Pneumatic accommodation ladder winch

Air-driven winch for hoisting and lowering the accommodation ladder, a short-time duty machine. A flanged air motor drives a split drum for two ropes through a reduction gear with a ratchet brake that limits the lowering speed; a hand crank on the gearbox shaft works it when there is no air, and a limit valve cuts the air while the crank is out. The manual covers readiness checks, operation with the three-position change valve, lubrication, rope renewal and opening the gearbox.

点击模型上的零件,查看编号和用途。打开 3D 说明书

培训视频

How an accommodation ladder winch works: air motor, brake, hand crank (Zhenjiang PD10)▶ YouTube Shorts

保养规程

Readiness for operation

  1. All operators must know the construction of the winch. 第 11 页
  2. The rope must leave the drum as on the general drawing; never wind it the wrong way. 第 11 页
  3. Check all connections for looseness, especially the rope end on the drum and the foundation bolts; check the brake. 第 11 页
  4. Clear any obstacles round the winch. 第 11 页
  5. Check the air fittings, pipes and air motor. 第 11 页
  6. Renew a rope with ten broken wires in 1 m or with reduced diameter. 第 11 页
  7. Check the oil level between the dipstick marks. 第 11 页
  8. Check the manual handle is stowed and the limit switch is reliable. 第 11 页

Operating the winch

  1. Pull out the pin on the accommodation ladder. 第 11 页
  2. Move the three-position change valve handle to lower, stop, hoist or capsize the ladder. 第 11 页
  3. To work by hand, keep the change valve in the middle, insert the handle on the square shaft end of the gearbox and crank. 第 12 页

Opening and reassembling the gearbox

  1. Unscrew the drain plug at the bottom of the gear box, drain the oil and remove the air motor. 第 12 页
  2. Strip the bolts of the big cover plate and pull it off together with the high-speed gear shaft; take out the bearings. 第 12 页
  3. Remove the big gear, ratchet and brake disc of the second stage in order. 第 12 页
  4. Reassemble in reverse order. 第 12 页
    Check the ratchet tooth direction; do not strip the ratchet unless necessary
  5. Refit only if the brake works without slipping. 第 12 页

保养周期

项目周期操作说明书
Gear box oilafter the first 50 hRenew all oil and flush the case第 12 页
Gear box oilyearlyChange第 12 页
Wire ropesregularlySmear with calcium base grease ZG-3第 12 页
SealsregularlyReplace第 12 页
Rope end on drum and foundation boltsoftenCheck they are secure第 12 页

技术参数

Rated load2 × 5 kN第 13 页
Holding load2 × 5 kN第 13 页
Rated hoisting speed0.14 m/s第 13 页
DrumØ230 × (91 + 91) mm第 13 页
Winding layers3第 13 页
Wire capacity2 × 15 m第 13 页
Wire rope6 × 37 – Ø13 mm, 1700 MPa第 13 页
Transmission ratio (air motor)75.43第 13 页
Transmission ratio (manual)30.73第 13 页
Total efficiency0.80第 13 页
Air motorJFH 1/24, 4.41 kW, 890 r/min第 13 页
Air consumption5.0 m³/min第 13 页
Working pressure0.6 MPa第 13 页
Overall dimensions982 × 350 × 600 mm第 13 页
Weight390 kg第 13 页
Gear oilN46 mechanical oil, about 5 L first fill第 12 页
Rope greasecalcium base grease ZG-3第 12 页
StandardsISO 7364, GB1392-85第 10 页

备件与目录号

零件编号数量说明书
Spring241ZF200-01-131第 16 页
Ball bearing 6005GB/T276-944第 16 页
Ball bearing 6205GB/T276-941第 16 页
Oil seal PD25×40×10HG4-692-671第 16 页
Oil cup M10×1GB1152-841第 16 页
O-ring 14×2.4GB1235-762第 16 页
Washer 34×3.5GB1235-764第 16 页
Combined washer 33JB982-774第 16 页
Air control station241ZF213P1-05-02第 15 页

来源:制造商说明书《PD10 pneumatic accommodation ladder winch》,共 34 页。页码以原文为准。作业前请核对船上的说明书。

本页为自动翻译。零件号、代码和页码与原文一致。