Air-driven winch for hoisting and lowering the accommodation ladder, a short-time duty machine. A flanged air motor drives a split drum for two ropes through a reduction gear with a ratchet brake that limits the lowering speed; a hand crank on the gearbox shaft works it when there is no air, and a limit valve cuts the air while the crank is out. The manual covers readiness checks, operation with the three-position change valve, lubrication, rope renewal and opening the gearbox.

Klik suku cadang pada model untuk melihat nomor dan fungsinya.Buka manual 3D

Video pelatihan

How an accommodation ladder winch works: air motor, brake, hand crank (Zhenjiang PD10)▶ YouTube Shorts

Prosedur perawatan

Readiness for operation

  1. All operators must know the construction of the winch. hlm. 11
  2. The rope must leave the drum as on the general drawing; never wind it the wrong way. hlm. 11
  3. Check all connections for looseness, especially the rope end on the drum and the foundation bolts; check the brake. hlm. 11
  4. Clear any obstacles round the winch. hlm. 11
  5. Check the air fittings, pipes and air motor. hlm. 11
  6. Renew a rope with ten broken wires in 1 m or with reduced diameter. hlm. 11
  7. Check the oil level between the dipstick marks. hlm. 11
  8. Check the manual handle is stowed and the limit switch is reliable. hlm. 11

Operating the winch

  1. Pull out the pin on the accommodation ladder. hlm. 11
  2. Move the three-position change valve handle to lower, stop, hoist or capsize the ladder. hlm. 11
  3. To work by hand, keep the change valve in the middle, insert the handle on the square shaft end of the gearbox and crank. hlm. 12

Opening and reassembling the gearbox

  1. Unscrew the drain plug at the bottom of the gear box, drain the oil and remove the air motor. hlm. 12
  2. Strip the bolts of the big cover plate and pull it off together with the high-speed gear shaft; take out the bearings. hlm. 12
  3. Remove the big gear, ratchet and brake disc of the second stage in order. hlm. 12
  4. Reassemble in reverse order. hlm. 12
    Check the ratchet tooth direction; do not strip the ratchet unless necessary
  5. Refit only if the brake works without slipping. hlm. 12

Interval perawatan

KomponenKapanTindakanManual
Gear box oilafter the first 50 hRenew all oil and flush the casehlm. 12
Gear box oilyearlyChangehlm. 12
Wire ropesregularlySmear with calcium base grease ZG-3hlm. 12
SealsregularlyReplacehlm. 12
Rope end on drum and foundation boltsoftenCheck they are securehlm. 12

Spesifikasi teknis

Rated load2 × 5 kNhlm. 13
Holding load2 × 5 kNhlm. 13
Rated hoisting speed0.14 m/shlm. 13
DrumØ230 × (91 + 91) mmhlm. 13
Winding layers3hlm. 13
Wire capacity2 × 15 mhlm. 13
Wire rope6 × 37 – Ø13 mm, 1700 MPahlm. 13
Transmission ratio (air motor)75.43hlm. 13
Transmission ratio (manual)30.73hlm. 13
Total efficiency0.80hlm. 13
Air motorJFH 1/24, 4.41 kW, 890 r/minhlm. 13
Air consumption5.0 m³/minhlm. 13
Working pressure0.6 MPahlm. 13
Overall dimensions982 × 350 × 600 mmhlm. 13
Weight390 kghlm. 13
Gear oilN46 mechanical oil, about 5 L first fillhlm. 12
Rope greasecalcium base grease ZG-3hlm. 12
StandardsISO 7364, GB1392-85hlm. 10

Suku cadang dan nomor katalog

Suku cadangNomorJmlManual
Spring241ZF200-01-131hlm. 16
Ball bearing 6005GB/T276-944hlm. 16
Ball bearing 6205GB/T276-941hlm. 16
Oil seal PD25×40×10HG4-692-671hlm. 16
Oil cup M10×1GB1152-841hlm. 16
O-ring 14×2.4GB1235-762hlm. 16
Washer 34×3.5GB1235-764hlm. 16
Combined washer 33JB982-774hlm. 16
Air control station241ZF213P1-05-02hlm. 15

Sumber: manual produsen “PD10 pneumatic accommodation ladder winch”, 34 halaman. Nomor halaman mengacu ke dokumen asli. Periksa manual di kapal sebelum bekerja.

Halaman ini diterjemahkan otomatis. Nomor suku cadang, kode, dan halaman sesuai aslinya.