhaul; renew all gaskets and O-rings第 35 页

故障及处理方法

技术参数

TypeV type, air-cooled, 3-stage compression第 53 页
Cylinder bore 1st / 2nd / 3rd stage150 / 110 / 90 mm (64A); 180 / 110 / 90 mm (74A)第 53 页
Stroke100 mm第 53 页
Maximum pressure3.92 MPa第 53 页
Maximum speed1200 rpm第 53 页
Air valves1st VH-6100 (64A) / VH-7200 (74A), 2nd VH-4200, 3rd VP-2700第 53 页
Crankcase oil capacity9.8 l第 53 页
Dry weight480 kg (64A), 490 kg (74A)第 53 页
Lubricationbearings: forced by oil pump; 2nd-stage cylinder: lubricator第 53 页
OilISO VG 100 (SAE 30); ISO VG 68 when ambient is 10 °C or more第 44 页
Tightening torquescylinder head 900 kgf·cm, connecting rod bolt 900 kgf·cm, valve flange 500 kgf·cm第 36 页
Piston rings1st stage 2 pcs, 2nd stage 3 pcs (64A) / 4 pcs (74A), 3rd stage 3 pcs第 41 页
Valve seat gasketscopper, 1.5 mm, all stages — genuine parts only第 49 页
Lubricator lever position3 above 1000 rpm, 4 below 1000 rpm第 46 页
Unloader timer at startabout 10 s no-load start, then load第 29 页

备件与目录号

零件编号数量说明书
1st stage valve assembly (64A)VH-61001第 53 页
2nd stage valve assemblyVH-42001第 53 页
3rd stage suction/delivery valve assemblyVP-27001+1第 55 页
Lubricator assemblyLM-17001第 55 页
Main bearing (front and rear)303142第 55 页
Oil filter assemblySO-4101第 55 页
Oil screen assemblySO-1301第 55 页

来源:制造商说明书《EM-20-5 INSTRUCTION MANUAL FOR TANABE AIR COMPRESSOR TYPE VLHH》,共 60 页。页码以原文为准。作业前请核对船上的说明书。

本页为自动翻译。零件号、代码和页码与原文一致。