Zhenjiang PD10
Pneumatic accommodation ladder winch
Air-driven winch for hoisting and lowering the accommodation ladder, a short-time duty machine. A flanged air motor drives a split drum for two ropes through a reduction gear with a ratchet brake that limits the lowering speed; a hand crank on the gearbox shaft works it when there is no air, and a limit valve cuts the air while the crank is out. The manual covers readiness checks, operation with the three-position change valve, lubrication, rope renewal and opening the gearbox.
Videozapisi za obuku
Postupci održavanja
Readiness for operation
- All operators must know the construction of the winch. str. 11
- The rope must leave the drum as on the general drawing; never wind it the wrong way. str. 11
- Check all connections for looseness, especially the rope end on the drum and the foundation bolts; check the brake. str. 11
- Clear any obstacles round the winch. str. 11
- Check the air fittings, pipes and air motor. str. 11
- Renew a rope with ten broken wires in 1 m or with reduced diameter. str. 11
- Check the oil level between the dipstick marks. str. 11
- Check the manual handle is stowed and the limit switch is reliable. str. 11
Operating the winch
- Pull out the pin on the accommodation ladder. str. 11
- Move the three-position change valve handle to lower, stop, hoist or capsize the ladder. str. 11
- To work by hand, keep the change valve in the middle, insert the handle on the square shaft end of the gearbox and crank. str. 12
Opening and reassembling the gearbox
- Unscrew the drain plug at the bottom of the gear box, drain the oil and remove the air motor. str. 12
- Strip the bolts of the big cover plate and pull it off together with the high-speed gear shaft; take out the bearings. str. 12
- Remove the big gear, ratchet and brake disc of the second stage in order. str. 12
- Reassemble in reverse order. str. 12Check the ratchet tooth direction; do not strip the ratchet unless necessary
- Refit only if the brake works without slipping. str. 12
Intervali održavanja
| Stavka | Kada | Radnja | Priručnik |
|---|---|---|---|
| Gear box oil | after the first 50 h | Renew all oil and flush the case | str. 12 |
| Gear box oil | yearly | Change | str. 12 |
| Wire ropes | regularly | Smear with calcium base grease ZG-3 | str. 12 |
| Seals | regularly | Replace | str. 12 |
| Rope end on drum and foundation bolts | often | Check they are secure | str. 12 |
Tehničke specifikacije
| Rated load | 2 × 5 kN | str. 13 |
|---|---|---|
| Holding load | 2 × 5 kN | str. 13 |
| Rated hoisting speed | 0.14 m/s | str. 13 |
| Drum | Ø230 × (91 + 91) mm | str. 13 |
| Winding layers | 3 | str. 13 |
| Wire capacity | 2 × 15 m | str. 13 |
| Wire rope | 6 × 37 – Ø13 mm, 1700 MPa | str. 13 |
| Transmission ratio (air motor) | 75.43 | str. 13 |
| Transmission ratio (manual) | 30.73 | str. 13 |
| Total efficiency | 0.80 | str. 13 |
| Air motor | JFH 1/24, 4.41 kW, 890 r/min | str. 13 |
| Air consumption | 5.0 m³/min | str. 13 |
| Working pressure | 0.6 MPa | str. 13 |
| Overall dimensions | 982 × 350 × 600 mm | str. 13 |
| Weight | 390 kg | str. 13 |
| Gear oil | N46 mechanical oil, about 5 L first fill | str. 12 |
| Rope grease | calcium base grease ZG-3 | str. 12 |
| Standards | ISO 7364, GB1392-85 | str. 10 |
Rezervni dijelovi i kataloški brojevi
| Dio | Broj | Kol. | Priručnik |
|---|---|---|---|
| Spring | 241ZF200-01-13 | 1 | str. 16 |
| Ball bearing 6005 | GB/T276-94 | 4 | str. 16 |
| Ball bearing 6205 | GB/T276-94 | 1 | str. 16 |
| Oil seal PD25×40×10 | HG4-692-67 | 1 | str. 16 |
| Oil cup M10×1 | GB1152-84 | 1 | str. 16 |
| O-ring 14×2.4 | GB1235-76 | 2 | str. 16 |
| Washer 34×3.5 | GB1235-76 | 4 | str. 16 |
| Combined washer 33 | JB982-77 | 4 | str. 16 |
| Air control station | 241ZF213P1-05-0 | 2 | str. 15 |
Izvor: priručnik proizvođača „PD10 pneumatic accommodation ladder winch”, 34 str. Brojevi stranica odnose se na izvornik. Prije rada provjerite priručnik na brodu.
Stranica je automatski prevedena. Brojevi dijelova, kôdovi i stranice su kao u izvorniku.